
Bellevue Wing
Side-yard expansion of a craftsman home — independent entry, full kitchen, separate utilities.
Read case study →- City
- Bellevue, WA
- SQ FT
- 720
- Done
- Aug 2023
Design-build DADU, AADU, garage conversion & addition contractor — Bellevue, WA
Bellevue's ADU code requires a Special Use Permit for detached units, plus design review on through-lots. We've shepherded projects through every district from Wilburton to Somerset and know which lot configurations sail through and which need pre-application meetings.
We file in Bellevue every month — we know which lot configurations sail through and which need pre-application meetings to avoid corrections.
Two-page fillable PDF tuned to Bellevue, WA — owner & site fields, project intent, and the local site conditions we always pre-screen (R-1 through R-5). Fill it on any device, email it back, and we'll set up a free 30-minute feasibility call.
Stand-alone backyard cottages built from the ground up — engineered for rental income, multi-generational living, or your home office.
02 //Seamlessly integrated additions — basement, ground-floor, or wing conversions that maintain the architectural integrity of your existing home.
03 //Convert an under-used garage into a high-end studio, office, or rental quarter without surrendering your driveway.
04 //Structural expansions for growing families — second stories, primary suites, kitchen extensions. Steel, glass, and Pacific Northwest materials.
05 //Full-service general contracting for remodels, renovations, and ground-up custom homes throughout the Puget Sound region.
06 //Before you commit, we analyze zoning, lot coverage, setbacks, utilities, and ROI so you have a real number — not a guess.
Indicative turn-key ranges for Bellevue, WA — design, permits, construction and finish carpentry included. Final number depends on lot conditions, finishes and the 10–14 wk Bellevue permit timeline.

Side-yard expansion of a craftsman home — independent entry, full kitchen, separate utilities.
Read case study →“Golden turned a permitting nightmare into a finished, beautiful backyard cottage. They were on schedule every single week, and the fixed-price contract held to the dollar.”
“We interviewed five general contractors. Golden was the only one who walked our lot before quoting. Their structural engineer caught a foundation issue everyone else missed.”
“They converted our garage into a long-term rental that pays our mortgage. Permitted, built, and tenant-ready in 14 weeks — and the finishes look like a custom home.”
Bellevue treats detached ADUs as a conditional use in most R-zones. The SUP adds a 30-day public notice and director's decision, but is granted on virtually every code-compliant application. We file the SUP and building permit concurrently to save calendar time.
Detached ADUs are capped at 1,000 sqft gross floor area or 50% of the primary residence, whichever is less. Attached ADUs follow the underlying lot's FAR — typically 1,200 sqft realistically buildable.
Yes. The owner must occupy either the primary residence or the ADU. If you plan to move out, the ADU permit converts to nonconforming and the unit cannot be rented separately.
Lots with significant trees (≥6" DBH) must retain 30% canopy or fee-in-lieu. We model the tree envelope before siting the ADU footprint to avoid late-stage redesigns.
Only on arterials and collectors flagged in the Transportation Facilities Plan. Most R-1 through R-5 interior streets are exempt; we confirm during the feasibility walk.
Stand-alone backyard cottages built from the ground up — engineered for rental income, multi-generational living, or your home office.
Seamlessly integrated additions — basement, ground-floor, or wing conversions that maintain the architectural integrity of your existing home.
Convert an under-used garage into a high-end studio, office, or rental quarter without surrendering your driveway.
Structural expansions for growing families — second stories, primary suites, kitchen extensions. Steel, glass, and Pacific Northwest materials.
Full-service general contracting for remodels, renovations, and ground-up custom homes throughout the Puget Sound region.
Before you commit, we analyze zoning, lot coverage, setbacks, utilities, and ROI so you have a real number — not a guess.
CITY_INTEL / Bellevue · Verified 2026-01-15
Bellevue has aligned with HB 1337 to allow two ADUs per lot, removed owner-occupancy, and dropped parking minimums for ADUs near transit. The friction is on the site side — large mature trees, plateau / slope geotech, and Puget Sound Energy coordination drive timeline more than plan review does.
Zoning
Bellevue allows detached ADU (DADU) on single-family lots (up to 1,000 sf), no owner-occupancy requirement, and no off-street parking required near transit.
Permit lead-time
10–30 weeks
Includes one typical correction cycle.
DADU cost range
$302k–$562k · typical $410k
Cost tier 5/5 · excludes land.
Typical end-to-end
~60 weeks
Feasibility → final sign-off, typical scenario.
What slows ADUs here
Feasibility blockers to map early
Official sources used to build this profile
Turn-key ADUs in Bellevue run $300–$400 per square foot all-in for 2026 contracts. A 600 sqft one-bedroom DADU typically closes between $180K and $240K including permits, side-sewer connection, and electrical service work. Cost swing factors in Bellevue: soils (pier-and-beam adds $18–32K over a slab), required stormwater detention on lots over 2,000 sqft of impervious, and whether a panel upgrade to 200A is needed. Our Bellevue feasibility report gives you a ±15% number in two weeks for $1,500, credited to the build contract.
Go deeper: Read the Eastside deck cost & permits: cedar, IPE, composite (2026) guide
Median Bellevue ADU permit issuance is currently 8–16 weeks from a clean submittal in 2026, faster on pre-engineered catalog plans. The bottlenecks are almost never zoning — they are side-sewer capacity letters, drainage review on lots with steep slopes, and addressing. We pull a pre-application meeting with Bellevue planning before drawings start, which typically saves one full review cycle (4–6 weeks). RCW 36.70A.681 requires WA jurisdictions to permit ADUs ministerially when zoning is met, which has trimmed median timelines roughly 30% versus 2022.
Under HB 1337 / RCW 36.70A.681, Bellevue must allow at least one DADU up to 1,000 sqft on any residential lot zoned for single-family, with height to 24 ft and standard 5 ft side/rear setbacks unless local code is more permissive. Many Bellevue zones allow a second ADU (stacked DADU or AADU + DADU). Your ceiling is usually lot coverage, not the 1,000 sqft cap — primary footprint + DADU + impervious drive often hits the coverage ratio first. Our zoning lookup checks both.
No. Owner-occupancy requirements were preempted statewide by RCW 36.70A.681 — Bellevue cannot impose an owner-occupancy condition on either unit. You can build a DADU and rent both units, build for a family member while living off-site, or build to sell. Short-term rentals (≤30 days) are still governed by local STR codes; long-term rentals (30+ days) face no special restriction beyond standard landlord-tenant law (RCW 59.18).
Yes, in most Bellevue zones, since the 2023 unit-lot subdivision and condominiumization changes paired with HB 1110. Two pathways: (1) unit-lot subdivision — carving a fee-simple lot around the DADU, requires a short plat (~4–6 months) and shared-driveway easements; (2) condominium declaration under RCW 64.34 — faster (~2 months) but lenders sometimes resist a 2-unit condo. We model both at feasibility because the right answer depends on hold-vs-sell horizon and current lender appetite.
2026 Bellevue comps for a 1-bedroom DADU built to current finish standards land $1,950–$3,200/mo long-term, with mid-term (30–90 day) 10–25% higher. Net operating income after vacancy (5%), management (8%), maintenance reserve (5%), and property tax/insurance increment typically hits 62–70% of gross. At today's construction cost and rent comps the unleveraged cap on a new Bellevue DADU pencils 4.8–6.4%, with leveraged cash-on-cash 7–11% using a HELOC or renovation loan.
Yes, but predictably. The county assessor adds the marginal improvement value (typically 55–70% of construction cost, not 100%) to your assessed value, and the levy rate applies to that increment under RCW 84.40.0301. For a $210K-cost DADU in Bellevue, expect roughly $1,900–$3,100/yr of additional property tax depending on your levy code area. The primary residence assessment is not reopened — only the new improvement is added.
Start with a paid feasibility study — not a plan set. The 12–20 page report covers Bellevue zoning analysis, setbacks and lot-coverage math, water meter sizing, side-sewer capacity, electrical service amperage, critical-areas screening, three layout options, and a ±15% budget. $1,500, credited to the build contract. This step eliminates the two most expensive surprises — undersized water service and an unmappable side sewer — before you spend $15K+ on full design.
Yes when ceiling height, light/ventilation, and emergency egress meet IRC R310. Bellevue basements that fall short on ceiling (need 7'-0" min, 6'-8" at beams) or egress window opening (5.7 sqft net clear, 24" high, 20" wide, sill ≤44" AFF) typically need underpinning or window-well excavation. Cost band on a clean Bellevue basement conversion is $145–$220K including new full bath, kitchenette, separate exterior entry, fire separation, and dedicated panel feeder.
Five common Bellevue structures: (1) HELOC against the primary, fastest, 8.0–9.5% APR, no separate appraisal; (2) renovation loan (Fannie HomeStyle / Freddie CHOICERenovation), single-close, uses after-built value, 7.1–7.9%; (3) cash-out refi, only if existing mortgage is above market; (4) construction-to-perm, best for ground-up DADUs with 12-month draw; (5) WSHFC ADU pilot at ~3.5–4.25% for owner-occupants ≤120% AMI. We coordinate with five Bellevue-area credit unions and three banks with ADU-experienced underwriters.
Usually no. Per IRC R313 and WA state amendments, single-family dwellings and ADUs under 5,000 sqft of fire-flow calculation area generally do not require residential sprinklers in Bellevue. Triggers that flip the answer: total combined floor area of primary + ADU exceeding 5,000 sqft, structures over three stories above grade, lots beyond fire-flow distance, or specific local fire-marshal interpretations on shared-wall AADU configurations. Verified at feasibility against the Bellevue fire marshal's current rule sheet.
Sometimes. WA preemption under RCW 36.70A.681 forces Bellevue to allow ADUs but does not preempt short-term-rental ordinances. Some Puget Sound jurisdictions require owner-occupancy on at least one unit for STR, cap STR nights per year, or require a separate STR permit and lodging-tax registration with WA DOR. Long-term (30+ day) rentals always work. Check our Bellevue-specific STR rules before underwriting any STR-dependent pro forma.
Standard Bellevue ADU permit stack: building permit (covers structural, mechanical, plumbing under combined review), side-sewer permit (separate, issued by Bellevue utilities), water meter capacity check (may trigger upsize fee), electrical permit (issued by L&I in most Bellevue unincorporated areas, by the city in Bellevue proper), and where applicable: drainage review, addressing, demolition, right-of-way for utility cut. We pull all permits on your behalf and itemize fees as a pass-through, not a markup.
Most Bellevue zones now allow 24 ft to midpoint of roof for DADUs under HB 1337, with some pre-existing zones permitting up to 30 ft on larger lots. Height is measured from existing grade or ABE (Average Building Elevation), and roof overhangs typically don't count. Two-story DADUs at 22–24 ft midpoint generally fit single-family neighborhoods without bulk objections, while clearing the head-height needed for a code stair and 8 ft upper-floor ceilings.
Go deeper: Read the Eastside deck cost & permits: cedar, IPE, composite (2026) guide
No new parking is required under RCW 36.70A.681 for ADUs within ½ mile of a major transit stop or in lots ≤4,000 sqft, and Bellevue's implementing code largely preserves that exemption citywide. For lots outside that band, Bellevue may require one off-street stall per ADU. Tandem parking on the existing driveway typically qualifies, which means most Bellevue lots add a DADU without adding new pavement.
Sometimes. RCW 64.38.034 (effective 2024) prohibits Bellevue HOAs from banning ADUs outright on lots zoned for single-family, but HOAs may impose design covenants — siding material, roof pitch, façade articulation. We've built in Bellevue HOAs by submitting design concepts to the architectural review board in parallel with permit submittal, which keeps the schedule intact. Add 4–8 weeks for ARB review on top of city permit time.
Garage conversion on an existing slab, kitchen on the existing plumbing wall, no electrical service upgrade, no critical-areas review. Real-world floor for a clean Bellevue conversion is $185–$235K in 2026 dollars. Below that price point you are usually looking at an unpermitted job that will not refinance, insure, or transfer at sale. The price assumes IRC R310 egress is achievable without major exterior wall surgery.
Triggered when new + replaced impervious surface exceeds the Bellevue threshold (commonly 2,000 sqft in King County / 5,000 sqft of land disturbance). Most 600 sqft DADUs with a permeable walkway stay under. Lots over the threshold need a drainage report by a WA-licensed civil engineer and may need detention — vault or rain garden — adding $8–22K. Site planning around impervious is the cheapest fix; we model it during feasibility.
Yes — every new ADU in Bellevue is permitted to the current 2021 WSEC residential energy code (IECC R406 path 1, 2, or 3 with WA amendments). Typical compliance package: R-21 walls (R-23 effective with continuous), R-49 attic, U-0.28 windows, sealed combustion or heat-pump HVAC, ERV/HRV for IAQ, and blower-door test ≤3 ACH50. The energy package adds roughly $8–14K versus 2018 code; required regardless of finish tier.
Often yes. HB 1337 requires Bellevue to allow two ADUs on lots zoned for single-family in jurisdictions over 25,000 population, configured as DADU + AADU, two AADUs, or a stacked two-unit DADU. Some Bellevue zones restrict to one ADU + JADU. Combined floor area cap is typically 2,000 sqft for both ADUs combined. We map your specific zone's ADU count at feasibility — answer depends on the parcel's zone designation, not citywide rules.
A DADU (detached) is a freestanding structure separated from the primary house by at least 5 ft. An AADU (attached) shares at least one wall with the primary, typically as an addition or interior conversion with a separate entrance. Bellevue treats both under the same RCW 36.70A.681 preemption — same size cap (up to 1,000 sqft), same setback relief, same parking exemption. Cost differs: DADUs cost ~12–18% more per sqft because they need a complete envelope; AADUs share existing walls and roof.
Recommended in nearly every case. Bellevue reviewers require precise setback measurements from property lines, not from the curb or fence. A recent boundary survey (BLA-compliant, sealed by a WA-licensed surveyor) costs $1,200–$2,800 and locks the setback math. The exception: lots with a recent (≤5 year) recorded survey that has not been disturbed by fence or grading work. We include survey coordination in feasibility deliverables.
Three utility paths in Bellevue: (1) water — extend from the existing meter if size supports flow demand; otherwise upsize meter ($3,500–$11,000 capacity fee); (2) sewer — separate side-sewer tap from main, or shared connection with cleanout, requires Bellevue utilities permit ($1,800–$4,400); (3) electrical — sub-feeder from primary panel if capacity allows, otherwise 200A service upgrade ($4,800–$9,200). Gas is optional and depends on cooktop/water-heater choice. We submit all utility paperwork in parallel with the building permit.
When wall-to-wall separation is less than 5 ft, IRC R302 requires 1-hour fire-rated assemblies on both exterior walls facing each other (5/8" Type X gypsum, no openings), and at separation less than 3 ft a 1-hour fire-rated assembly with sprinklers may be required by Bellevue fire marshal. Detached DADUs at 5 ft+ separation typically need no special fire rating — standard envelope assemblies satisfy code.
Yes via condominium declaration under RCW 64.34, typically faster than unit-lot subdivision (~2 months vs 4–6) but with lender constraints — many residential lenders require a minimum 3-unit condo for conventional financing, so a 2-unit condo can limit buyer pool. Portfolio lenders and non-QM lenders work with 2-unit condos. We refer clients to a WA real-estate attorney to draft the declaration and CC&Rs; budget $4,800–$8,500 for legal.
INTERNAL_LINKS / Deep Map
A live dossier from our field PMs: the permit counter, the soils, the bylaw that just changed, and the streets where ADUs are already cash-flowing.
We track lunar weeks for slab pours — clear nights drop ambient temperature faster, which slows surface curing. Schedule wet slabs midweek under waxing light.
Loading. Our standard crew window is 7:00–17:00 weekdays — noise ordinances in most Puget Sound cities allow exterior power tools only inside that band.
Sunday exterior work is restricted in most Puget Sound jurisdictions. We sequence interior trades around it.
Calculating live drive times to four metro anchors…
Real commute time matters for ADU rent comps — and for our crews. We keep installs within a 60-minute radius of our Puget Sound yard.
Data provenance
Drive times pulled live from the Google Routes API (traffic-aware matrix). Each request is timestamped so you can see exactly when the numbers were last refreshed — no stale brochure data.
Lot context matters as much as zoning. We pre-screen access, slope, and tree canopy from imagery before scheduling the site visit.
Waterfront lots: shoreline excavation and barge access windows depend on these. We schedule pours away from extreme low tides when the soils dry unevenly.
Open-data signal of nearby construction velocity — useful for ADU comps and for anticipating examiner workload.
“R-1 through R-7.5 all allow one DADU up to 1,200 sq ft — but lot coverage caps trigger first on small Bridle Trails parcels.”
Bar shows pour-friendly months · dot marks the current month.
Station-area lots earn the largest rent premium in this market.
Rental yield estimate: $2,900–3,800 / mo for an 800–1,000 sq ft DADU
Pre-approved DADU plan track waives initial design review fees
“Bridle Trails DADUs near the state park rent ~22% above city median.”
“Their PM walked our slope with the geotech on day one — no surprise piles later.”
Bellevue is one of our top markets. We'll send a Bellevue-specific feasibility brief (zoning, fees, soils, timeline) for your address within 48h.
◆ Bellevue owners are 1 of every 3 ADUs we delivered in 2026.
◇ No sales script · No spam · Your details stay with our team