REF_4376 · Attached ADU · Bellevue, WA

Bellevue Wing

A 720 sqft side-yard AADU grafted onto a 1962 craftsman in West Bellevue — independent entry, separate utilities, no shared interior wall openings.

Type
Attached ADU
Sqft
720
Beds / Baths
1 / 1
Completed
Aug 2023
Duration
28 wks
Budget
$258,000
Bellevue Wing — Attached ADU in Bellevue, WA

01 / BRIEF

What the owner asked for

A multi-generational family wanted a fully independent unit for an aging parent without the privacy compromises of a basement conversion. Bellevue Land Use Code 20.30.130 was rewritten in 2023 to allow AADUs by-right with a separate front door, so we proposed a single-story east-side addition that ties into the existing roofline at the gable.

02 / CHALLENGE

What stood in the way

The existing 100A service was already at 86% of nameplate during the December peak — a load calc per NEC 220.83 showed no headroom for an electric range, heat pump, and EV charger. Bellevue also requires 20-foot side-yard separation from the neighbor's eave for any habitable window.

03 / APPROACH

How we solved it

We upgraded the main panel to 200A and ran a sub-fed 100A panel into the AADU on a separate meter base (PSE Service Order #SO-22-44109). All east-facing AADU windows were placed in the corridor wall and clerestoried above 6'-8" to avoid line-of-sight to the neighbor. A 24" cricket on the existing roof shed water away from the new flat-roof transition.

04 / OUTCOME

What got delivered

Built in 19 weeks of construction after a 9-week Bellevue permit review. The parent moved in three weeks before Thanksgiving 2023. Property reassessment came in $187K above the build cost, and the family refinanced the entire mortgage at the same rate held since 2021.

SPEC_05 / FACTS

Project specification

Footprint
720 sqft single-story
Bedrooms / baths
1 / 1
Ceiling height
9'-0"
Energy code path
Prescriptive (R-21 / R-49)
Side-yard setback
10'-0" (code minimum 5')
Parking
1 existing on-site

SCHEDULE_06 / PHASES

28-week delivery

  1. 01
    Feasibility & design
    4–6 wks

    Site survey, zoning memo, schematic plans, owner review.

  2. 02
    Construction docs
    3–4 wks

    Structural, MEP, energy compliance, permit-ready set.

  3. 03
    Permit review
    9 wks

    City corrections, utility sign-offs, building permit issued.

  4. 04
    Site work + foundation
    3–4 wks

    Erosion control, excavation, footings, slab or stem wall.

  5. 05
    Framing + dry-in
    5–6 wks

    Floor, walls, roof, windows, weather-resistive barrier.

  6. 06
    MEP rough-in + insulation
    4–5 wks

    Plumbing, electrical, HVAC, blower-door prep.

  7. 07
    Finish + cabinetry
    6–8 wks

    Drywall, paint, flooring, cabinets, tile, fixtures.

  8. 08
    Inspections + handover
    1–2 wks

    Final inspections, punch-list, 19-week build closeout.

MATERIAL_07

Materials

  • Cladding
    Hardie Artisan V-rustic, 7" exposure, ben-moore Kendall Charcoal
  • Roofing
    CertainTeed Landmark Pro, Charcoal Black
  • Windows
    Milgard Tuscany V400, vinyl, U-0.30
  • Entry door
    Therma-Tru S3550 fiberglass, full-lite frosted

SYSTEM_08

Systems

  • Heating / cooling
    Daikin RXL15QMVJU 15K BTU single-zone
  • Water heating
    Rinnai RU199iN gas tankless (shared with main)
  • Electrical
    200A main + 100A AADU sub-panel, separate meter

PERMIT_09 / RECORD

Permits & compliance

  • Permit number
    Bellevue BLD-22-00731-RNCR
  • Utility coordination
    PSE SO-22-44109 (electrical), Bellevue Utilities #BU-22-1198
  • Land-use review
    Administrative AADU permit (no DR required)

METRIC_10 / OUTCOME

By the numbers

$8,440
Final permit fee
+$187,000
Reassessment delta
2.6
Blower door (ACH50)
0
Days over schedule

LESSON_11 / FIELD NOTES

What we'd repeat

  • Pulling the load calc before schematic design pre-empted a 4-week panel-upgrade scramble at rough-in.
  • Bellevue's 2023 AADU code allows interior connecting doors between primary and AADU as long as they're not the only AADU egress — useful for aging-in-place layouts.
FAQ

Frequently asked

  • Can I tour a project like "Bellevue Wing"?

    Yes — we typically have 6–10 ADUs in framing or finish at any time across the Puget Sound, so we can usually arrange a site walk on a project at the same stage you're planning. For completed projects, tours depend on the current owner's availability and privacy preferences. Request a tour and we'll match you to the closest active or completed project that resembles "Bellevue Wing" in size, configuration, and AHJ.

    Go deeper: Read the Eastside deck cost & permits: cedar, IPE, composite (2026) guide

  • What did this project actually cost?

    Each project page includes the all-in cost range for the size and configuration shown, scaled to 2026 prices. Actual contract value at time of build is confidential to the client, but the range we publish is anchored in real numbers from our bid archive — not aspirational pricing. For a tailored estimate against your lot, run our feasibility study or use the cost calculator.

    Go deeper: Read the Five hidden ADU costs that wreck Puget Sound budgets guide

  • How long did this project take?

    Most projects of this size and configuration run 9–14 months from contract to certificate of occupancy: 6–8 weeks of design, 8–16 weeks of permit, 18–26 weeks of construction. Schedule variance is driven by AHJ workload, owner selection pace, and field-discovered conditions during demo or excavation. We publish a Gantt at contract and update it weekly.

    Go deeper: Read the Eastside deck cost & permits: cedar, IPE, composite (2026) guide

  • Could you build "Bellevue Wing" again on my lot?

    Often yes — most of our projects are anchored on repeatable design DNA (envelope details, structural assemblies, MEP standard layouts) that adapt to different lot conditions with modest configuration changes. We'll review your lot's zoning, soils, and access to confirm fit. Where the original layout doesn't fit, we propose the closest workable adaptation that preserves the look you liked.

    Go deeper: Read the Eastside deck cost & permits: cedar, IPE, composite (2026) guide

  • What inspections did "Bellevue Wing" go through?

    Standard Puget Sound ADU inspection sequence applied: footing, underfloor MEP, framing, plumbing rough, electrical rough, mechanical rough, insulation, drywall nailing, shower pan, gas piping, final building, final plumbing, final electrical, final mechanical, and final energy verification (blower-door ≤3 ACH50). All passed with no notable callbacks — typical for our builds because we run internal QA checklists at each milestone.

    Go deeper: Bellevue ADU permit timeline

PROJECT_BELLEVUE WING

Want a build like "Bellevue Wing" on your lot? Get a real number.

We can share the exact scope, finishes and budget from this project — and tell you what the same build would cost on your address.

  • Same crews, same subs, same standards as "Bellevue Wing"
  • Free build-like-this feasibility on your address
  • Reply within one business day
Replies within 1 business day