Skip to main content
FILE_10 / PRESS

In the
record.

Recent coverage

PRESS_INDEX
  • Feb 2025
    Seattle Met

    How Seattle's New DADU Rules Are Reshaping Backyards

    Daniel Golden weighs in on why detached ADUs are quietly transforming the city's single-family lots.

  • Nov 2024
    GeekWire

    Inside the ADU Boom: Builders Race to Meet Demand

    A profile of Seattle ADU specialists, including Golden State ADU Builders' fixed-price model.

  • Aug 2024
    The Seattle Times

    Backyard Cottages Are No Longer Niche

    Coverage of the post-2019 ADU surge featuring three Golden-built DADUs in Ballard and Wallingford.

  • May 2024
    Houzz

    Best of Houzz 2024 — Service Winners

    Golden State ADU Builders recognized for client satisfaction in the Pacific Northwest region.

  • Oct 2023
    Curbed Seattle

    A Steel-Clad DADU in Ballard, in 11 Months

    Photo feature on the Ballard Monolith — a 720 sf detached ADU completed by Golden.

Awards & recognition

CITATIONS
2024

REX Award — Best ADU Build

Master Builders Association of King & Snohomish Counties

2024

Houzz Best of Service

Recognized for client satisfaction across 40+ verified projects

2023

Energy Star Certified Builder

U.S. Environmental Protection Agency

2023

Seattle Met Top Builder

Featured in annual Home & Design issue

2022

BBB Accredited — A+ Rating

Better Business Bureau, Pacific Northwest

2021

NARI Contractor of the Year — Finalist

Pacific Northwest Chapter, Residential Addition

FAQ

Frequently asked

  • What is this press page for?

    This press page is one node in our reference library for Puget Sound ADU owners and prospective builders. Every page is written to be useful on its own and to link cleanly to the next decision you need to make — feasibility, financing, permit, build, or hold. If you can't find what you need, use the contact form or book a free scoping call.

    Go deeper: Glossary: ECA (Environmentally Critical Area)

  • How does this page connect to my actual project?

    Information on this page is anchored in current 2026 WA code (RCW 36.70A.681 / HB 1337 statewide preemption, IECC residential energy code, local AHJ implementing ordinances) and current Golden State internal data (bid archive, permit logs, rent comps). The next concrete step is almost always a feasibility study — $1,500, two weeks, credited to your build contract.

    Go deeper: Read the Eastside deck cost & permits: cedar, IPE, composite (2026) guide

  • Where do I go from here?

    Three good next stops: (1) the ROI calculator if you're evaluating whether the math works on your lot; (2) the permit timeline page for current AHJ medians in your city; (3) the contact form to book a free 20-minute scoping call. Every page in this library cross-links the most relevant next pages at the bottom.

    Go deeper: Glossary: ECA (Environmentally Critical Area)

MEDIA_06 / INQUIRY

Need a quote, a stat, or a site visit? Send it through.

We respond to press requests within 24h — Pacific time. ADU permit data, cost trends, code change reactions, on-camera site walks.

  • On-record quotes from a licensed WA general contractor
  • Anonymized permit + cost data for Puget Sound
  • Same-week site visits in Seattle metro
Replies within 1 business day
WA Lic. GOLDESA747LZBuilding since 2012
Direct line · Golden State ADU(425) 642-4142

We reply within 1 business day. No spam, ever.

◇ No sales script · No spam · Your details stay with our team