Skip to main content
Bellevue skyline at golden hour
REGION / BELLEVUE, WA

Bellevue
ADU Builder.

Design-build DADU, AADU, garage conversion & addition contractor — Bellevue, WA

Bellevue's ADU code requires a Special Use Permit for detached units, plus design review on through-lots. We've shepherded projects through every district from Wilburton to Somerset and know which lot configurations sail through and which need pre-application meetings.

10–14 wk
Permit Timeline
10,000 sqft (varies)
Lot Minimum
8+
Neighborhoods
12 yrs
Local Experience
ZONING / LOCAL CODE

R-1 through R-5 — ADU + ADU SUP permitted under LUC 20.30G

We file in Bellevue every month — we know which lot configurations sail through and which need pre-application meetings to avoid corrections.

NEIGHBORHOODS WE SERVE
  • ·Downtown
  • ·Bridle Trails
  • ·Crossroads
  • ·Eastgate
  • ·Newport
  • ·Somerset
  • ·West Bellevue
  • ·Wilburton

Building in Bellevue

FIELD_NOTES
WHY_HERE

What we lean into

  • Higher land values mean ADU rents in the top quartile of Puget Sound
  • Bellevue staff prefer pre-application meetings — when scheduled early they cut review cycles in half
  • Eastgate and Crossroads see strong corporate-relocation tenant demand
  • Modern luxury finishes pay back faster here than in any other Eastside city
WATCH_OUT

What we plan around

  • ADU SUP (Special Use Permit) required for all detached units — adds a public-notice step
  • Critical Areas overlay covers most of Somerset, Newport and Cougar Mountain edges
  • Tree retention thresholds: 30% canopy retention triggers replanting plans
  • Through-lot and corner lot designs require Design Review Board approval
CHECKLIST_01 / BELLEVUE_FEASIBILITY

Bellevue ADU Permit Checklist

Two-page fillable PDF tuned to Bellevue, WA — owner & site fields, project intent, and the local site conditions we always pre-screen (R-1 through R-5). Fill it on any device, email it back, and we'll set up a free 30-minute feasibility call.

  • · Pre-mapped to Bellevue zoning & 10–14 wk permit window
  • · Editable on Preview, Acrobat, Chrome — no signup
  • · Email back to hello@goldenstateadubuilders.com
FILE / bellevue-adu-permit-checklist.pdf
Email completed PDF →

Or call (206) 555-0192

Cost to build an ADU in Bellevue

PRICE_GUIDE

Indicative turn-key ranges for Bellevue, WA — design, permits, construction and finish carpentry included. Final number depends on lot conditions, finishes and the 10–14 wk Bellevue permit timeline.

DADU
$325K – $525K

6–8 months · 400–1,000 sqft

DETACHED ADU in Bellevue
AADU
$185K – $345K

4–5 months · 300–800 sqft

ATTACHED ADU in Bellevue
Garage
$145K – $235K

3–4 months · 200–600 sqft

GARAGE CONV. in Bellevue
Additions
$220K – $750K+

Project dependent · Custom

MODERN ADDITIONS in Bellevue

Recent in Bellevue

ALL PROJECTS →
Bellevue Wing — Attached ADU in Bellevue, WA
REF_4376 · Attached ADU

Bellevue Wing

Side-yard expansion of a craftsman home — independent entry, full kitchen, separate utilities.

Read case study →
City
Bellevue, WA
SQ FT
720
Done
Aug 2023
CLIENT_REPORT
Golden turned a permitting nightmare into a finished, beautiful backyard cottage. They were on schedule every single week, and the fixed-price contract held to the dollar.
Marcus Henderson
Homeowner · Ballard, Seattle · 2023
REF_4492
We interviewed five general contractors. Golden was the only one who walked our lot before quoting. Their structural engineer caught a foundation issue everyone else missed.
Sade Okafor
Owner-Architect · Bellevue · 2023
REF_4376
They converted our garage into a long-term rental that pays our mortgage. Permitted, built, and tenant-ready in 14 weeks — and the finishes look like a custom home.
Jin & Lauren Park
Investor Homeowners · Kirkland · 2024
REF_4218

Bellevue ADU FAQ

FAQ_05
01

Why does Bellevue require a Special Use Permit for a DADU?

Bellevue treats detached ADUs as a conditional use in most R-zones. The SUP adds a 30-day public notice and director's decision, but is granted on virtually every code-compliant application. We file the SUP and building permit concurrently to save calendar time.

02

What's the maximum size ADU I can build in Bellevue?

Detached ADUs are capped at 1,000 sqft gross floor area or 50% of the primary residence, whichever is less. Attached ADUs follow the underlying lot's FAR — typically 1,200 sqft realistically buildable.

03

Does Bellevue still require owner-occupancy?

Yes. The owner must occupy either the primary residence or the ADU. If you plan to move out, the ADU permit converts to nonconforming and the unit cannot be rented separately.

04

How does Bellevue's tree code affect my ADU plans?

Lots with significant trees (≥6" DBH) must retain 30% canopy or fee-in-lieu. We model the tree envelope before siting the ADU footprint to avoid late-stage redesigns.

05

Will an ADU trigger a sidewalk requirement on my street?

Only on arterials and collectors flagged in the Transportation Facilities Plan. Most R-1 through R-5 interior streets are exempt; we confirm during the feasibility walk.

Build in Bellevue.
Free site walk.

REQUEST CONSULTATION
FAQ

Frequently asked

  • How much does an ADU cost in Bellevue, WA in 2026?

    Turn-key ADUs in Bellevue run roughly $295–$465 per square foot all-in for 2026 contracts, depending on lot access, foundation type, and finish package. A 600 sqft one-bedroom DADU typically closes between $215K and $310K including permits, side-sewer connection, and electrical service work. The biggest swing factors in Bellevue are soils (pier-and-beam adds $18–32K over a slab), required stormwater detention on lots over 2,000 sqft of impervious, and whether a panel upgrade to 200A is needed. Our Bellevue feasibility report gives you a ±15% number in two weeks for $1,500, credited to the build contract.

  • How long does the ADU permit take in Bellevue?

    Median Bellevue ADU permit issuance is currently 8–16 weeks from a clean submittal in 2026, faster on pre-engineered catalog plans. The bottlenecks are almost never the zoning review — they are side-sewer capacity letters, drainage review on lots with steep slopes, and addressing assignments. We pull a pre-application meeting with Bellevue planning before drawings start, which typically saves one full review cycle (4–6 weeks). RCW 36.70A.681 requires most WA jurisdictions to permit ADUs ministerially when zoning is met, which has trimmed median timelines roughly 30% versus 2022.

  • What size DADU can I build on my Bellevue lot?

    Under HB 1337 / RCW 36.70A.681, Bellevue must allow at least one DADU up to 1,000 sqft on any residential lot zoned for single-family, with height to 24 ft and standard 5 ft side/rear setbacks unless local code is more permissive. Many Bellevue zones allow a second ADU (a stacked DADU or AADU + DADU combo). Your ceiling is usually lot coverage, not the 1,000 sqft cap — once you add the primary house footprint plus the new DADU plus impervious driveway and walks, you frequently hit the lot-coverage ratio before the size cap. Our zoning lookup checks both.

  • Do I need to live on the property to build a Bellevue ADU?

    No. Owner-occupancy requirements were preempted statewide by RCW 36.70A.681 — Bellevue cannot impose an owner-occupancy condition on either the primary or accessory unit. That means you can build a DADU and rent both units, build a DADU for a family member while living off-site, or build to sell. Short-term rentals (≤30 days) are still governed by local STR codes, which vary; long-term rentals (30+ days) face no special restriction beyond standard landlord-tenant law (RCW 59.18).

  • Can I subdivide and sell the ADU separately in Bellevue?

    Yes, in most Bellevue zones, since the 2023 unit-lot subdivision and condominiumization changes paired with HB 1110 middle-housing reform. The two common pathways are: (1) unit-lot subdivision — carving a new fee-simple lot around the DADU, requires a short plat (~4–6 months) and shared-driveway easements; (2) condominium declaration under RCW 64.34 — faster (~2 months) but lenders sometimes resist financing a 2-unit condo. We model both at feasibility because the right answer depends on your hold-vs-sell horizon and current lender appetite.

  • What is the rental income from a Bellevue ADU?

    2026 Bellevue ADU rent comps for a 1-bedroom DADU built to current finish standards land in a wide band depending on submarket — generally $1,950–$3,200/mo for a long-term lease, with mid-term (30–90 day) commanding 10–25% premium. Net operating income after vacancy (5%), management (8%), maintenance reserve (5%), and property tax/insurance increment typically hits 62–70% of gross. At today's construction cost and rent comps the unleveraged cap on a new Bellevue DADU pencils 4.8–6.4%, with leveraged cash-on-cash 7–11% using a HELOC or renovation loan.

  • Will an ADU raise my Bellevue property taxes?

    Yes, but predictably. The county assessor adds the marginal improvement value (typically 55–70% of construction cost, not 100%) to your assessed value, and the levy rate applies to that increment under RCW 84.40.0301. For a $270K-cost DADU in Bellevue, expect roughly $1,900–$3,100/yr of additional property tax depending on your levy code area. The increment is partially offset because King and Pierce County both classify newly created ADUs into a single building-permit assessment cycle, not a full reassessment of the primary house.

  • What's the first step to build an ADU in Bellevue?

    Start with a paid feasibility study — not a plan set. The feasibility deliverable is a 12–20 page report covering Bellevue zoning analysis, setbacks and lot-coverage math, water meter sizing, side-sewer capacity, electrical service amperage, critical-areas screening, three layout options, and a ±15% budget. It costs $1,500 and is credited to the construction contract. This step eliminates the two most expensive surprises — an undersized water service and an unmappable side sewer — before you spend $15K+ on full design. Schedule a free 20-minute scoping call to confirm fit.