
Bothell
ADU Builder.
Design-build DADU, AADU, garage conversion & addition contractor — Bothell, WA
Bothell straddles King and Snohomish counties — we pull the right code book based on parcel jurisdiction at feasibility. The downtown Bothell Crossroads district saw a 2023 zoning overhaul that added ADU bonuses inside walking distance of UW Bothell.
R-9,600 / R-20,000 / R-40,000 — ADU + DADU permitted under BMC 12.07
We file in Bothell every month — we know which lot configurations sail through and which need pre-application meetings to avoid corrections.
- ·Downtown
- ·Canyon Park
- ·North Creek
- ·Westhill
- ·Beardslee
- ·Maywood Hill
Building in Bothell
FIELD_NOTESWhat we lean into
- DADU + AADU both permitted on the same lot in most R-zones
- UW Bothell and Cascadia College drive deep long-term rental demand
- Downtown Crossroads bonuses include reduced setbacks and height
- Lower land basis than Bellevue/Kirkland with comparable commute
What we plan around
- Bothell straddles King and Snohomish — code differs by parcel; we verify at feasibility
- North Creek wetlands and salmon-bearing streams trigger 165 ft buffers
- Steep-slope overlays cover Westhill and Beardslee
- Tree retention: 30% in King County portion, 25% in Snohomish County portion
Bothell ADU Permit Checklist
Two-page fillable PDF tuned to Bothell, WA — owner & site fields, project intent, and the local site conditions we always pre-screen (R-9,600 / R-20,000 / R-40,000). Fill it on any device, email it back, and we'll set up a free 30-minute feasibility call.
- · Pre-mapped to Bothell zoning & 10–14 wk permit window
- · Editable on Preview, Acrobat, Chrome — no signup
- · Email back to hello@goldenstateadubuilders.com
What we build in Bothell
SERVICES_AVAILABLEDETACHED ADU
Stand-alone backyard cottages built from the ground up — engineered for rental income, multi-generational living, or your home office.
02 //ATTACHED ADU
Seamlessly integrated additions — basement, ground-floor, or wing conversions that maintain the architectural integrity of your existing home.
03 //GARAGE CONV.
Convert an under-used garage into a high-end studio, office, or rental quarter without surrendering your driveway.
04 //MODERN ADDITIONS
Structural expansions for growing families — second stories, primary suites, kitchen extensions. Steel, glass, and Pacific Northwest materials.
05 //GENERAL CONTRACTING
Full-service general contracting for remodels, renovations, and ground-up custom homes throughout the Puget Sound region.
06 //FEASIBILITY STUDIES
Before you commit, we analyze zoning, lot coverage, setbacks, utilities, and ROI so you have a real number — not a guess.
Cost to build an ADU in Bothell
PRICE_GUIDEIndicative turn-key ranges for Bothell, WA — design, permits, construction and finish carpentry included. Final number depends on lot conditions, finishes and the 10–14 wk Bothell permit timeline.
“Golden turned a permitting nightmare into a finished, beautiful backyard cottage. They were on schedule every single week, and the fixed-price contract held to the dollar.”
“We interviewed five general contractors. Golden was the only one who walked our lot before quoting. Their structural engineer caught a foundation issue everyone else missed.”
“They converted our garage into a long-term rental that pays our mortgage. Permitted, built, and tenant-ready in 14 weeks — and the finishes look like a custom home.”
Bothell ADU FAQ
FAQ_0301How does Bothell handle the King/Snohomish split?
How does Bothell handle the King/Snohomish split?
Code is identical at the city level for ADU permitting, but utility purveyors, school districts and impact fees differ by parcel. We confirm county at feasibility — it changes fees by $2–4K.
02Can I build two ADUs in Bothell?
Can I build two ADUs in Bothell?
Yes — one DADU + one AADU allowed per lot in R-9,600 and larger zones, subject to lot coverage and FAR.
03Is owner-occupancy required?
Is owner-occupancy required?
No — Bothell removed owner-occupancy in 2022.
Build in Bothell.
Free site walk.
REQUEST CONSULTATIONNearby cities we build in
All Golden State services in Bothell
Stand-alone backyard cottages built from the ground up — engineered for rental income, multi-generational living, or your home office.
Seamlessly integrated additions — basement, ground-floor, or wing conversions that maintain the architectural integrity of your existing home.
Convert an under-used garage into a high-end studio, office, or rental quarter without surrendering your driveway.
Structural expansions for growing families — second stories, primary suites, kitchen extensions. Steel, glass, and Pacific Northwest materials.
Full-service general contracting for remodels, renovations, and ground-up custom homes throughout the Puget Sound region.
Before you commit, we analyze zoning, lot coverage, setbacks, utilities, and ROI so you have a real number — not a guess.
Frequently asked
How much does an ADU cost in Bothell, WA in 2026?
Turn-key ADUs in Bothell run roughly $295–$465 per square foot all-in for 2026 contracts, depending on lot access, foundation type, and finish package. A 600 sqft one-bedroom DADU typically closes between $215K and $310K including permits, side-sewer connection, and electrical service work. The biggest swing factors in Bothell are soils (pier-and-beam adds $18–32K over a slab), required stormwater detention on lots over 2,000 sqft of impervious, and whether a panel upgrade to 200A is needed. Our Bothell feasibility report gives you a ±15% number in two weeks for $1,500, credited to the build contract.
How long does the ADU permit take in Bothell?
Median Bothell ADU permit issuance is currently 8–16 weeks from a clean submittal in 2026, faster on pre-engineered catalog plans. The bottlenecks are almost never the zoning review — they are side-sewer capacity letters, drainage review on lots with steep slopes, and addressing assignments. We pull a pre-application meeting with Bothell planning before drawings start, which typically saves one full review cycle (4–6 weeks). RCW 36.70A.681 requires most WA jurisdictions to permit ADUs ministerially when zoning is met, which has trimmed median timelines roughly 30% versus 2022.
What size DADU can I build on my Bothell lot?
Under HB 1337 / RCW 36.70A.681, Bothell must allow at least one DADU up to 1,000 sqft on any residential lot zoned for single-family, with height to 24 ft and standard 5 ft side/rear setbacks unless local code is more permissive. Many Bothell zones allow a second ADU (a stacked DADU or AADU + DADU combo). Your ceiling is usually lot coverage, not the 1,000 sqft cap — once you add the primary house footprint plus the new DADU plus impervious driveway and walks, you frequently hit the lot-coverage ratio before the size cap. Our zoning lookup checks both.
Do I need to live on the property to build a Bothell ADU?
No. Owner-occupancy requirements were preempted statewide by RCW 36.70A.681 — Bothell cannot impose an owner-occupancy condition on either the primary or accessory unit. That means you can build a DADU and rent both units, build a DADU for a family member while living off-site, or build to sell. Short-term rentals (≤30 days) are still governed by local STR codes, which vary; long-term rentals (30+ days) face no special restriction beyond standard landlord-tenant law (RCW 59.18).
Can I subdivide and sell the ADU separately in Bothell?
Yes, in most Bothell zones, since the 2023 unit-lot subdivision and condominiumization changes paired with HB 1110 middle-housing reform. The two common pathways are: (1) unit-lot subdivision — carving a new fee-simple lot around the DADU, requires a short plat (~4–6 months) and shared-driveway easements; (2) condominium declaration under RCW 64.34 — faster (~2 months) but lenders sometimes resist financing a 2-unit condo. We model both at feasibility because the right answer depends on your hold-vs-sell horizon and current lender appetite.
What is the rental income from a Bothell ADU?
2026 Bothell ADU rent comps for a 1-bedroom DADU built to current finish standards land in a wide band depending on submarket — generally $1,950–$3,200/mo for a long-term lease, with mid-term (30–90 day) commanding 10–25% premium. Net operating income after vacancy (5%), management (8%), maintenance reserve (5%), and property tax/insurance increment typically hits 62–70% of gross. At today's construction cost and rent comps the unleveraged cap on a new Bothell DADU pencils 4.8–6.4%, with leveraged cash-on-cash 7–11% using a HELOC or renovation loan.
Will an ADU raise my Bothell property taxes?
Yes, but predictably. The county assessor adds the marginal improvement value (typically 55–70% of construction cost, not 100%) to your assessed value, and the levy rate applies to that increment under RCW 84.40.0301. For a $270K-cost DADU in Bothell, expect roughly $1,900–$3,100/yr of additional property tax depending on your levy code area. The increment is partially offset because King and Pierce County both classify newly created ADUs into a single building-permit assessment cycle, not a full reassessment of the primary house.
What's the first step to build an ADU in Bothell?
Start with a paid feasibility study — not a plan set. The feasibility deliverable is a 12–20 page report covering Bothell zoning analysis, setbacks and lot-coverage math, water meter sizing, side-sewer capacity, electrical service amperage, critical-areas screening, three layout options, and a ±15% budget. It costs $1,500 and is credited to the construction contract. This step eliminates the two most expensive surprises — an undersized water service and an unmappable side sewer — before you spend $15K+ on full design. Schedule a free 20-minute scoping call to confirm fit.