Des Moines
ADU Builder.
Design-build DADU, AADU, garage conversion & addition contractor — Des Moines, WA
Des Moines combines waterfront premium rents with South King fee structure. Marina District and Saltwater lots see strong empty-nester demand, and DADUs by right since 2022 make the city one of the friendlier jurisdictions south of Seattle.
RS-9,600 / RS-12,000 — ADU + DADU permitted under DMMC 18.84
We file in Des Moines every month — we know which lot configurations sail through and which need pre-application meetings to avoid corrections.
- ·Marina District
- ·Woodmont
- ·North Hill
- ·Saltwater
- ·Redondo
Building in Des Moines
FIELD_NOTESWhat we lean into
- Waterfront and Sound-view lots command top-tier rents
- DADU permitted by right in RS zones
- Marina District walkability premium
- Highline School District drives stable family rentals
What we plan around
- Shoreline Master Program jurisdictions cover Marina, Saltwater and Redondo
- Bluff and steep-slope overlays cover west-facing lots
- Aircraft noise overlay covers north-end lots near Sea-Tac
- Tree retention: 30% canopy + significant tree protection
Des Moines ADU Permit Checklist
Two-page fillable PDF tuned to Des Moines, WA — owner & site fields, project intent, and the local site conditions we always pre-screen (RS-9,600 / RS-12,000). Fill it on any device, email it back, and we'll set up a free 30-minute feasibility call.
- · Pre-mapped to Des Moines zoning & 10–14 wk permit window
- · Editable on Preview, Acrobat, Chrome — no signup
- · Email back to hello@goldenstateadubuilders.com
What we build in Des Moines
SERVICES_AVAILABLEDETACHED ADU
Stand-alone backyard cottages built from the ground up — engineered for rental income, multi-generational living, or your home office.
02 //ATTACHED ADU
Seamlessly integrated additions — basement, ground-floor, or wing conversions that maintain the architectural integrity of your existing home.
03 //GARAGE CONV.
Convert an under-used garage into a high-end studio, office, or rental quarter without surrendering your driveway.
04 //MODERN ADDITIONS
Structural expansions for growing families — second stories, primary suites, kitchen extensions. Steel, glass, and Pacific Northwest materials.
05 //GENERAL CONTRACTING
Full-service general contracting for remodels, renovations, and ground-up custom homes throughout the Puget Sound region.
06 //FEASIBILITY STUDIES
Before you commit, we analyze zoning, lot coverage, setbacks, utilities, and ROI so you have a real number — not a guess.
Cost to build an ADU in Des Moines
PRICE_GUIDEIndicative turn-key ranges for Des Moines, WA — design, permits, construction and finish carpentry included. Final number depends on lot conditions, finishes and the 10–14 wk Des Moines permit timeline.
“Golden turned a permitting nightmare into a finished, beautiful backyard cottage. They were on schedule every single week, and the fixed-price contract held to the dollar.”
“We interviewed five general contractors. Golden was the only one who walked our lot before quoting. Their structural engineer caught a foundation issue everyone else missed.”
“They converted our garage into a long-term rental that pays our mortgage. Permitted, built, and tenant-ready in 14 weeks — and the finishes look like a custom home.”
Des Moines ADU FAQ
FAQ_0501Can I build a DADU on a Des Moines waterfront lot?
Can I build a DADU on a Des Moines waterfront lot?
Yes outside the Shoreline jurisdiction (≥200 ft from OHWM). Inside it, a Shoreline Substantial Development Permit is needed — adds 3–6 months but is granted on most code-compliant designs.
02Is owner-occupancy required?
Is owner-occupancy required?
No — removed in 2022.
03Will the Sea-Tac aircraft noise overlay limit my Des Moines ADU?
Will the Sea-Tac aircraft noise overlay limit my Des Moines ADU?
On north-end lots inside the Part 150 noise contour, the city requires upgraded sound attenuation (STC 35+ window assemblies, mechanical ventilation, no operable bedroom windows on flight-path elevations). Cost adder is $4–8K. The ADU is still permittable.
04How long does a DADU permit take in Des Moines?
How long does a DADU permit take in Des Moines?
Typical Des Moines permit cycle is 10–14 weeks for a clean lot, 14–20 weeks if Shoreline Master Program review or steep-slope geotech is required. We pre-screen overlays during feasibility.
05Do Des Moines DADU rents really cover the build cost?
Do Des Moines DADU rents really cover the build cost?
Marina District and Saltwater-view lots routinely rent at $2,200–$2,800/mo for an 800 sqft DADU — inside-overlay returns are 15–20% above the South King average. We model rent yield against your specific lot in feasibility.
Build in Des Moines.
Free site walk.
REQUEST CONSULTATIONNearby cities we build in
Des Moines datasets
All Golden State services in Des Moines
Stand-alone backyard cottages built from the ground up — engineered for rental income, multi-generational living, or your home office.
Seamlessly integrated additions — basement, ground-floor, or wing conversions that maintain the architectural integrity of your existing home.
Convert an under-used garage into a high-end studio, office, or rental quarter without surrendering your driveway.
Structural expansions for growing families — second stories, primary suites, kitchen extensions. Steel, glass, and Pacific Northwest materials.
Full-service general contracting for remodels, renovations, and ground-up custom homes throughout the Puget Sound region.
Before you commit, we analyze zoning, lot coverage, setbacks, utilities, and ROI so you have a real number — not a guess.
Frequently asked
How much does an ADU cost in Des Moines, WA in 2026?
Turn-key ADUs in Des Moines run roughly $295–$465 per square foot all-in for 2026 contracts, depending on lot access, foundation type, and finish package. A 600 sqft one-bedroom DADU typically closes between $215K and $310K including permits, side-sewer connection, and electrical service work. The biggest swing factors in Des Moines are soils (pier-and-beam adds $18–32K over a slab), required stormwater detention on lots over 2,000 sqft of impervious, and whether a panel upgrade to 200A is needed. Our Des Moines feasibility report gives you a ±15% number in two weeks for $1,500, credited to the build contract.
How long does the ADU permit take in Des Moines?
Median Des Moines ADU permit issuance is currently 8–16 weeks from a clean submittal in 2026, faster on pre-engineered catalog plans. The bottlenecks are almost never the zoning review — they are side-sewer capacity letters, drainage review on lots with steep slopes, and addressing assignments. We pull a pre-application meeting with Des Moines planning before drawings start, which typically saves one full review cycle (4–6 weeks). RCW 36.70A.681 requires most WA jurisdictions to permit ADUs ministerially when zoning is met, which has trimmed median timelines roughly 30% versus 2022.
What size DADU can I build on my Des Moines lot?
Under HB 1337 / RCW 36.70A.681, Des Moines must allow at least one DADU up to 1,000 sqft on any residential lot zoned for single-family, with height to 24 ft and standard 5 ft side/rear setbacks unless local code is more permissive. Many Des Moines zones allow a second ADU (a stacked DADU or AADU + DADU combo). Your ceiling is usually lot coverage, not the 1,000 sqft cap — once you add the primary house footprint plus the new DADU plus impervious driveway and walks, you frequently hit the lot-coverage ratio before the size cap. Our zoning lookup checks both.
Do I need to live on the property to build a Des Moines ADU?
No. Owner-occupancy requirements were preempted statewide by RCW 36.70A.681 — Des Moines cannot impose an owner-occupancy condition on either the primary or accessory unit. That means you can build a DADU and rent both units, build a DADU for a family member while living off-site, or build to sell. Short-term rentals (≤30 days) are still governed by local STR codes, which vary; long-term rentals (30+ days) face no special restriction beyond standard landlord-tenant law (RCW 59.18).
Can I subdivide and sell the ADU separately in Des Moines?
Yes, in most Des Moines zones, since the 2023 unit-lot subdivision and condominiumization changes paired with HB 1110 middle-housing reform. The two common pathways are: (1) unit-lot subdivision — carving a new fee-simple lot around the DADU, requires a short plat (~4–6 months) and shared-driveway easements; (2) condominium declaration under RCW 64.34 — faster (~2 months) but lenders sometimes resist financing a 2-unit condo. We model both at feasibility because the right answer depends on your hold-vs-sell horizon and current lender appetite.
What is the rental income from a Des Moines ADU?
2026 Des Moines ADU rent comps for a 1-bedroom DADU built to current finish standards land in a wide band depending on submarket — generally $1,950–$3,200/mo for a long-term lease, with mid-term (30–90 day) commanding 10–25% premium. Net operating income after vacancy (5%), management (8%), maintenance reserve (5%), and property tax/insurance increment typically hits 62–70% of gross. At today's construction cost and rent comps the unleveraged cap on a new Des Moines DADU pencils 4.8–6.4%, with leveraged cash-on-cash 7–11% using a HELOC or renovation loan.
Will an ADU raise my Des Moines property taxes?
Yes, but predictably. The county assessor adds the marginal improvement value (typically 55–70% of construction cost, not 100%) to your assessed value, and the levy rate applies to that increment under RCW 84.40.0301. For a $270K-cost DADU in Des Moines, expect roughly $1,900–$3,100/yr of additional property tax depending on your levy code area. The increment is partially offset because King and Pierce County both classify newly created ADUs into a single building-permit assessment cycle, not a full reassessment of the primary house.
What's the first step to build an ADU in Des Moines?
Start with a paid feasibility study — not a plan set. The feasibility deliverable is a 12–20 page report covering Des Moines zoning analysis, setbacks and lot-coverage math, water meter sizing, side-sewer capacity, electrical service amperage, critical-areas screening, three layout options, and a ±15% budget. It costs $1,500 and is credited to the construction contract. This step eliminates the two most expensive surprises — an undersized water service and an unmappable side sewer — before you spend $15K+ on full design. Schedule a free 20-minute scoping call to confirm fit.