Skip to main content
FILE_11 / WARRANTY

We stand
behind it.

A written warranty handed to every client at close-out. Backed by an in-house service crew — not an outsourced call center.

SECTION_012 years

Workmanship

Full coverage on framing, finish carpentry, drywall, paint, and trim. We come back, no questions, and make it right.

SECTION_025 years

Building envelope

Roofing, siding, flashing, windows, and weather-resistive barrier — every penetration documented and warrantied.

SECTION_0310 years

Structural

Foundation, load-bearing framing, and lateral system. PE-stamped drawings retained on file for the life of the structure.

SECTION_04Lifetime

Support line

Direct phone access to your project manager for as long as you own the property. Real human, no ticket queue.

QC_PROGRAM

Quality control,
documented.

  • 01Pre-pour foundation inspection — third-party verified
  • 02Framing inspection before insulation — interior & exterior
  • 03Blower-door test on every conditioned envelope
  • 04Photo documentation of every concealed penetration
  • 05Manufacturer-certified install for windows, siding & roofing
  • 06Final commissioning checklist signed by client at walkthrough

Want the full warranty document?

We share the complete signed warranty during your consultation — line by line, before any contract.

REQUEST WARRANTY PDF
FAQ

Frequently asked

  • What is this warranty page for?

    This warranty page is one node in our reference library for Puget Sound ADU owners and prospective builders. Every page is written to be useful on its own and to link cleanly to the next decision you need to make — feasibility, financing, permit, build, or hold. If you can't find what you need, use the contact form or book a free scoping call.

    Go deeper: Workmanship Warranty

  • How does this page connect to my actual project?

    Information on this page is anchored in current 2026 WA code (RCW 36.70A.681 / HB 1337 statewide preemption, IECC residential energy code, local AHJ implementing ordinances) and current Golden State internal data (bid archive, permit logs, rent comps). The next concrete step is almost always a feasibility study — $1,500, two weeks, credited to your build contract.

    Go deeper: Read the Eastside deck cost & permits: cedar, IPE, composite (2026) guide

  • Where do I go from here?

    Three good next stops: (1) the ROI calculator if you're evaluating whether the math works on your lot; (2) the permit timeline page for current AHJ medians in your city; (3) the contact form to book a free 20-minute scoping call. Every page in this library cross-links the most relevant next pages at the bottom.

    Go deeper: Glossary: ECA (Environmentally Critical Area)

COVER_11 / 10_YEAR

10-year structural, 2-year workmanship — written, not whispered.

We'll send you the warranty document we hand every client at closeout. Read it before you sign with anyone — ours or otherwise.

  • Actual warranty PDF emailed to you (not marketing copy)
  • Coverage backed by RCW 64.50 + our own escrow
  • Most builders won't share theirs — that's the tell
Replies within 1 business day
WA Lic. GOLDESA747LZBuilding since 2012
Direct line · Golden State ADU(425) 642-4142

We reply within 1 business day. No spam, ever.

◇ No sales script · No spam · Your details stay with our team