Skip to main content
Redmond, Washington aerial view
Photo: Wikimedia Commons
REGION / REDMOND, WA

Redmond
ADU Builder.

Design-build DADU, AADU, garage conversion & addition contractor — Redmond, WA

Redmond's ADU code is straightforward but the city is strict on stormwater and tree retention. We coordinate civil engineering early on Redmond projects so permitting doesn't stall on a drainage plan that didn't account for the existing canopy.

10–14 wk
Permit Timeline
5,000 sqft
Lot Minimum
6+
Neighborhoods
12 yrs
Local Experience
ZONING / LOCAL CODE

R-4 through R-8 — ADU + DADU permitted under RZC 21.08

We file in Redmond every month — we know which lot configurations sail through and which need pre-application meetings to avoid corrections.

NEIGHBORHOODS WE SERVE
  • ·Education Hill
  • ·Idylwood
  • ·Grass Lawn
  • ·Sammamish Valley
  • ·Bear Creek
  • ·Overlake

Building in Redmond

FIELD_NOTES
WHY_HERE

What we lean into

  • DADU + AADU both permitted on the same lot under RZC 21.08.220
  • Premium tenant pool — Microsoft, Meta and Nintendo within a 10-min commute
  • Education Hill lots are oversized, allowing larger 1,200 sqft DADUs
  • Owner-occupancy rule was repealed in 2022
WATCH_OUT

What we plan around

  • Tree retention: 35% canopy retention required — Redmond is the strictest in King County
  • Stormwater: any net new impervious >2,000 sqft triggers full LID design
  • Critical aquifer recharge area covers Bear Creek and parts of Sammamish Valley
  • Right-of-way frontage improvements can be required on collector streets
CHECKLIST_01 / REDMOND_FEASIBILITY

Redmond ADU Permit Checklist

Two-page fillable PDF tuned to Redmond, WA — owner & site fields, project intent, and the local site conditions we always pre-screen (R-4 through R-8). Fill it on any device, email it back, and we'll set up a free 30-minute feasibility call.

  • · Pre-mapped to Redmond zoning & 10–14 wk permit window
  • · Editable on Preview, Acrobat, Chrome — no signup
  • · Email back to office@golden-adu.com
FILE / redmond-adu-permit-checklist.pdf
Email completed PDF →

Or call (425) 642-4142

Cost to build an ADU in Redmond

PRICE_GUIDE

Indicative turn-key ranges for Redmond, WA — design, permits, construction and finish carpentry included. Final number depends on lot conditions, finishes and the 10–14 wk Redmond permit timeline.

DADU
$140K – $400K

6–8 months · 400–1,000 sqft

DETACHED ADU in Redmond
AADU
$95K – $320K

4–5 months · 300–800 sqft

ATTACHED ADU in Redmond
Garage
$65K – $240K

3–4 months · 200–600 sqft

GARAGE CONV. in Redmond
Additions
$120K – $480K

Project dependent · Custom

MODERN ADDITIONS in Redmond

Recent in Redmond

ALL PROJECTS →
Redmond Pitch — Detached ADU in Redmond, WA
REF_4712 · Detached ADU

Redmond Pitch

Mono-pitch DADU with vertical metal cladding and a single architectural cedar door.

Read case study →
City
Redmond, WA
SQ FT
940
Done
Sep 2024
CLIENT_REPORT
Golden turned a permitting nightmare into a finished, beautiful backyard cottage. They were on schedule every single week, and the fixed-price contract held to the dollar.
Marcus Henderson
Homeowner · Ballard, Seattle · 2023
REF_4492
We interviewed five general contractors. Golden was the only one who walked our lot before quoting. Their structural engineer caught a foundation issue everyone else missed.
Sade Okafor
Owner-Architect · Bellevue · 2023
REF_4376
They converted our garage into a long-term rental that pays our mortgage. Permitted, built, and tenant-ready in 14 weeks — and the finishes look like a custom home.
Jin & Lauren Park
Investor Homeowners · Kirkland · 2024
REF_4218

Redmond ADU FAQ

FAQ_05
01

What's Redmond's tree retention requirement?

RZC 21.72 requires 35% existing canopy retention on residential lots, the strictest in King County. We do an arborist walk before locating the ADU pad — sometimes a 5-foot footprint shift saves a significant tree and a replanting plan.

02

Can I build both a DADU and an AADU on a Redmond lot?

Yes, RZC 21.08.220 allows one of each per lot, provided combined floor area stays within FAR limits and lot coverage is ≤45%.

03

Will my Redmond ADU need its own water meter?

Not always. Sub-metering off the existing service is allowed. A separate meter is required only if combined fixture count exceeds the existing service size — usually 1" line is sufficient.

04

Is owner-occupancy required in Redmond?

No, Redmond removed the owner-occupancy requirement in 2022. Both units can be rented out long-term.

05

How long does Redmond plan review really take?

10–14 weeks from intake on a clean submittal. The civil/stormwater review is typically the long pole — we engage civil engineering during schematic design to compress that timeline.

Build in Redmond.
Free site walk.

REQUEST CONSULTATION

CITY_INTEL / Redmond · Verified 2026-01-15

Redmond ADU intelligence

Redmond has aligned with HB 1337 and is one of the most permissive ADU markets in east King County. The city's modern subdivisions make many ADU projects straightforward, but the network of critical-area streams (Bear, Evans) and wetlands quietly shapes feasibility on a meaningful share of parcels.

Zoning

Redmond allows detached ADU (DADU) on single-family lots (up to 1,000 sf), no owner-occupancy requirement, and no off-street parking required near transit.

Permit lead-time

1028 weeks

Includes one typical correction cycle.

DADU cost range

$291k–$541k · typical $395k

Cost tier 5/5 · excludes land.

Typical end-to-end

~60 weeks

Feasibility → final sign-off, typical scenario.

What slows ADUs here

  • critical-area / stream-buffer reviews
  • geotech on Education Hill
  • tree-retention plans

Feasibility blockers to map early

  • critical-area streams (Bear, Evans creeks)
  • Education Hill slope
  • wetland buffers in Overlake
  • Bear Creek, Evans Creek, and various wetlands drive critical-area review.
  • RZC tree-retention rules trigger arborist review on lots above the tree-unit threshold.
FAQ

Frequently asked

  • How much does an ADU cost in Redmond, WA in 2026?

    Turn-key ADUs in Redmond run $300–$400 per square foot all-in for 2026 contracts. A 600 sqft one-bedroom DADU typically closes between $180K and $240K including permits, side-sewer connection, and electrical service work. Cost swing factors in Redmond: soils (pier-and-beam adds $18–32K over a slab), required stormwater detention on lots over 2,000 sqft of impervious, and whether a panel upgrade to 200A is needed. Our Redmond feasibility report gives you a ±15% number in two weeks for $1,500, credited to the build contract.

    Go deeper: Redmond ADU cost breakdown

  • How long does the ADU permit take in Redmond?

    Median Redmond ADU permit issuance is currently 8–16 weeks from a clean submittal in 2026, faster on pre-engineered catalog plans. The bottlenecks are almost never zoning — they are side-sewer capacity letters, drainage review on lots with steep slopes, and addressing. We pull a pre-application meeting with Redmond planning before drawings start, which typically saves one full review cycle (4–6 weeks). RCW 36.70A.681 requires WA jurisdictions to permit ADUs ministerially when zoning is met, which has trimmed median timelines roughly 30% versus 2022.

    Go deeper: Redmond ADU permit timeline

  • What size DADU can I build on my Redmond lot?

    Under HB 1337 / RCW 36.70A.681, Redmond must allow at least one DADU up to 1,000 sqft on any residential lot zoned for single-family, with height to 24 ft and standard 5 ft side/rear setbacks unless local code is more permissive. Many Redmond zones allow a second ADU (stacked DADU or AADU + DADU). Your ceiling is usually lot coverage, not the 1,000 sqft cap — primary footprint + DADU + impervious drive often hits the coverage ratio first. Our zoning lookup checks both.

    Go deeper: Redmond ADU zoning lookup

  • Do I need to live on the property to build a Redmond ADU?

    No. Owner-occupancy requirements were preempted statewide by RCW 36.70A.681 — Redmond cannot impose an owner-occupancy condition on either unit. You can build a DADU and rent both units, build for a family member while living off-site, or build to sell. Short-term rentals (≤30 days) are still governed by local STR codes; long-term rentals (30+ days) face no special restriction beyond standard landlord-tenant law (RCW 59.18).

    Go deeper: Redmond ADU permit timeline

  • Can I subdivide and sell the ADU separately in Redmond?

    Yes, in most Redmond zones, since the 2023 unit-lot subdivision and condominiumization changes paired with HB 1110. Two pathways: (1) unit-lot subdivision — carving a fee-simple lot around the DADU, requires a short plat (~4–6 months) and shared-driveway easements; (2) condominium declaration under RCW 64.34 — faster (~2 months) but lenders sometimes resist a 2-unit condo. We model both at feasibility because the right answer depends on hold-vs-sell horizon and current lender appetite.

    Go deeper: Redmond ADU permit timeline

  • What rental income will a Redmond ADU generate?

    2026 Redmond comps for a 1-bedroom DADU built to current finish standards land $1,950–$3,200/mo long-term, with mid-term (30–90 day) 10–25% higher. Net operating income after vacancy (5%), management (8%), maintenance reserve (5%), and property tax/insurance increment typically hits 62–70% of gross. At today's construction cost and rent comps the unleveraged cap on a new Redmond DADU pencils 4.8–6.4%, with leveraged cash-on-cash 7–11% using a HELOC or renovation loan.

    Go deeper: Redmond ADU permit timeline

  • Will an ADU raise my Redmond property taxes?

    Yes, but predictably. The county assessor adds the marginal improvement value (typically 55–70% of construction cost, not 100%) to your assessed value, and the levy rate applies to that increment under RCW 84.40.0301. For a $210K-cost DADU in Redmond, expect roughly $1,900–$3,100/yr of additional property tax depending on your levy code area. The primary residence assessment is not reopened — only the new improvement is added.

    Go deeper: Redmond ADU permit timeline

  • What's the first step to build an ADU in Redmond?

    Start with a paid feasibility study — not a plan set. The 12–20 page report covers Redmond zoning analysis, setbacks and lot-coverage math, water meter sizing, side-sewer capacity, electrical service amperage, critical-areas screening, three layout options, and a ±15% budget. $1,500, credited to the build contract. This step eliminates the two most expensive surprises — undersized water service and an unmappable side sewer — before you spend $15K+ on full design.

    Go deeper: Redmond ADU permit timeline

  • Can I build a basement ADU in Redmond?

    Yes when ceiling height, light/ventilation, and emergency egress meet IRC R310. Redmond basements that fall short on ceiling (need 7'-0" min, 6'-8" at beams) or egress window opening (5.7 sqft net clear, 24" high, 20" wide, sill ≤44" AFF) typically need underpinning or window-well excavation. Cost band on a clean Redmond basement conversion is $145–$220K including new full bath, kitchenette, separate exterior entry, fire separation, and dedicated panel feeder.

    Go deeper: Redmond ADU permit timeline

  • What financing works for a Redmond ADU in 2026?

    Five common Redmond structures: (1) HELOC against the primary, fastest, 8.0–9.5% APR, no separate appraisal; (2) renovation loan (Fannie HomeStyle / Freddie CHOICERenovation), single-close, uses after-built value, 7.1–7.9%; (3) cash-out refi, only if existing mortgage is above market; (4) construction-to-perm, best for ground-up DADUs with 12-month draw; (5) WSHFC ADU pilot at ~3.5–4.25% for owner-occupants ≤120% AMI. We coordinate with five Redmond-area credit unions and three banks with ADU-experienced underwriters.

    Go deeper: Redmond ADU permit timeline

  • Do I need a sprinkler system for my Redmond ADU?

    Usually no. Per IRC R313 and WA state amendments, single-family dwellings and ADUs under 5,000 sqft of fire-flow calculation area generally do not require residential sprinklers in Redmond. Triggers that flip the answer: total combined floor area of primary + ADU exceeding 5,000 sqft, structures over three stories above grade, lots beyond fire-flow distance, or specific local fire-marshal interpretations on shared-wall AADU configurations. Verified at feasibility against the Redmond fire marshal's current rule sheet.

    Go deeper: Redmond ADU permit timeline

  • Can I use my Redmond ADU as a short-term rental?

    Sometimes. WA preemption under RCW 36.70A.681 forces Redmond to allow ADUs but does not preempt short-term-rental ordinances. Some Puget Sound jurisdictions require owner-occupancy on at least one unit for STR, cap STR nights per year, or require a separate STR permit and lodging-tax registration with WA DOR. Long-term (30+ day) rentals always work. Check our Redmond-specific STR rules before underwriting any STR-dependent pro forma.

    Go deeper: Redmond ADU permit timeline

  • What permits do I need to build an ADU in Redmond?

    Standard Redmond ADU permit stack: building permit (covers structural, mechanical, plumbing under combined review), side-sewer permit (separate, issued by Redmond utilities), water meter capacity check (may trigger upsize fee), electrical permit (issued by L&I in most Redmond unincorporated areas, by the city in Redmond proper), and where applicable: drainage review, addressing, demolition, right-of-way for utility cut. We pull all permits on your behalf and itemize fees as a pass-through, not a markup.

    Go deeper: Redmond ADU permit timeline

  • How tall can my Redmond DADU be?

    Most Redmond zones now allow 24 ft to midpoint of roof for DADUs under HB 1337, with some pre-existing zones permitting up to 30 ft on larger lots. Height is measured from existing grade or ABE (Average Building Elevation), and roof overhangs typically don't count. Two-story DADUs at 22–24 ft midpoint generally fit single-family neighborhoods without bulk objections, while clearing the head-height needed for a code stair and 8 ft upper-floor ceilings.

    Go deeper: Redmond ADU permit timeline

  • Do I need parking for my Redmond ADU?

    No new parking is required under RCW 36.70A.681 for ADUs within ½ mile of a major transit stop or in lots ≤4,000 sqft, and Redmond's implementing code largely preserves that exemption citywide. For lots outside that band, Redmond may require one off-street stall per ADU. Tandem parking on the existing driveway typically qualifies, which means most Redmond lots add a DADU without adding new pavement.

    Go deeper: Redmond ADU permit timeline

  • Can I build an ADU in a Redmond HOA?

    Sometimes. RCW 64.38.034 (effective 2024) prohibits Redmond HOAs from banning ADUs outright on lots zoned for single-family, but HOAs may impose design covenants — siding material, roof pitch, façade articulation. We've built in Redmond HOAs by submitting design concepts to the architectural review board in parallel with permit submittal, which keeps the schedule intact. Add 4–8 weeks for ARB review on top of city permit time.

    Go deeper: Redmond ADU permit timeline

  • What's the cheapest way to add an ADU in Redmond?

    Garage conversion on an existing slab, kitchen on the existing plumbing wall, no electrical service upgrade, no critical-areas review. Real-world floor for a clean Redmond conversion is $185–$235K in 2026 dollars. Below that price point you are usually looking at an unpermitted job that will not refinance, insure, or transfer at sale. The price assumes IRC R310 egress is achievable without major exterior wall surgery.

    Go deeper: Redmond ADU permit timeline

  • Do I need a drainage report for my Redmond ADU?

    Triggered when new + replaced impervious surface exceeds the Redmond threshold (commonly 2,000 sqft in King County / 5,000 sqft of land disturbance). Most 600 sqft DADUs with a permeable walkway stay under. Lots over the threshold need a drainage report by a WA-licensed civil engineer and may need detention — vault or rain garden — adding $8–22K. Site planning around impervious is the cheapest fix; we model it during feasibility.

    Go deeper: Redmond ADU permit timeline

  • Will my Redmond ADU need an energy code upgrade?

    Yes — every new ADU in Redmond is permitted to the current 2021 WSEC residential energy code (IECC R406 path 1, 2, or 3 with WA amendments). Typical compliance package: R-21 walls (R-23 effective with continuous), R-49 attic, U-0.28 windows, sealed combustion or heat-pump HVAC, ERV/HRV for IAQ, and blower-door test ≤3 ACH50. The energy package adds roughly $8–14K versus 2018 code; required regardless of finish tier.

    Go deeper: Redmond ADU permit timeline

  • Can I add a second ADU on my Redmond lot?

    Often yes. HB 1337 requires Redmond to allow two ADUs on lots zoned for single-family in jurisdictions over 25,000 population, configured as DADU + AADU, two AADUs, or a stacked two-unit DADU. Some Redmond zones restrict to one ADU + JADU. Combined floor area cap is typically 2,000 sqft for both ADUs combined. We map your specific zone's ADU count at feasibility — answer depends on the parcel's zone designation, not citywide rules.

    Go deeper: Redmond ADU zoning lookup

  • What's the difference between a DADU and AADU in Redmond?

    A DADU (detached) is a freestanding structure separated from the primary house by at least 5 ft. An AADU (attached) shares at least one wall with the primary, typically as an addition or interior conversion with a separate entrance. Redmond treats both under the same RCW 36.70A.681 preemption — same size cap (up to 1,000 sqft), same setback relief, same parking exemption. Cost differs: DADUs cost ~12–18% more per sqft because they need a complete envelope; AADUs share existing walls and roof.

    Go deeper: Redmond ADU permit timeline

  • Do I need a survey for my Redmond ADU?

    Recommended in nearly every case. Redmond reviewers require precise setback measurements from property lines, not from the curb or fence. A recent boundary survey (BLA-compliant, sealed by a WA-licensed surveyor) costs $1,200–$2,800 and locks the setback math. The exception: lots with a recent (≤5 year) recorded survey that has not been disturbed by fence or grading work. We include survey coordination in feasibility deliverables.

    Go deeper: Redmond ADU permit timeline

  • How do utility hookups work for a Redmond ADU?

    Three utility paths in Redmond: (1) water — extend from the existing meter if size supports flow demand; otherwise upsize meter ($3,500–$11,000 capacity fee); (2) sewer — separate side-sewer tap from main, or shared connection with cleanout, requires Redmond utilities permit ($1,800–$4,400); (3) electrical — sub-feeder from primary panel if capacity allows, otherwise 200A service upgrade ($4,800–$9,200). Gas is optional and depends on cooktop/water-heater choice. We submit all utility paperwork in parallel with the building permit.

    Go deeper: Redmond ADU permit timeline

  • Will my Redmond ADU need fire separation from the primary house?

    When wall-to-wall separation is less than 5 ft, IRC R302 requires 1-hour fire-rated assemblies on both exterior walls facing each other (5/8" Type X gypsum, no openings), and at separation less than 3 ft a 1-hour fire-rated assembly with sprinklers may be required by Redmond fire marshal. Detached DADUs at 5 ft+ separation typically need no special fire rating — standard envelope assemblies satisfy code.

    Go deeper: Redmond ADU permit timeline

  • Can I sell my Redmond ADU as a condo unit?

    Yes via condominium declaration under RCW 64.34, typically faster than unit-lot subdivision (~2 months vs 4–6) but with lender constraints — many residential lenders require a minimum 3-unit condo for conventional financing, so a 2-unit condo can limit buyer pool. Portfolio lenders and non-QM lenders work with 2-unit condos. We refer clients to a WA real-estate attorney to draft the declaration and CC&Rs; budget $4,800–$8,500 for legal.

    Go deeper: Redmond ADU permit timeline

CITY_DOSSIER / REDMOND· 47.6740°N 122.1215°W

Built in Redmond — what we know that the spec sheet won't tell you.

A live dossier from our field PMs: the permit counter, the soils, the bylaw that just changed, and the streets where ADUs are already cash-flowing.

Map · King CountyOpen ↗
Redmond
Drive-time from yard · ≈ 26 min via 520© OpenStreetMap contributors
Population78,213
Median lot7,800 sq ft
ADU permits / yr64 (2024)
Build cost band$330–380 / sq ft
Right now in Redmond
Air quality · US AQI
Source · Google Maps PlatformAffects pour windows + finish schedule
LIVE_INTEL / REDMOND · 6 SIGNALS
Pour-feasibility · todayLoading
/ 100 · Awaiting feed
  • Weather feed loading
Derived live · Redmond weather + AQI
Sun rhythm · RedmondDaylight
5:25 AM
9:05 PM
15h 40m daylight
Golden hour · 8:18 PM
98% of June peak
NOAA solar formulas · computed
Moon · cure-week planner
Loading

We track lunar weeks for slab pours — clear nights drop ambient temperature faster, which slows surface curing. Schedule wet slabs midweek under waxing light.

Conway approx · computed
Seismic · 24h within 60 miLoading
USGS earthquake.usgs.gov
On-site clock · Redmond
—:—
· Pacific

Loading. Our standard crew window is 7:00–17:00 weekdays — noise ordinances in most Puget Sound cities allow exterior power tools only inside that band.

America/Los_Angeles · live
Build-rules pulseWithin window
7:00–17:00
Power-tool window · Mon–Fri
ADU permits YTD pace

Sunday exterior work is restricted in most Puget Sound jurisdictions. We sequence interior trades around it.

Redmond municipal code · annualized
SPEC_02 / CITY_INTEL

Environmental & locational intelligence

03 / SOLAR_POTENTIAL

Rooftop solar at this address

04 / POLLEN_FORECAST

Tree · Grass · Weed (3-day)

05 / WALK_SCORE

0.5-mile amenity density

06 / NWS_ALERTS

Active NWS weather alerts

LOCATIONAL_INTEL / REDMOND
Drive times from RedmondLoading

Calculating live drive times to four metro anchors…

Real commute time matters for ADU rent comps — and for our crews. We keep installs within a 60-minute radius of our Puget Sound yard.

Data provenance

Drive times pulled live from the Google Routes API (traffic-aware matrix). Each request is timestamped so you can see exactly when the numbers were last refreshed — no stale brochure data.

Google Routes API · traffic-aware
Street view · RedmondLive imagery
Recent Google Street View imagery centered near Redmond

Lot context matters as much as zoning. We pre-screen access, slope, and tree canopy from imagery before scheduling the site visit.

Google Street View · proxied
Tidal window · RedmondLoading

Waterfront lots: shoreline excavation and barge access windows depend on these. We schedule pours away from extreme low tides when the soils dry unevenly.

NOAA · — mi away
Recent permits · RedmondLoading

Open-data signal of nearby construction velocity — useful for ADU comps and for anticipating examiner workload.

data.seattle.gov · ~3 mi radius
Permit counter · Redmond
Redmond Planning & Community Development
15670 NE 85th St, Redmond 98052
Mon–Fri 8a–5p · digital pre-app required
Local zoning quirk

Education Hill & Grass Lawn lots often hit tree-retention thresholds before FAR — plan crown protection early.

Sourced from Golden State ADU field PMs · WA Lic. GOLDESA747LZ
Best build window
May → October

Bar shows pour-friendly months · dot marks the current month.

  • Seismic
    SDC D · stable plateau geology
  • Soil
    Glacial till on plateau, peat pockets near Sammamish River
  • Climate
    Slightly drier than Seattle (≈34″/yr), east-of-lake sun bonus
  • Topography
    Mostly gentle slope
  • HOA prevalence
    ≈ 28% — Education Hill, Grass Lawn, Idylwood
Transit signal
2 Line Downtown Redmond + Marymoor Village stations (2024)

Station-area lots earn the largest rent premium in this market.

School signal
Lake Washington School District

Rental yield estimate: $2,900–3,700 / mo · Microsoft proximity drives demand

Local incentive

Tech-corridor zoning allows live/work ADU configurations near Overlake

Hidden gem

Tree-retained DADUs in Education Hill pre-lease in <14 days.

Build cost · Redmond vs Puget Sound
+$30 vs regional median
$250 / sqftRedmond$355$425 / sqft
Other cities we hold a permit history in
REDMOND / BUILD

Building an ADU in Redmond? Get a real number on your lot — free.

Redmond is one of our top markets. We'll send a Redmond-specific feasibility brief (zoning, fees, soils, timeline) for your address within 48h.

  • Redmond permit + fee schedule for 2026
  • Lot-specific zoning + setback diagram
  • Free 2-page PDF within 48h
Replies within 1 business day
WA Lic. GOLDESA747LZBuilding since 2012

Redmond owners are 1 of every 3 ADUs we delivered in 2026.

Direct line · Golden State ADU(425) 642-4142

We reply within 1 business day. No spam, ever.

◇ No sales script · No spam · Your details stay with our team