Burien
ADU Builder.

Design-build DADU, AADU, garage conversion & addition contractor — Burien, WA

Burien sits just south of Seattle with rents that are catching up but a land basis that hasn't. The 2022 ADU update fully legalized DADUs in every residential zone, and South King airport-corridor demand from SeaTac employees keeps long-term occupancy strong.

8–12 wk
Permit Timeline
5,000 sqft (ADU lots)
Lot Minimum
6+
Neighborhoods
12 yrs
Local Experience
ZONING / LOCAL CODE

RS-7,200 / RS-12,000 — ADU + DADU permitted under BMC 19.18

We file in Burien every month — we know which lot configurations sail through and which need pre-application meetings to avoid corrections.

NEIGHBORHOODS WE SERVE
  • ·Three Tree Point
  • ·Gregory Heights
  • ·Boulevard Park
  • ·Lake Burien
  • ·Manhattan
  • ·Olde Burien

Building in Burien

FIELD_NOTES
WHY_HERE

What we lean into

  • DADU permitted by right in all RS zones
  • Strong cap rates — Seattle-adjacent rents at South King prices
  • SeaTac airport tenant pool delivers reliable long-term occupancy
  • 8–12 week permit timelines
WATCH_OUT

What we plan around

  • FAA height overlays cover lots within Sea-Tac approach corridors
  • Three Tree Point and Gregory Heights have steep-slope and bluff overlays
  • Older Olde Burien blocks have 6" sewer mains at capacity
  • Aircraft noise overlay (NEM 65 dB) requires sound-rated assemblies on north-end lots
CHECKLIST_01 / BURIEN_FEASIBILITY

Burien ADU Permit Checklist

Two-page fillable PDF tuned to Burien, WA — owner & site fields, project intent, and the local site conditions we always pre-screen (RS-7,200 / RS-12,000). Fill it on any device, email it back, and we'll set up a free 30-minute feasibility call.

  • · Pre-mapped to Burien zoning & 8–12 wk permit window
  • · Editable on Preview, Acrobat, Chrome — no signup
  • · Email back to office@golden-adu.com
FILE / burien-adu-permit-checklist.pdf
Email completed PDF →

Or call (425) 642-4142

Cost to build an ADU in Burien

PRICE_GUIDE

Indicative turn-key ranges for Burien, WA — design, permits, construction and finish carpentry included. Final number depends on lot conditions, finishes and the 8–12 wk Burien permit timeline.

DADU
$140K – $400K

6–8 months · 400–1,000 sqft

DETACHED ADU in Burien
AADU
$95K – $320K

4–5 months · 300–800 sqft

ATTACHED ADU in Burien
Garage
$65K – $240K

3–4 months · 200–600 sqft

GARAGE CONV. in Burien
Additions
$120K – $480K

Project dependent · Custom

MODERN ADDITIONS in Burien
CLIENT_REPORT
Golden turned a permitting nightmare into a finished, beautiful backyard cottage. They were on schedule every single week, and the fixed-price contract held to the dollar.
Marcus Henderson
Homeowner · Ballard, Seattle · 2023
REF_4492
We interviewed five general contractors. Golden was the only one who walked our lot before quoting. Their structural engineer caught a foundation issue everyone else missed.
Sade Okafor
Owner-Architect · Bellevue · 2023
REF_4376
They converted our garage into a long-term rental that pays our mortgage. Permitted, built, and tenant-ready in 14 weeks — and the finishes look like a custom home.
Jin & Lauren Park
Investor Homeowners · Kirkland · 2024
REF_4218

Burien ADU FAQ

FAQ_03
01

Will my Burien DADU need extra sound insulation?

Inside the NEM 65 dB overlay, yes — STC-rated windows, doors and roof assemblies are required. Cost premium runs $6–14K. We confirm overlay status at feasibility.

02

How does the FAA height overlay work?

Lots within the airport approach surfaces have a sloped height ceiling. Most parcels are well above the surface; we run a Form 7460-1 check at feasibility for north Burien lots.

03

Is owner-occupancy required?

No, removed in the 2022 update.

Build in Burien.
Free site walk.

REQUEST CONSULTATION

CITY_INTEL / Burien · Verified 2026-01-15

Burien ADU intelligence

Burien has aligned with HB 1337 and is one of the more affordable King County ADU markets directly south of Seattle. The split that matters here is east vs. west of 1st Avenue South — east-side lots are flat and predictable, while west-side bluff lots above Puget Sound carry real geotech and access constraints.

Zoning

Burien allows detached ADU (DADU) on single-family lots (up to 1,000 sf), no owner-occupancy requirement, and no off-street parking required near transit.

Permit lead-time

1028 weeks

Includes one typical correction cycle.

DADU cost range

$260k–$484k · typical $353k

Cost tier 4/5 · excludes land.

Typical end-to-end

~60 weeks

Feasibility → final sign-off, typical scenario.

What slows ADUs here

  • bluff geotech on west-side parcels
  • airport noise mitigation reviews
  • older septic-to-sewer conversions

Feasibility blockers to map early

  • coastal bluff (Three Tree Point, Seahurst)
  • steep slope
  • airport noise overlay (north end)
  • Coastal bluff geotech is the dominant constraint west of 1st Ave S; airport noise overlays apply on the north end.
  • Tree-retention applies above thresholds; mature stands in Gregory Heights and Seahurst trigger arborist review.
FAQ

Frequently asked

  • How much does an ADU cost in Burien, WA in 2026?

    Turn-key ADUs in Burien run $300–$400 per square foot all-in for 2026 contracts. A 600 sqft one-bedroom DADU typically closes between $180K and $240K including permits, side-sewer connection, and electrical service work. Cost swing factors in Burien: soils (pier-and-beam adds $18–32K over a slab), required stormwater detention on lots over 2,000 sqft of impervious, and whether a panel upgrade to 200A is needed. Our Burien feasibility report gives you a ±15% number in two weeks for $1,500, credited to the build contract.

    Go deeper: Burien ADU cost breakdown

  • How long does the ADU permit take in Burien?

    Median Burien ADU permit issuance is currently 8–16 weeks from a clean submittal in 2026, faster on pre-engineered catalog plans. The bottlenecks are almost never zoning — they are side-sewer capacity letters, drainage review on lots with steep slopes, and addressing. We pull a pre-application meeting with Burien planning before drawings start, which typically saves one full review cycle (4–6 weeks). RCW 36.70A.681 requires WA jurisdictions to permit ADUs ministerially when zoning is met, which has trimmed median timelines roughly 30% versus 2022.

    Go deeper: Burien ADU permit timeline

  • What size DADU can I build on my Burien lot?

    Under HB 1337 / RCW 36.70A.681, Burien must allow at least one DADU up to 1,000 sqft on any residential lot zoned for single-family, with height to 24 ft and standard 5 ft side/rear setbacks unless local code is more permissive. Many Burien zones allow a second ADU (stacked DADU or AADU + DADU). Your ceiling is usually lot coverage, not the 1,000 sqft cap — primary footprint + DADU + impervious drive often hits the coverage ratio first. Our zoning lookup checks both.

    Go deeper: Burien ADU zoning lookup

  • Do I need to live on the property to build a Burien ADU?

    No. Owner-occupancy requirements were preempted statewide by RCW 36.70A.681 — Burien cannot impose an owner-occupancy condition on either unit. You can build a DADU and rent both units, build for a family member while living off-site, or build to sell. Short-term rentals (≤30 days) are still governed by local STR codes; long-term rentals (30+ days) face no special restriction beyond standard landlord-tenant law (RCW 59.18).

    Go deeper: Burien ADU permit timeline

  • Can I subdivide and sell the ADU separately in Burien?

    Yes, in most Burien zones, since the 2023 unit-lot subdivision and condominiumization changes paired with HB 1110. Two pathways: (1) unit-lot subdivision — carving a fee-simple lot around the DADU, requires a short plat (~4–6 months) and shared-driveway easements; (2) condominium declaration under RCW 64.34 — faster (~2 months) but lenders sometimes resist a 2-unit condo. We model both at feasibility because the right answer depends on hold-vs-sell horizon and current lender appetite.

    Go deeper: Burien ADU permit timeline

  • What rental income will a Burien ADU generate?

    2026 Burien comps for a 1-bedroom DADU built to current finish standards land $1,950–$3,200/mo long-term, with mid-term (30–90 day) 10–25% higher. Net operating income after vacancy (5%), management (8%), maintenance reserve (5%), and property tax/insurance increment typically hits 62–70% of gross. At today's construction cost and rent comps the unleveraged cap on a new Burien DADU pencils 4.8–6.4%, with leveraged cash-on-cash 7–11% using a HELOC or renovation loan.

    Go deeper: Burien ADU permit timeline

  • Will an ADU raise my Burien property taxes?

    Yes, but predictably. The county assessor adds the marginal improvement value (typically 55–70% of construction cost, not 100%) to your assessed value, and the levy rate applies to that increment under RCW 84.40.0301. For a $210K-cost DADU in Burien, expect roughly $1,900–$3,100/yr of additional property tax depending on your levy code area. The primary residence assessment is not reopened — only the new improvement is added.

    Go deeper: Burien ADU permit timeline

  • What's the first step to build an ADU in Burien?

    Start with a paid feasibility study — not a plan set. The 12–20 page report covers Burien zoning analysis, setbacks and lot-coverage math, water meter sizing, side-sewer capacity, electrical service amperage, critical-areas screening, three layout options, and a ±15% budget. $1,500, credited to the build contract. This step eliminates the two most expensive surprises — undersized water service and an unmappable side sewer — before you spend $15K+ on full design.

    Go deeper: Burien ADU permit timeline

  • Can I build a basement ADU in Burien?

    Yes when ceiling height, light/ventilation, and emergency egress meet IRC R310. Burien basements that fall short on ceiling (need 7'-0" min, 6'-8" at beams) or egress window opening (5.7 sqft net clear, 24" high, 20" wide, sill ≤44" AFF) typically need underpinning or window-well excavation. Cost band on a clean Burien basement conversion is $145–$220K including new full bath, kitchenette, separate exterior entry, fire separation, and dedicated panel feeder.

    Go deeper: Burien ADU permit timeline

  • What financing works for a Burien ADU in 2026?

    Five common Burien structures: (1) HELOC against the primary, fastest, 8.0–9.5% APR, no separate appraisal; (2) renovation loan (Fannie HomeStyle / Freddie CHOICERenovation), single-close, uses after-built value, 7.1–7.9%; (3) cash-out refi, only if existing mortgage is above market; (4) construction-to-perm, best for ground-up DADUs with 12-month draw; (5) WSHFC ADU pilot at ~3.5–4.25% for owner-occupants ≤120% AMI. We coordinate with five Burien-area credit unions and three banks with ADU-experienced underwriters.

    Go deeper: Burien ADU permit timeline

  • Do I need a sprinkler system for my Burien ADU?

    Usually no. Per IRC R313 and WA state amendments, single-family dwellings and ADUs under 5,000 sqft of fire-flow calculation area generally do not require residential sprinklers in Burien. Triggers that flip the answer: total combined floor area of primary + ADU exceeding 5,000 sqft, structures over three stories above grade, lots beyond fire-flow distance, or specific local fire-marshal interpretations on shared-wall AADU configurations. Verified at feasibility against the Burien fire marshal's current rule sheet.

    Go deeper: Burien ADU permit timeline

  • Can I use my Burien ADU as a short-term rental?

    Sometimes. WA preemption under RCW 36.70A.681 forces Burien to allow ADUs but does not preempt short-term-rental ordinances. Some Puget Sound jurisdictions require owner-occupancy on at least one unit for STR, cap STR nights per year, or require a separate STR permit and lodging-tax registration with WA DOR. Long-term (30+ day) rentals always work. Check our Burien-specific STR rules before underwriting any STR-dependent pro forma.

    Go deeper: Burien ADU permit timeline

  • What permits do I need to build an ADU in Burien?

    Standard Burien ADU permit stack: building permit (covers structural, mechanical, plumbing under combined review), side-sewer permit (separate, issued by Burien utilities), water meter capacity check (may trigger upsize fee), electrical permit (issued by L&I in most Burien unincorporated areas, by the city in Burien proper), and where applicable: drainage review, addressing, demolition, right-of-way for utility cut. We pull all permits on your behalf and itemize fees as a pass-through, not a markup.

    Go deeper: Burien ADU permit timeline

  • How tall can my Burien DADU be?

    Most Burien zones now allow 24 ft to midpoint of roof for DADUs under HB 1337, with some pre-existing zones permitting up to 30 ft on larger lots. Height is measured from existing grade or ABE (Average Building Elevation), and roof overhangs typically don't count. Two-story DADUs at 22–24 ft midpoint generally fit single-family neighborhoods without bulk objections, while clearing the head-height needed for a code stair and 8 ft upper-floor ceilings.

    Go deeper: Burien ADU permit timeline

  • Do I need parking for my Burien ADU?

    No new parking is required under RCW 36.70A.681 for ADUs within ½ mile of a major transit stop or in lots ≤4,000 sqft, and Burien's implementing code largely preserves that exemption citywide. For lots outside that band, Burien may require one off-street stall per ADU. Tandem parking on the existing driveway typically qualifies, which means most Burien lots add a DADU without adding new pavement.

    Go deeper: Burien ADU permit timeline

  • Can I build an ADU in a Burien HOA?

    Sometimes. RCW 64.38.034 (effective 2024) prohibits Burien HOAs from banning ADUs outright on lots zoned for single-family, but HOAs may impose design covenants — siding material, roof pitch, façade articulation. We've built in Burien HOAs by submitting design concepts to the architectural review board in parallel with permit submittal, which keeps the schedule intact. Add 4–8 weeks for ARB review on top of city permit time.

    Go deeper: Burien ADU permit timeline

  • What's the cheapest way to add an ADU in Burien?

    Garage conversion on an existing slab, kitchen on the existing plumbing wall, no electrical service upgrade, no critical-areas review. Real-world floor for a clean Burien conversion is $185–$235K in 2026 dollars. Below that price point you are usually looking at an unpermitted job that will not refinance, insure, or transfer at sale. The price assumes IRC R310 egress is achievable without major exterior wall surgery.

    Go deeper: Burien ADU permit timeline

  • Do I need a drainage report for my Burien ADU?

    Triggered when new + replaced impervious surface exceeds the Burien threshold (commonly 2,000 sqft in King County / 5,000 sqft of land disturbance). Most 600 sqft DADUs with a permeable walkway stay under. Lots over the threshold need a drainage report by a WA-licensed civil engineer and may need detention — vault or rain garden — adding $8–22K. Site planning around impervious is the cheapest fix; we model it during feasibility.

    Go deeper: Burien ADU permit timeline

  • Will my Burien ADU need an energy code upgrade?

    Yes — every new ADU in Burien is permitted to the current 2021 WSEC residential energy code (IECC R406 path 1, 2, or 3 with WA amendments). Typical compliance package: R-21 walls (R-23 effective with continuous), R-49 attic, U-0.28 windows, sealed combustion or heat-pump HVAC, ERV/HRV for IAQ, and blower-door test ≤3 ACH50. The energy package adds roughly $8–14K versus 2018 code; required regardless of finish tier.

    Go deeper: Burien ADU permit timeline

  • Can I add a second ADU on my Burien lot?

    Often yes. HB 1337 requires Burien to allow two ADUs on lots zoned for single-family in jurisdictions over 25,000 population, configured as DADU + AADU, two AADUs, or a stacked two-unit DADU. Some Burien zones restrict to one ADU + JADU. Combined floor area cap is typically 2,000 sqft for both ADUs combined. We map your specific zone's ADU count at feasibility — answer depends on the parcel's zone designation, not citywide rules.

    Go deeper: Burien ADU zoning lookup

  • What's the difference between a DADU and AADU in Burien?

    A DADU (detached) is a freestanding structure separated from the primary house by at least 5 ft. An AADU (attached) shares at least one wall with the primary, typically as an addition or interior conversion with a separate entrance. Burien treats both under the same RCW 36.70A.681 preemption — same size cap (up to 1,000 sqft), same setback relief, same parking exemption. Cost differs: DADUs cost ~12–18% more per sqft because they need a complete envelope; AADUs share existing walls and roof.

    Go deeper: Burien ADU permit timeline

  • Do I need a survey for my Burien ADU?

    Recommended in nearly every case. Burien reviewers require precise setback measurements from property lines, not from the curb or fence. A recent boundary survey (BLA-compliant, sealed by a WA-licensed surveyor) costs $1,200–$2,800 and locks the setback math. The exception: lots with a recent (≤5 year) recorded survey that has not been disturbed by fence or grading work. We include survey coordination in feasibility deliverables.

    Go deeper: Burien ADU permit timeline

  • How do utility hookups work for a Burien ADU?

    Three utility paths in Burien: (1) water — extend from the existing meter if size supports flow demand; otherwise upsize meter ($3,500–$11,000 capacity fee); (2) sewer — separate side-sewer tap from main, or shared connection with cleanout, requires Burien utilities permit ($1,800–$4,400); (3) electrical — sub-feeder from primary panel if capacity allows, otherwise 200A service upgrade ($4,800–$9,200). Gas is optional and depends on cooktop/water-heater choice. We submit all utility paperwork in parallel with the building permit.

    Go deeper: Burien ADU permit timeline

  • Will my Burien ADU need fire separation from the primary house?

    When wall-to-wall separation is less than 5 ft, IRC R302 requires 1-hour fire-rated assemblies on both exterior walls facing each other (5/8" Type X gypsum, no openings), and at separation less than 3 ft a 1-hour fire-rated assembly with sprinklers may be required by Burien fire marshal. Detached DADUs at 5 ft+ separation typically need no special fire rating — standard envelope assemblies satisfy code.

    Go deeper: Burien ADU permit timeline

  • Can I sell my Burien ADU as a condo unit?

    Yes via condominium declaration under RCW 64.34, typically faster than unit-lot subdivision (~2 months vs 4–6) but with lender constraints — many residential lenders require a minimum 3-unit condo for conventional financing, so a 2-unit condo can limit buyer pool. Portfolio lenders and non-QM lenders work with 2-unit condos. We refer clients to a WA real-estate attorney to draft the declaration and CC&Rs; budget $4,800–$8,500 for legal.

    Go deeper: Burien ADU permit timeline

BURIEN / BUILD

Building an ADU in Burien? Get a real number on your lot — free.

Burien is one of our top markets. We'll send a Burien-specific feasibility brief (zoning, fees, soils, timeline) for your address within 48h.

  • Burien permit + fee schedule for 2026
  • Lot-specific zoning + setback diagram
  • Free 2-page PDF within 48h
Replies within 1 business day
WA Lic. GOLDESA747LZBuilding since 2012

Burien owners are 1 of every 3 ADUs we delivered in 2026.

Direct line · Golden State ADU(425) 642-4142

We reply within 1 business day. No spam, ever.

◇ No sales script · No spam · Your details stay with our team