Skip to main content
Everett skyline at golden hour
REGION / EVERETT, WA

Everett
ADU Builder.

Design-build DADU, AADU, garage conversion & addition contractor — Everett, WA

Everett's 2023 housing code overhaul fully legalized DADUs in every residential zone with no owner-occupancy. With Boeing, Naval Station Everett and Providence Regional driving tenant demand, Everett's ADU economics rival Tacoma at a slightly higher rent ceiling. Older Riverside and Bayside lots often need utility upgrades.

10–14 wk
Permit Timeline
6,000 sqft
Lot Minimum
8+
Neighborhoods
12 yrs
Local Experience
ZONING / LOCAL CODE

R-1 / R-2 / R-3 / R-4 — ADU + DADU permitted under EMC 19.04

We file in Everett every month — we know which lot configurations sail through and which need pre-application meetings to avoid corrections.

NEIGHBORHOODS WE SERVE
  • ·Riverside
  • ·Bayside
  • ·Port Gardner
  • ·Silver Lake
  • ·Pinehurst
  • ·View Ridge
  • ·Glacier View
  • ·Cascade View

Building in Everett

FIELD_NOTES
WHY_HERE

What we lean into

  • Two ADUs per lot allowed in all R-zones after 2023 code update
  • No owner-occupancy and no off-street parking minimum
  • Boeing 777X program plus Providence Regional anchor a deep tenant pool
  • Faster review than Snohomish County unincorporated areas
WATCH_OUT

What we plan around

  • Pre-1950 Riverside and Bayside homes often need 200A service upgrades and sewer lateral replacement
  • Steep-slope and bluff overlays cover Grand Ave, Rucker Hill and Mukilteo Blvd corridors
  • Critical Aquifer Recharge Area covers parts of Silver Lake — limits some materials
  • Heritage tree (≥30" DBH) protections require arborist sign-off before site clearing
LOCAL_INCENTIVE

Snohomish County PUD heat-pump and weatherization rebates ($1,200–$2,800) stack with PSE gas-line decommission credits.

CHECKLIST_01 / EVERETT_FEASIBILITY

Everett ADU Permit Checklist

Two-page fillable PDF tuned to Everett, WA — owner & site fields, project intent, and the local site conditions we always pre-screen (R-1 / R-2 / R-3 / R-4). Fill it on any device, email it back, and we'll set up a free 30-minute feasibility call.

  • · Pre-mapped to Everett zoning & 10–14 wk permit window
  • · Editable on Preview, Acrobat, Chrome — no signup
  • · Email back to hello@goldenstateadubuilders.com
FILE / everett-adu-permit-checklist.pdf
Email completed PDF →

Or call (206) 555-0192

Cost to build an ADU in Everett

PRICE_GUIDE

Indicative turn-key ranges for Everett, WA — design, permits, construction and finish carpentry included. Final number depends on lot conditions, finishes and the 10–14 wk Everett permit timeline.

DADU
$325K – $525K

6–8 months · 400–1,000 sqft

DETACHED ADU in Everett
AADU
$185K – $345K

4–5 months · 300–800 sqft

ATTACHED ADU in Everett
Garage
$145K – $235K

3–4 months · 200–600 sqft

GARAGE CONV. in Everett
Additions
$220K – $750K+

Project dependent · Custom

MODERN ADDITIONS in Everett
CLIENT_REPORT
Golden turned a permitting nightmare into a finished, beautiful backyard cottage. They were on schedule every single week, and the fixed-price contract held to the dollar.
Marcus Henderson
Homeowner · Ballard, Seattle · 2023
REF_4492
We interviewed five general contractors. Golden was the only one who walked our lot before quoting. Their structural engineer caught a foundation issue everyone else missed.
Sade Okafor
Owner-Architect · Bellevue · 2023
REF_4376
They converted our garage into a long-term rental that pays our mortgage. Permitted, built, and tenant-ready in 14 weeks — and the finishes look like a custom home.
Jin & Lauren Park
Investor Homeowners · Kirkland · 2024
REF_4218

Everett ADU FAQ

FAQ_05
01

Did Everett actually legalize ADUs in every neighborhood?

Yes. The 2023 EMC 19.04 update permits one or two ADUs per lot in R-1, R-2, R-3 and R-4 zones citywide. Conditional use is no longer required for code-compliant designs.

02

How long does an Everett ADU permit take?

10–14 weeks from intake on a clean submittal. Pre-application meetings (free) are strongly recommended for hillside lots and reduce review cycles by 2–4 weeks.

03

Will my Everett ADU need a separate water meter?

Not always — sub-metering off the existing service is allowed when fixture count stays within service capacity. Most ADU builds use the existing 1" line; we confirm during feasibility.

04

Are there impact fees on a new Everett DADU?

Yes — transportation and parks impact fees apply, typically $7–10K combined. Garage conversions inside the existing footprint are exempt.

05

Is owner-occupancy required?

No, the 2023 update removed owner-occupancy. Both units can be rented separately long-term.

Build in Everett.
Free site walk.

REQUEST CONSULTATION
FAQ

Frequently asked

  • How much does an ADU cost in Everett, WA in 2026?

    Turn-key ADUs in Everett run roughly $295–$465 per square foot all-in for 2026 contracts, depending on lot access, foundation type, and finish package. A 600 sqft one-bedroom DADU typically closes between $215K and $310K including permits, side-sewer connection, and electrical service work. The biggest swing factors in Everett are soils (pier-and-beam adds $18–32K over a slab), required stormwater detention on lots over 2,000 sqft of impervious, and whether a panel upgrade to 200A is needed. Our Everett feasibility report gives you a ±15% number in two weeks for $1,500, credited to the build contract.

  • How long does the ADU permit take in Everett?

    Median Everett ADU permit issuance is currently 8–16 weeks from a clean submittal in 2026, faster on pre-engineered catalog plans. The bottlenecks are almost never the zoning review — they are side-sewer capacity letters, drainage review on lots with steep slopes, and addressing assignments. We pull a pre-application meeting with Everett planning before drawings start, which typically saves one full review cycle (4–6 weeks). RCW 36.70A.681 requires most WA jurisdictions to permit ADUs ministerially when zoning is met, which has trimmed median timelines roughly 30% versus 2022.

  • What size DADU can I build on my Everett lot?

    Under HB 1337 / RCW 36.70A.681, Everett must allow at least one DADU up to 1,000 sqft on any residential lot zoned for single-family, with height to 24 ft and standard 5 ft side/rear setbacks unless local code is more permissive. Many Everett zones allow a second ADU (a stacked DADU or AADU + DADU combo). Your ceiling is usually lot coverage, not the 1,000 sqft cap — once you add the primary house footprint plus the new DADU plus impervious driveway and walks, you frequently hit the lot-coverage ratio before the size cap. Our zoning lookup checks both.

  • Do I need to live on the property to build a Everett ADU?

    No. Owner-occupancy requirements were preempted statewide by RCW 36.70A.681 — Everett cannot impose an owner-occupancy condition on either the primary or accessory unit. That means you can build a DADU and rent both units, build a DADU for a family member while living off-site, or build to sell. Short-term rentals (≤30 days) are still governed by local STR codes, which vary; long-term rentals (30+ days) face no special restriction beyond standard landlord-tenant law (RCW 59.18).

  • Can I subdivide and sell the ADU separately in Everett?

    Yes, in most Everett zones, since the 2023 unit-lot subdivision and condominiumization changes paired with HB 1110 middle-housing reform. The two common pathways are: (1) unit-lot subdivision — carving a new fee-simple lot around the DADU, requires a short plat (~4–6 months) and shared-driveway easements; (2) condominium declaration under RCW 64.34 — faster (~2 months) but lenders sometimes resist financing a 2-unit condo. We model both at feasibility because the right answer depends on your hold-vs-sell horizon and current lender appetite.

  • What is the rental income from a Everett ADU?

    2026 Everett ADU rent comps for a 1-bedroom DADU built to current finish standards land in a wide band depending on submarket — generally $1,950–$3,200/mo for a long-term lease, with mid-term (30–90 day) commanding 10–25% premium. Net operating income after vacancy (5%), management (8%), maintenance reserve (5%), and property tax/insurance increment typically hits 62–70% of gross. At today's construction cost and rent comps the unleveraged cap on a new Everett DADU pencils 4.8–6.4%, with leveraged cash-on-cash 7–11% using a HELOC or renovation loan.

  • Will an ADU raise my Everett property taxes?

    Yes, but predictably. The county assessor adds the marginal improvement value (typically 55–70% of construction cost, not 100%) to your assessed value, and the levy rate applies to that increment under RCW 84.40.0301. For a $270K-cost DADU in Everett, expect roughly $1,900–$3,100/yr of additional property tax depending on your levy code area. The increment is partially offset because King and Pierce County both classify newly created ADUs into a single building-permit assessment cycle, not a full reassessment of the primary house.

  • What's the first step to build an ADU in Everett?

    Start with a paid feasibility study — not a plan set. The feasibility deliverable is a 12–20 page report covering Everett zoning analysis, setbacks and lot-coverage math, water meter sizing, side-sewer capacity, electrical service amperage, critical-areas screening, three layout options, and a ±15% budget. It costs $1,500 and is credited to the construction contract. This step eliminates the two most expensive surprises — an undersized water service and an unmappable side sewer — before you spend $15K+ on full design. Schedule a free 20-minute scoping call to confirm fit.