Skip to main content
REF_4581 · Detached ADU · Tacoma, WA

Tacoma Two-Story

Two-story 1,100 sqft DADU in Tacoma's North End — mixed black-steel and warm cedar slat exterior, long-term rental.

Type
Detached ADU
Sqft
1,100
Beds / Baths
2 / 2
Completed
Feb 2024
Duration
36 wks
Budget
$385,000
Tacoma Two-Story — Detached ADU in Tacoma, WA

01 / BRIEF

What the owner asked for

Investor wanted a Class-A rental positioned for the Tacoma-to-Seattle commuter market. Tacoma TMC 13.06.150 (2023) raised the DADU cap to 1,100 sqft on lots ≥4,500 sqft and waived parking entirely within 0.5 miles of a frequent transit corridor.

02 / CHALLENGE

What stood in the way

The lot is 0.4 miles uphill from the 26th & Proctor transit stop — qualifying for parking waiver but introducing a 22-foot grade change to the proposed building pad. The City's geotech threshold (slope ≥15%) triggered a Critical Areas review.

03 / APPROACH

How we solved it

Coordinated with a licensed geotech (Robinson Noble report #RN-23-2241) to confirm bearing capacity and recommend a 24" wide footing with #5 rebar at 12" o.c. Used a pier-and-grade-beam foundation on the downhill corner to avoid over-excavation. The exterior pairs Bridger Steel A606 weathering steel panels (north/east — weather side) with Climate-Shield cedar rainscreen (south/west — view side).

04 / OUTCOME

What got delivered

Construction completed in 24 weeks after a 12-week permit. Rented within 14 days at $2,900/month. Tacoma's 5-year MFTE didn't apply (DADU < 4 units) but the investor secured 30-year fixed financing at 6.875% with the DADU's appraised rental income.

SPEC_05 / FACTS

Project specification

Footprint
550 sqft (two-story)
Bedrooms / baths
2 / 2
Foundation
Pier and grade beam, 24" footings
Lot slope
18% (Critical Areas)

SCHEDULE_06 / PHASES

36-week delivery

  1. 01
    Feasibility & design
    4–6 wks

    Site survey, zoning memo, schematic plans, owner review.

  2. 02
    Construction docs
    3–4 wks

    Structural, MEP, energy compliance, permit-ready set.

  3. 03
    Permit review
    12 wks

    City corrections, utility sign-offs, building permit issued.

  4. 04
    Site work + foundation
    3–4 wks

    Erosion control, excavation, footings, slab or stem wall.

  5. 05
    Framing + dry-in
    5–6 wks

    Floor, walls, roof, windows, weather-resistive barrier.

  6. 06
    MEP rough-in + insulation
    4–5 wks

    Plumbing, electrical, HVAC, blower-door prep.

  7. 07
    Finish + cabinetry
    6–8 wks

    Drywall, paint, flooring, cabinets, tile, fixtures.

  8. 08
    Inspections + handover
    1–2 wks

    Final inspections, punch-list, 24-week build closeout.

MATERIAL_07

Materials

  • Cladding (north/east)
    Bridger Steel A606 weathering steel, 1.5" rib
  • Cladding (south/west)
    Climate-Shield Western Red Cedar rainscreen
  • Windows
    Andersen 100 Series, Fibrex, U-0.28

SYSTEM_08

Systems

  • Heating / cooling
    Bosch IDS 2.0 18K BTU heat pump, ducted
  • Water heating
    Rheem RTGH-95DVLN gas tankless
  • Ventilation
    Broan AI ERV-130S

PERMIT_09 / RECORD

Permits & compliance

  • Permit number
    Tacoma BLDR-2023-19842
  • Critical Areas
    Geo-hazard review approved (RN-23-2241)
  • Right-of-way
    Driveway permit ROW-2023-4451

METRIC_10 / OUTCOME

By the numbers

$2,900
Monthly rent achieved
14
Days on rental market
8.1%
Gross yield (Year 1)

LESSON_11 / FIELD NOTES

What we'd repeat

  • On slopes ≥15%, pulling geotech before architectural CDs lets the engineer right-size the foundation and avoids the most expensive scope creep in this category.
  • Tacoma's 2023 DADU rewrite removed the owner-occupancy requirement for DADUs permitted after July 1, 2023 — meaningful for investor-financed projects.
FAQ

Frequently asked

  • Can I tour a project like "Tacoma Two-Story"?

    Yes — we typically have 6–10 ADUs in framing or finish at any time across the Puget Sound, so we can usually arrange a site walk on a project at the same stage you're planning. For completed projects, tours depend on the current owner's availability and privacy preferences. Request a tour and we'll match you to the closest active or completed project that resembles "Tacoma Two-Story" in size, configuration, and AHJ.

    Go deeper: Read the Cold-weather concrete pours in the Puget Sound (2026 field guide) guide

  • What did this project actually cost?

    Each project page includes the all-in cost range for the size and configuration shown, scaled to 2026 prices. Actual contract value at time of build is confidential to the client, but the range we publish is anchored in real numbers from our bid archive — not aspirational pricing. For a tailored estimate against your lot, run our feasibility study or use the cost calculator.

    Go deeper: Read the Five hidden ADU costs that wreck Puget Sound budgets guide

  • How long did this project take?

    Most projects of this size and configuration run 9–14 months from contract to certificate of occupancy: 6–8 weeks of design, 8–16 weeks of permit, 18–26 weeks of construction. Schedule variance is driven by AHJ workload, owner selection pace, and field-discovered conditions during demo or excavation. We publish a Gantt at contract and update it weekly.

    Go deeper: Read the Eastside deck cost & permits: cedar, IPE, composite (2026) guide

  • Could you build "Tacoma Two-Story" again on my lot?

    Often yes — most of our projects are anchored on repeatable design DNA (envelope details, structural assemblies, MEP standard layouts) that adapt to different lot conditions with modest configuration changes. We'll review your lot's zoning, soils, and access to confirm fit. Where the original layout doesn't fit, we propose the closest workable adaptation that preserves the look you liked.

    Go deeper: Read the Cold-weather concrete pours in the Puget Sound (2026 field guide) guide

  • What inspections did "Tacoma Two-Story" go through?

    Standard Puget Sound ADU inspection sequence applied: footing, underfloor MEP, framing, plumbing rough, electrical rough, mechanical rough, insulation, drywall nailing, shower pan, gas piping, final building, final plumbing, final electrical, final mechanical, and final energy verification (blower-door ≤3 ACH50). All passed with no notable callbacks — typical for our builds because we run internal QA checklists at each milestone.

    Go deeper: Tacoma ADU permit timeline

PROJECT_TACOMA TWO STORY

Want a build like "Tacoma Two Story" on your lot? Get a real number.

We can share the exact scope, finishes and budget from this project — and tell you what the same build would cost on your address.

  • Same crews, same subs, same standards as "Tacoma Two Story"
  • Free build-like-this feasibility on your address
  • Reply within one business day
Replies within 1 business day
WA Lic. GOLDESA747LZBuilding since 2012
Direct line · Golden State ADU(425) 642-4142

We reply within 1 business day. No spam, ever.

◇ No sales script · No spam · Your details stay with our team