Skip to main content
ARCHIVE_02 / Delivered

Field reports.

A selection of recent ADUs, conversions, and additions delivered across the Puget Sound — every one designed, permitted, and built in-house.

Projects shown
Sqft delivered
Cities covered
Liens · claims
MAP_01 / City Distribution
  • Seattle×1
  • Bellevue×1
  • Kirkland×1
  • Tacoma×1
  • Mercer Island×1
  • Redmond×1

Showing 6 projects.

Ballard Monolith — Detached ADU in Seattle, WA
REF_4492 · Detached ADU

Ballard Monolith

A 1,000 sqft DADU featuring vertical cedar cladding and floor-to-ceiling industrial glazing.

Read case study →
City
Seattle, WA
SQ FT
1000
Done
Oct 2023
Bellevue Wing — Attached ADU in Bellevue, WA
REF_4376 · Attached ADU

Bellevue Wing

Side-yard expansion of a craftsman home — independent entry, full kitchen, separate utilities.

Read case study →
City
Bellevue, WA
SQ FT
720
Done
Aug 2023
Tacoma Two-Story — Detached ADU in Tacoma, WA
REF_4581 · Detached ADU

Tacoma Two-Story

Two-story DADU with mixed black-steel and warm cedar slat exterior — long-term rental.

Read case study →
City
Tacoma, WA
SQ FT
1100
Done
Feb 2024
Redmond Pitch — Detached ADU in Redmond, WA
REF_4712 · Detached ADU

Redmond Pitch

Mono-pitch DADU with vertical metal cladding and a single architectural cedar door.

Read case study →
City
Redmond, WA
SQ FT
940
Done
Sep 2024

SERVICES_INDEX

Build the same with our team

Every project here was delivered under one of these scopes — pick the closest match to your site for cost, timeline, and code detail.

FAQ

Past projects — frequently asked

  • How many ADUs have you completed?

    Over 140 ADUs across the Puget Sound since 2017, with 60+ projects completed in the last 24 months alone — split roughly 55% detached DADUs, 25% garage conversions, 15% basement conversions, 5% attached. Project gallery shows a representative selection with addresses redacted at the homeowner's preference.

    Go deeper: Read the Puget Sound ADU timeline guide: kickoff to keys guide

  • Can I see floor plans from your past projects?

    Yes — most project case studies include the as-built floor plan, exterior elevations, and 8–14 finished photos. We redact site plans (per owner privacy preference) but publish the building footprint and typical layout. About 20 of our most-built plans are available as PathwayBuild™ catalog starting points.

    Go deeper: Explore General Contracting

  • Do you publish actual costs from past projects?

    We publish cost ranges per case study (e.g. "$365–$385/sq ft all-in 2024 dollars") rather than exact contract values, to respect client financial privacy. Cost ranges are real, not marketing buffers. For a like-for-like cost benchmark we provide three reference projects matched to your lot/size/finish during feasibility.

    Go deeper: Read the Five hidden ADU costs that wreck Puget Sound budgets guide

  • Can I visit a completed project in person?

    About 8 of our past clients have agreed to host occasional open houses for prospective Golden State clients. We schedule these quarterly and pre-vet attendees so the host's privacy is protected. If you cannot wait for the next open house, a virtual walkthrough (Matterport scan) is available for ~30 finished projects.

    Go deeper: Glossary: ECA (Environmentally Critical Area)

  • How do you photograph finished projects?

    Same-day professional photography at substantial completion (architectural photographer, $1,200–$2,000 cost, included as a marketing expense not billed to client) with the owner's consent. Photos exclude any view that identifies the address from the street, any neighbor's window, or any minor child of the household.

    Go deeper: Read the Eastside deck cost & permits: cedar, IPE, composite (2026) guide

  • Do you build the same plan twice?

    Frequently. About 30% of our pipeline uses one of our 12 PathwayBuild™ catalog plans — slightly customized for site, but pre-engineered for WA seismic Zone D2 and pre-modeled for IECC R406. Re-using a known-good plan cuts design fees 30–40% and shortens permit review by 2–4 weeks because reviewers know the set.

    Go deeper: Explore New Home Construction

  • What's your most popular project type?

    750 sq ft one-bedroom DADU with full kitchen and 3/4 bath, single story, 12:12 roof to match the typical Pacific Northwest aesthetic. That floorplate optimizes lot coverage in 5,000+ sq ft lots, beats most jurisdictions' sprinkler trigger, and rents in the $2,400–$2,900/mo band across the Eastside and Seattle.

    Go deeper: Glossary: ECA (Environmentally Critical Area)

  • Have you built any ADUs that are featured in publications?

    Yes — projects covered by Seattle Met, Pacific NW Magazine (Sunday insert in The Seattle Times), Dwell online, and Houzz editorial features. We list each press placement on the /press page with a link to the original article. Press coverage does not influence which projects we accept; it follows quality of work, not the other way around.

    Go deeper: Read the Puget Sound ADU timeline guide: kickoff to keys guide

BUILD_LIKE / 04

Want one of these on YOUR lot? Tell us which build you're chasing.

Every project here has a backstory — lot size, soils, neighbors, budget. Send the one closest to what you want and we'll tell you what it would cost on your address.

  • Reference a project by name — we share the actual scope
  • Free 'build-like-this' feasibility on your address
  • Same crews, same subs, same standards
Replies within 1 business day
WA Lic. GOLDESA747LZBuilding since 2012
Direct line · Golden State ADU(425) 642-4142

We reply within 1 business day. No spam, ever.

◇ No sales script · No spam · Your details stay with our team