Redmond Pitch
Mono-pitch DADU with vertical metal cladding and a single architectural cedar door.
Read case study →- City
- Redmond, WA
- SQ FT
- 940
- Done
- Sep 2024

Design-build DADU, AADU, garage conversion & addition contractor — Redmond, WA
Redmond's ADU code is straightforward but the city is strict on stormwater and tree retention. We coordinate civil engineering early on Redmond projects so permitting doesn't stall on a drainage plan that didn't account for the existing canopy.
We file in Redmond every month — we know which lot configurations sail through and which need pre-application meetings to avoid corrections.
Two-page fillable PDF tuned to Redmond, WA — owner & site fields, project intent, and the local site conditions we always pre-screen (R-4 through R-8). Fill it on any device, email it back, and we'll set up a free 30-minute feasibility call.
Stand-alone backyard cottages built from the ground up — engineered for rental income, multi-generational living, or your home office.
02 //Seamlessly integrated additions — basement, ground-floor, or wing conversions that maintain the architectural integrity of your existing home.
03 //Convert an under-used garage into a high-end studio, office, or rental quarter without surrendering your driveway.
04 //Structural expansions for growing families — second stories, primary suites, kitchen extensions. Steel, glass, and Pacific Northwest materials.
05 //Full-service general contracting for remodels, renovations, and ground-up custom homes throughout the Puget Sound region.
06 //Before you commit, we analyze zoning, lot coverage, setbacks, utilities, and ROI so you have a real number — not a guess.
Indicative turn-key ranges for Redmond, WA — design, permits, construction and finish carpentry included. Final number depends on lot conditions, finishes and the 10–14 wk Redmond permit timeline.

Mono-pitch DADU with vertical metal cladding and a single architectural cedar door.
Read case study →“Golden turned a permitting nightmare into a finished, beautiful backyard cottage. They were on schedule every single week, and the fixed-price contract held to the dollar.”
“We interviewed five general contractors. Golden was the only one who walked our lot before quoting. Their structural engineer caught a foundation issue everyone else missed.”
“They converted our garage into a long-term rental that pays our mortgage. Permitted, built, and tenant-ready in 14 weeks — and the finishes look like a custom home.”
RZC 21.72 requires 35% existing canopy retention on residential lots, the strictest in King County. We do an arborist walk before locating the ADU pad — sometimes a 5-foot footprint shift saves a significant tree and a replanting plan.
Yes, RZC 21.08.220 allows one of each per lot, provided combined floor area stays within FAR limits and lot coverage is ≤45%.
Not always. Sub-metering off the existing service is allowed. A separate meter is required only if combined fixture count exceeds the existing service size — usually 1" line is sufficient.
No, Redmond removed the owner-occupancy requirement in 2022. Both units can be rented out long-term.
10–14 weeks from intake on a clean submittal. The civil/stormwater review is typically the long pole — we engage civil engineering during schematic design to compress that timeline.
Stand-alone backyard cottages built from the ground up — engineered for rental income, multi-generational living, or your home office.
Seamlessly integrated additions — basement, ground-floor, or wing conversions that maintain the architectural integrity of your existing home.
Convert an under-used garage into a high-end studio, office, or rental quarter without surrendering your driveway.
Structural expansions for growing families — second stories, primary suites, kitchen extensions. Steel, glass, and Pacific Northwest materials.
Full-service general contracting for remodels, renovations, and ground-up custom homes throughout the Puget Sound region.
Before you commit, we analyze zoning, lot coverage, setbacks, utilities, and ROI so you have a real number — not a guess.
Turn-key ADUs in Redmond run roughly $295–$465 per square foot all-in for 2026 contracts, depending on lot access, foundation type, and finish package. A 600 sqft one-bedroom DADU typically closes between $215K and $310K including permits, side-sewer connection, and electrical service work. The biggest swing factors in Redmond are soils (pier-and-beam adds $18–32K over a slab), required stormwater detention on lots over 2,000 sqft of impervious, and whether a panel upgrade to 200A is needed. Our Redmond feasibility report gives you a ±15% number in two weeks for $1,500, credited to the build contract.
Median Redmond ADU permit issuance is currently 8–16 weeks from a clean submittal in 2026, faster on pre-engineered catalog plans. The bottlenecks are almost never the zoning review — they are side-sewer capacity letters, drainage review on lots with steep slopes, and addressing assignments. We pull a pre-application meeting with Redmond planning before drawings start, which typically saves one full review cycle (4–6 weeks). RCW 36.70A.681 requires most WA jurisdictions to permit ADUs ministerially when zoning is met, which has trimmed median timelines roughly 30% versus 2022.
Under HB 1337 / RCW 36.70A.681, Redmond must allow at least one DADU up to 1,000 sqft on any residential lot zoned for single-family, with height to 24 ft and standard 5 ft side/rear setbacks unless local code is more permissive. Many Redmond zones allow a second ADU (a stacked DADU or AADU + DADU combo). Your ceiling is usually lot coverage, not the 1,000 sqft cap — once you add the primary house footprint plus the new DADU plus impervious driveway and walks, you frequently hit the lot-coverage ratio before the size cap. Our zoning lookup checks both.
No. Owner-occupancy requirements were preempted statewide by RCW 36.70A.681 — Redmond cannot impose an owner-occupancy condition on either the primary or accessory unit. That means you can build a DADU and rent both units, build a DADU for a family member while living off-site, or build to sell. Short-term rentals (≤30 days) are still governed by local STR codes, which vary; long-term rentals (30+ days) face no special restriction beyond standard landlord-tenant law (RCW 59.18).
Yes, in most Redmond zones, since the 2023 unit-lot subdivision and condominiumization changes paired with HB 1110 middle-housing reform. The two common pathways are: (1) unit-lot subdivision — carving a new fee-simple lot around the DADU, requires a short plat (~4–6 months) and shared-driveway easements; (2) condominium declaration under RCW 64.34 — faster (~2 months) but lenders sometimes resist financing a 2-unit condo. We model both at feasibility because the right answer depends on your hold-vs-sell horizon and current lender appetite.
2026 Redmond ADU rent comps for a 1-bedroom DADU built to current finish standards land in a wide band depending on submarket — generally $1,950–$3,200/mo for a long-term lease, with mid-term (30–90 day) commanding 10–25% premium. Net operating income after vacancy (5%), management (8%), maintenance reserve (5%), and property tax/insurance increment typically hits 62–70% of gross. At today's construction cost and rent comps the unleveraged cap on a new Redmond DADU pencils 4.8–6.4%, with leveraged cash-on-cash 7–11% using a HELOC or renovation loan.
Yes, but predictably. The county assessor adds the marginal improvement value (typically 55–70% of construction cost, not 100%) to your assessed value, and the levy rate applies to that increment under RCW 84.40.0301. For a $270K-cost DADU in Redmond, expect roughly $1,900–$3,100/yr of additional property tax depending on your levy code area. The increment is partially offset because King and Pierce County both classify newly created ADUs into a single building-permit assessment cycle, not a full reassessment of the primary house.
Start with a paid feasibility study — not a plan set. The feasibility deliverable is a 12–20 page report covering Redmond zoning analysis, setbacks and lot-coverage math, water meter sizing, side-sewer capacity, electrical service amperage, critical-areas screening, three layout options, and a ±15% budget. It costs $1,500 and is credited to the construction contract. This step eliminates the two most expensive surprises — an undersized water service and an unmappable side sewer — before you spend $15K+ on full design. Schedule a free 20-minute scoping call to confirm fit.