Redmond
ADU Builder.

Design-build DADU, AADU, garage conversion & addition contractor — Redmond, WA

Redmond's ADU code is straightforward but the city is strict on stormwater and tree retention. We coordinate civil engineering early on Redmond projects so permitting doesn't stall on a drainage plan that didn't account for the existing canopy.

10–14 wk
Permit Timeline
5,000 sqft
Lot Minimum
6+
Neighborhoods
12 yrs
Local Experience
ZONING / LOCAL CODE

R-4 through R-8 — ADU + DADU permitted under RZC 21.08

We file in Redmond every month — we know which lot configurations sail through and which need pre-application meetings to avoid corrections.

NEIGHBORHOODS WE SERVE
  • ·Education Hill
  • ·Idylwood
  • ·Grass Lawn
  • ·Sammamish Valley
  • ·Bear Creek
  • ·Overlake

Building in Redmond

FIELD_NOTES
WHY_HERE

What we lean into

  • DADU + AADU both permitted on the same lot under RZC 21.08.220
  • Premium tenant pool — Microsoft, Meta and Nintendo within a 10-min commute
  • Education Hill lots are oversized, allowing larger 1,200 sqft DADUs
  • Owner-occupancy rule was repealed in 2022
WATCH_OUT

What we plan around

  • Tree retention: 35% canopy retention required — Redmond is the strictest in King County
  • Stormwater: any net new impervious >2,000 sqft triggers full LID design
  • Critical aquifer recharge area covers Bear Creek and parts of Sammamish Valley
  • Right-of-way frontage improvements can be required on collector streets
CHECKLIST_01 / REDMOND_FEASIBILITY

Redmond ADU Permit Checklist

Two-page fillable PDF tuned to Redmond, WA — owner & site fields, project intent, and the local site conditions we always pre-screen (R-4 through R-8). Fill it on any device, email it back, and we'll set up a free 30-minute feasibility call.

  • · Pre-mapped to Redmond zoning & 10–14 wk permit window
  • · Editable on Preview, Acrobat, Chrome — no signup
  • · Email back to hello@goldenstateadubuilders.com
FILE / redmond-adu-permit-checklist.pdf
Email completed PDF →

Or call (206) 555-0192

Cost to build an ADU in Redmond

PRICE_GUIDE

Indicative turn-key ranges for Redmond, WA — design, permits, construction and finish carpentry included. Final number depends on lot conditions, finishes and the 10–14 wk Redmond permit timeline.

DADU
$325K – $525K

6–8 months · 400–1,000 sqft

DETACHED ADU in Redmond
AADU
$185K – $345K

4–5 months · 300–800 sqft

ATTACHED ADU in Redmond
Garage
$145K – $235K

3–4 months · 200–600 sqft

GARAGE CONV. in Redmond
Additions
$220K – $750K+

Project dependent · Custom

MODERN ADDITIONS in Redmond

Recent in Redmond

ALL PROJECTS →
Redmond Pitch — Detached ADU in Redmond, WA
REF_4712 · Detached ADU

Redmond Pitch

Mono-pitch DADU with vertical metal cladding and a single architectural cedar door.

Read case study →
City
Redmond, WA
SQ FT
940
Done
Sep 2024
CLIENT_REPORT
Golden turned a permitting nightmare into a finished, beautiful backyard cottage. They were on schedule every single week, and the fixed-price contract held to the dollar.
Marcus Henderson
Homeowner · Ballard, Seattle · 2023
REF_4492
We interviewed five general contractors. Golden was the only one who walked our lot before quoting. Their structural engineer caught a foundation issue everyone else missed.
Sade Okafor
Owner-Architect · Bellevue · 2023
REF_4376
They converted our garage into a long-term rental that pays our mortgage. Permitted, built, and tenant-ready in 14 weeks — and the finishes look like a custom home.
Jin & Lauren Park
Investor Homeowners · Kirkland · 2024
REF_4218

Redmond ADU FAQ

FAQ_05
01

What's Redmond's tree retention requirement?

RZC 21.72 requires 35% existing canopy retention on residential lots, the strictest in King County. We do an arborist walk before locating the ADU pad — sometimes a 5-foot footprint shift saves a significant tree and a replanting plan.

02

Can I build both a DADU and an AADU on a Redmond lot?

Yes, RZC 21.08.220 allows one of each per lot, provided combined floor area stays within FAR limits and lot coverage is ≤45%.

03

Will my Redmond ADU need its own water meter?

Not always. Sub-metering off the existing service is allowed. A separate meter is required only if combined fixture count exceeds the existing service size — usually 1" line is sufficient.

04

Is owner-occupancy required in Redmond?

No, Redmond removed the owner-occupancy requirement in 2022. Both units can be rented out long-term.

05

How long does Redmond plan review really take?

10–14 weeks from intake on a clean submittal. The civil/stormwater review is typically the long pole — we engage civil engineering during schematic design to compress that timeline.

Build in Redmond.
Free site walk.

REQUEST CONSULTATION
FAQ

Frequently asked

  • How much does an ADU cost in Redmond, WA in 2026?

    Turn-key ADUs in Redmond run roughly $295–$465 per square foot all-in for 2026 contracts, depending on lot access, foundation type, and finish package. A 600 sqft one-bedroom DADU typically closes between $215K and $310K including permits, side-sewer connection, and electrical service work. The biggest swing factors in Redmond are soils (pier-and-beam adds $18–32K over a slab), required stormwater detention on lots over 2,000 sqft of impervious, and whether a panel upgrade to 200A is needed. Our Redmond feasibility report gives you a ±15% number in two weeks for $1,500, credited to the build contract.

  • How long does the ADU permit take in Redmond?

    Median Redmond ADU permit issuance is currently 8–16 weeks from a clean submittal in 2026, faster on pre-engineered catalog plans. The bottlenecks are almost never the zoning review — they are side-sewer capacity letters, drainage review on lots with steep slopes, and addressing assignments. We pull a pre-application meeting with Redmond planning before drawings start, which typically saves one full review cycle (4–6 weeks). RCW 36.70A.681 requires most WA jurisdictions to permit ADUs ministerially when zoning is met, which has trimmed median timelines roughly 30% versus 2022.

  • What size DADU can I build on my Redmond lot?

    Under HB 1337 / RCW 36.70A.681, Redmond must allow at least one DADU up to 1,000 sqft on any residential lot zoned for single-family, with height to 24 ft and standard 5 ft side/rear setbacks unless local code is more permissive. Many Redmond zones allow a second ADU (a stacked DADU or AADU + DADU combo). Your ceiling is usually lot coverage, not the 1,000 sqft cap — once you add the primary house footprint plus the new DADU plus impervious driveway and walks, you frequently hit the lot-coverage ratio before the size cap. Our zoning lookup checks both.

  • Do I need to live on the property to build a Redmond ADU?

    No. Owner-occupancy requirements were preempted statewide by RCW 36.70A.681 — Redmond cannot impose an owner-occupancy condition on either the primary or accessory unit. That means you can build a DADU and rent both units, build a DADU for a family member while living off-site, or build to sell. Short-term rentals (≤30 days) are still governed by local STR codes, which vary; long-term rentals (30+ days) face no special restriction beyond standard landlord-tenant law (RCW 59.18).

  • Can I subdivide and sell the ADU separately in Redmond?

    Yes, in most Redmond zones, since the 2023 unit-lot subdivision and condominiumization changes paired with HB 1110 middle-housing reform. The two common pathways are: (1) unit-lot subdivision — carving a new fee-simple lot around the DADU, requires a short plat (~4–6 months) and shared-driveway easements; (2) condominium declaration under RCW 64.34 — faster (~2 months) but lenders sometimes resist financing a 2-unit condo. We model both at feasibility because the right answer depends on your hold-vs-sell horizon and current lender appetite.

  • What is the rental income from a Redmond ADU?

    2026 Redmond ADU rent comps for a 1-bedroom DADU built to current finish standards land in a wide band depending on submarket — generally $1,950–$3,200/mo for a long-term lease, with mid-term (30–90 day) commanding 10–25% premium. Net operating income after vacancy (5%), management (8%), maintenance reserve (5%), and property tax/insurance increment typically hits 62–70% of gross. At today's construction cost and rent comps the unleveraged cap on a new Redmond DADU pencils 4.8–6.4%, with leveraged cash-on-cash 7–11% using a HELOC or renovation loan.

  • Will an ADU raise my Redmond property taxes?

    Yes, but predictably. The county assessor adds the marginal improvement value (typically 55–70% of construction cost, not 100%) to your assessed value, and the levy rate applies to that increment under RCW 84.40.0301. For a $270K-cost DADU in Redmond, expect roughly $1,900–$3,100/yr of additional property tax depending on your levy code area. The increment is partially offset because King and Pierce County both classify newly created ADUs into a single building-permit assessment cycle, not a full reassessment of the primary house.

  • What's the first step to build an ADU in Redmond?

    Start with a paid feasibility study — not a plan set. The feasibility deliverable is a 12–20 page report covering Redmond zoning analysis, setbacks and lot-coverage math, water meter sizing, side-sewer capacity, electrical service amperage, critical-areas screening, three layout options, and a ±15% budget. It costs $1,500 and is credited to the construction contract. This step eliminates the two most expensive surprises — an undersized water service and an unmappable side sewer — before you spend $15K+ on full design. Schedule a free 20-minute scoping call to confirm fit.