Skip to main content
COMPARE_01 / DADU vs AADU

DADU or AADU?
18 factors, one call.

Detached or attached — the most expensive decision in an ADU project, made before you talk to a designer. This is the side-by-side our project managers walk every homeowner through, with real Puget Sound cost, timeline, rent, and code consequences for each path.

MATRIX_01 / 18-Factor Comparison

Head-to-head

FactorDADU (Detached)AADU (Attached)Edge
Build cost (typical 800 sqft)$285k–$330k turnkey$230k–$275k turnkeyAADU
$/sqft (Puget Sound)$330–$380/sqft$285–$345/sqftAADU
Permit timeline (Seattle median)16–22 weeks10–14 weeksAADU
Time to certificate of occupancy9–12 months6–8 monthsAADU
Privacy from main houseFull separationShared wall / floorDADU
Market rent (Seattle 1BR)$2,100–$2,650/mo$1,700–$2,150/moDADU
Appraisal lift on main property+12–18% typical+6–10% typicalDADU
STR (Airbnb) suitabilityExcellent — private entryMixed — shared utilitiesDADU
Required lot area5,000 sqft+ practicalAny lot with main homeAADU
Setback complexity5'/10' rear & side, height stepbacksInherits main house envelopeAADU
Utility hookup cost$15k–$45k new services$3k–$12k extension of existingAADU
Tree retention exposureHigh — new footprintLow — within existing envelopeAADU
Financing optionsConstruction-perm, HELOC, renovation, WSHFCHELOC, renovation, cash-out refiDADU
Tenant separation for §121 exclusionClean separation supports itIRS scrutiny on shared facilitiesDADU
HB 1337 statewide rightYes — 2 ADUs allowedYes — 2 ADUs allowedTie
Disruption during constructionLow — no impact on main houseModerate–high — shared HVAC, walls openDADU
Future sale-as-condo potentialPossible (where unit-lot subdivisions allowed)Not possible without condo conversionDADU
Energy code compliance easeEasier — purpose-built envelopeHarder — must integrate with existingDADU
DECIDE_01 / Pick by your goal

Ten common scenarios

Maximize long-term rental incomeDADU

Higher market rent + standalone tenant appeal + better STR convertibility

Smallest budget, fastest occupancyAADU

Lower $/sqft, ½ the permit time, no new utility services

Aging parent moving inDADU

Privacy, single-level accessibility, no shared HVAC/noise

Adult child temporary stayAADU

Cheapest, fastest, can convert back to main-house space later

Maximize property value liftDADU

Independent structure appraises stronger; better comp lift

Small lot (< 5,000 sqft)AADU

DADU setbacks usually impossible; basement/wing build works

Lot with mature trees (Seattle)AADU

Avoids tree-removal exposure under SMC 25.11

Plan to sell ADU separately somedayDADU

Required for unit-lot subdivision and easier condo conversion

Sloped or constrained siteAADU

Basement conversion sidesteps grading and foundation cost

Have a detached garage alreadyDADU

Garage-to-DADU conversion captures existing footprint

CODE_01 / By City

Size & height by city

CityDADU maxAADU maxDADU heightNote
Seattle1,000 sqft (1,200 w/ 2-story)1,000 sqft18'–24' (lot-dependent)Two ADUs allowed per lot under SMC 23.44.041
Bellevue1,200 sqft1,200 sqft25'LUC 20.30JJ — two ADUs per lot
Kirkland1,200 sqft1,200 sqft24'KZC 115 — owner occupancy removed in 2024
Redmond1,200 sqft1,200 sqft25'RZC 21.08 — two ADUs allowed
Tacoma1,000 sqft1,000 sqft18'TMC 13.06.150 — HB 1337 compliant
Renton1,000 sqft1,000 sqft18'RMC 4-2-110 — two ADUs allowed
DADU_vs_AADU / DECIDE

DADU or AADU for YOUR lot? Stop guessing — get a 10-minute call with one clear answer.

Lot shape, soils, rental goal, neighbor situation — we weigh all four and commit to one recommendation. No 'it depends'.

  • One clear answer — DADU or AADU — for your lot
  • Includes the cost delta in 2026 dollars
  • Free 10-min call with a licensed PM
Replies within 1 business day
WA Lic. GOLDNAB882L2Building since 2012
Direct line · Golden State ADU(206) 555-0192
LEAD_01 / FREE_CONSULT

Decide DADU vs AADU

Address + your top goal (rental, multigen, resale). We commit.

We reply within 1 business day. No spam, ever.

◇ No sales script · No spam · Your details stay with Leo