Sammamish
ADU Builder.
Design-build DADU, AADU, garage conversion & addition contractor — Sammamish, WA
Sammamish has the largest average lot sizes on the Eastside and a code that supports generous DADUs — but the city's tree code and steep-slope geography mean nearly every project needs a geotech and arborist on the team. We plan both before drawings start.
R-1 / R-4 / R-6 — ADU permitted under SMC 21A.30.090
We file in Sammamish every month — we know which lot configurations sail through and which need pre-application meetings to avoid corrections.
- ·Pine Lake
- ·Inglewood
- ·Klahanie
- ·Trossachs
- ·Beaver Lake
- ·Sahalee
Building in Sammamish
FIELD_NOTESWhat we lean into
- Generous lot sizes allow 1,200 sqft DADUs with full guest-house feel
- Top-quartile rents driven by Issaquah-Sammamish school district
- DADUs can be sited up to 200 ft from the primary home on larger lots
- Premium tenant pool of Microsoft, Costco HQ and Amazon families
What we plan around
- Sensitive Areas Ordinance covers most of the Pine Lake and Beaver Lake basins
- Tree retention: 35% canopy retention required, plus protection of 'landmark' trees ≥30" DBH
- Geotech report required on virtually every lot due to glacial till and slope variability
- Long water/sewer service runs add cost on Trossachs and Sahalee lots
Sammamish ADU Permit Checklist
Two-page fillable PDF tuned to Sammamish, WA — owner & site fields, project intent, and the local site conditions we always pre-screen (R-1 / R-4 / R-6). Fill it on any device, email it back, and we'll set up a free 30-minute feasibility call.
- · Pre-mapped to Sammamish zoning & 12–16 wk permit window
- · Editable on Preview, Acrobat, Chrome — no signup
- · Email back to hello@goldenstateadubuilders.com
What we build in Sammamish
SERVICES_AVAILABLEDETACHED ADU
Stand-alone backyard cottages built from the ground up — engineered for rental income, multi-generational living, or your home office.
02 //ATTACHED ADU
Seamlessly integrated additions — basement, ground-floor, or wing conversions that maintain the architectural integrity of your existing home.
03 //GARAGE CONV.
Convert an under-used garage into a high-end studio, office, or rental quarter without surrendering your driveway.
04 //MODERN ADDITIONS
Structural expansions for growing families — second stories, primary suites, kitchen extensions. Steel, glass, and Pacific Northwest materials.
05 //GENERAL CONTRACTING
Full-service general contracting for remodels, renovations, and ground-up custom homes throughout the Puget Sound region.
06 //FEASIBILITY STUDIES
Before you commit, we analyze zoning, lot coverage, setbacks, utilities, and ROI so you have a real number — not a guess.
Cost to build an ADU in Sammamish
PRICE_GUIDEIndicative turn-key ranges for Sammamish, WA — design, permits, construction and finish carpentry included. Final number depends on lot conditions, finishes and the 12–16 wk Sammamish permit timeline.
“Golden turned a permitting nightmare into a finished, beautiful backyard cottage. They were on schedule every single week, and the fixed-price contract held to the dollar.”
“We interviewed five general contractors. Golden was the only one who walked our lot before quoting. Their structural engineer caught a foundation issue everyone else missed.”
“They converted our garage into a long-term rental that pays our mortgage. Permitted, built, and tenant-ready in 14 weeks — and the finishes look like a custom home.”
Sammamish ADU FAQ
FAQ_0501Is owner-occupancy required in Sammamish?
Is owner-occupancy required in Sammamish?
Yes. The owner must reside in either the primary house or the ADU. The unit cannot be sold separately under condominium regime.
02Can I build a DADU and an AADU on the same Sammamish lot?
Can I build a DADU and an AADU on the same Sammamish lot?
Only one ADU is permitted per lot, type owner's choice. Lots over 1 acre may apply for a guest house in addition under separate guest-house provisions.
03How does the Sensitive Areas Ordinance affect siting?
How does the Sensitive Areas Ordinance affect siting?
Streams, wetlands and slopes ≥40% require buffers (50–225 ft depending on classification). We pull the SAO map at feasibility to confirm a buildable envelope before drawings.
04What's the typical Sammamish ADU permit timeline?
What's the typical Sammamish ADU permit timeline?
12–16 weeks from intake. Geotech and SAO reviews are the long poles; we sequence them in parallel with structural review.
05Are short-term rentals allowed?
Are short-term rentals allowed?
Sammamish requires a short-term rental permit and limits unhosted rentals to the principal residence. Rental of the ADU short-term is generally only allowed if the owner lives in the primary home.
Build in Sammamish.
Free site walk.
REQUEST CONSULTATIONNearby cities we build in
Sammamish datasets
All Golden State services in Sammamish
Stand-alone backyard cottages built from the ground up — engineered for rental income, multi-generational living, or your home office.
Seamlessly integrated additions — basement, ground-floor, or wing conversions that maintain the architectural integrity of your existing home.
Convert an under-used garage into a high-end studio, office, or rental quarter without surrendering your driveway.
Structural expansions for growing families — second stories, primary suites, kitchen extensions. Steel, glass, and Pacific Northwest materials.
Full-service general contracting for remodels, renovations, and ground-up custom homes throughout the Puget Sound region.
Before you commit, we analyze zoning, lot coverage, setbacks, utilities, and ROI so you have a real number — not a guess.
Frequently asked
How much does an ADU cost in Sammamish, WA in 2026?
Turn-key ADUs in Sammamish run roughly $295–$465 per square foot all-in for 2026 contracts, depending on lot access, foundation type, and finish package. A 600 sqft one-bedroom DADU typically closes between $215K and $310K including permits, side-sewer connection, and electrical service work. The biggest swing factors in Sammamish are soils (pier-and-beam adds $18–32K over a slab), required stormwater detention on lots over 2,000 sqft of impervious, and whether a panel upgrade to 200A is needed. Our Sammamish feasibility report gives you a ±15% number in two weeks for $1,500, credited to the build contract.
How long does the ADU permit take in Sammamish?
Median Sammamish ADU permit issuance is currently 8–16 weeks from a clean submittal in 2026, faster on pre-engineered catalog plans. The bottlenecks are almost never the zoning review — they are side-sewer capacity letters, drainage review on lots with steep slopes, and addressing assignments. We pull a pre-application meeting with Sammamish planning before drawings start, which typically saves one full review cycle (4–6 weeks). RCW 36.70A.681 requires most WA jurisdictions to permit ADUs ministerially when zoning is met, which has trimmed median timelines roughly 30% versus 2022.
What size DADU can I build on my Sammamish lot?
Under HB 1337 / RCW 36.70A.681, Sammamish must allow at least one DADU up to 1,000 sqft on any residential lot zoned for single-family, with height to 24 ft and standard 5 ft side/rear setbacks unless local code is more permissive. Many Sammamish zones allow a second ADU (a stacked DADU or AADU + DADU combo). Your ceiling is usually lot coverage, not the 1,000 sqft cap — once you add the primary house footprint plus the new DADU plus impervious driveway and walks, you frequently hit the lot-coverage ratio before the size cap. Our zoning lookup checks both.
Do I need to live on the property to build a Sammamish ADU?
No. Owner-occupancy requirements were preempted statewide by RCW 36.70A.681 — Sammamish cannot impose an owner-occupancy condition on either the primary or accessory unit. That means you can build a DADU and rent both units, build a DADU for a family member while living off-site, or build to sell. Short-term rentals (≤30 days) are still governed by local STR codes, which vary; long-term rentals (30+ days) face no special restriction beyond standard landlord-tenant law (RCW 59.18).
Can I subdivide and sell the ADU separately in Sammamish?
Yes, in most Sammamish zones, since the 2023 unit-lot subdivision and condominiumization changes paired with HB 1110 middle-housing reform. The two common pathways are: (1) unit-lot subdivision — carving a new fee-simple lot around the DADU, requires a short plat (~4–6 months) and shared-driveway easements; (2) condominium declaration under RCW 64.34 — faster (~2 months) but lenders sometimes resist financing a 2-unit condo. We model both at feasibility because the right answer depends on your hold-vs-sell horizon and current lender appetite.
What is the rental income from a Sammamish ADU?
2026 Sammamish ADU rent comps for a 1-bedroom DADU built to current finish standards land in a wide band depending on submarket — generally $1,950–$3,200/mo for a long-term lease, with mid-term (30–90 day) commanding 10–25% premium. Net operating income after vacancy (5%), management (8%), maintenance reserve (5%), and property tax/insurance increment typically hits 62–70% of gross. At today's construction cost and rent comps the unleveraged cap on a new Sammamish DADU pencils 4.8–6.4%, with leveraged cash-on-cash 7–11% using a HELOC or renovation loan.
Will an ADU raise my Sammamish property taxes?
Yes, but predictably. The county assessor adds the marginal improvement value (typically 55–70% of construction cost, not 100%) to your assessed value, and the levy rate applies to that increment under RCW 84.40.0301. For a $270K-cost DADU in Sammamish, expect roughly $1,900–$3,100/yr of additional property tax depending on your levy code area. The increment is partially offset because King and Pierce County both classify newly created ADUs into a single building-permit assessment cycle, not a full reassessment of the primary house.
What's the first step to build an ADU in Sammamish?
Start with a paid feasibility study — not a plan set. The feasibility deliverable is a 12–20 page report covering Sammamish zoning analysis, setbacks and lot-coverage math, water meter sizing, side-sewer capacity, electrical service amperage, critical-areas screening, three layout options, and a ±15% budget. It costs $1,500 and is credited to the construction contract. This step eliminates the two most expensive surprises — an undersized water service and an unmappable side sewer — before you spend $15K+ on full design. Schedule a free 20-minute scoping call to confirm fit.