SPEC_C / BOTHELL · AADU · Verified 2026-01-15
Bothell AADU Builders — Attached ADU Permits, Cost & Layout
Bothell straddles King and Snohomish counties and has aligned with HB 1337 in both. An AADU is a self-contained dwelling carved into the existing house — its own entry, its own kitchen, its own bath, with a fire-rated demising wall between units. Bothell permits attached adu (aadu) on most single-family lots under its current code. DADUs on flatter plateau lots, basement conversions in modern subdivisions, and AADUs above garages.
SPEC_C.01 / ZONING — Bothell, King/Snohomish County
Is a aadu allowed in Bothell?
Bothell allows attached ADU (AADU) on single-family lots (up to 1,000 sf), no owner-occupancy requirement, and no off-street parking required near transit.
- Max ADU size
- 1,000 sf (verify against city code)
- Parking
- No off-street parking required within ½-mile of major transit per HB 1337; otherwise city standard parking rules apply.
- Owner-occupancy
- Not required
- Height
- DADU heights per BMC 12; commonly 24 ft.
- Setbacks
- 5 ft side/rear typical for DADUs.
- Lot coverage
- Coverage per BMC zone.
- Minimum lot size
- No explicit ADU minimum lot size under current BMC.
- Tree retention
- Tree-retention per BMC applies above thresholds.
- Critical areas
- North Creek riparian buffers and canyon slope.
- Alley access
- Limited alleys; most lots front-load.
Feasibility blockers to map early
- North Creek stream buffers
- hillside lots above the canyon
- split county jurisdiction
- North Creek riparian buffers and canyon slope.
- Tree-retention per BMC applies above thresholds.
SPEC_C.02 / PERMIT — Bothell Community Development
Bothell aadu permit timeline
Plan review (typical)
8–20 weeks
Bothell Community Development standard ADU intake (via MyBuildingPermit).
With one correction cycle
10–28 weeks
Includes one typical correction cycle.
Permit difficulty
5/10
Higher = more plan-check + design-review friction.
Documents you'll submit
- Site plan with parcel dimensions, structures, setbacks, and tree retention
- Architectural plans (floor plans, elevations, sections)
- Structural plans stamped by a WA-licensed engineer where required
- WSEC energy compliance worksheet
- Stormwater / drainage review per city threshold
- Utility plan (sewer / water / electric)
- Demising-wall and fire-separation detail between primary and accessory units
- Egress plan showing independent entry for the AADU
Common plan-check corrections
- Setback or lot-coverage encroachment on site plan
- Energy-code U-value / glazing percentage mismatch
- Missing structural calcs for shear walls or beams
- Stormwater BMP not selected or sized for the impervious area
- Tree retention plan missing or critical-root-zone fencing not shown
- Fire-separation detail incomplete between units
- Egress missing for the accessory unit
Inspection sequence
- 01Foundation / footing
- 02Underfloor framing & insulation
- 03Rough-in: framing, mechanical, plumbing, electrical
- 04Insulation & vapor barrier
- 05Drywall / wallboard
- 06Final building, plumbing, mechanical, electrical
- 07Certificate of occupancy / final approval
Why Bothell reviews can slow
- North Creek buffers
- hillside geotech
- King vs Snohomish coordination on jurisdiction-split projects
SPEC_C.03 / COST — Bothell cost tier 4/5
Bothell aadu cost range
$175k–$369k · typical $252k
Existing-space conversions sit at the low end; new additions at the high end.
What moves your number
- Demising-wall scope
- Existing structural capacity
- Egress / window scope
- Mechanical separation
Utility & site notes for this city
- PSE coordination standard; modern Bothell subdivisions usually have panel capacity.
- Panel upgrades typically $5–8k when needed.
- Northshore Utility District; side-sewer review required.
- Canyon-edge geotech and crane access add $15–50k on affected parcels.
Ranges reflect typical 2026 project budgets and exclude land. Your exact cost depends on site access, foundation, utility upgrades, finish level, and city review depth — confirm with a feasibility study before committing.
SPEC_C.04 / TIMELINE — typical end-to-end ~60 weeks
Bothell aadu schedule, phase by phase
- 01FeasibilityParcel + zoning + utility verification.1–4 weeks
- 02DesignSchematic → permit-ready set.4–12 weeks
- 03EngineeringStructural runs in parallel with design.2–6 weeks
- 04Permit reviewBothell Community Development standard ADU intake (via MyBuildingPermit).8–20 weeks
- 05Corrections & resubmittalCycle depends on correction depth.2–8 weeks
- 06ConstructionDetached scope; conversions sit at the lower end.18–38 weeks
- 07Final sign-offFinal inspections and certificate of occupancy.1–4 weeks
Bothell-specific delay risks · North Creek buffers · hillside geotech · King vs Snohomish coordination on jurisdiction-split projects
Weather note · Excavation, foundations, and exterior weatherization sequence best Apr–Oct; framing and finishes continue year-round under temporary weather protection.
SPEC_C.05 / COMPARE — AADU vs the other ADU types in Bothell
Why pick a aadu over the alternatives in Bothell?
| vs. | Cost | Speed | Privacy | Resale | Best when |
|---|---|---|---|---|---|
| DADU | Lower — reused shell. | Faster — less new structure. | Lower — shared wall. | Slightly less separation; still a permitted second dwelling. | Lot is tight or the main house already has separate-entry potential. |
| Garage Conversion | Similar — depends on existing-conditions scope. | Similar — both reuse a shell. | Better — usually inside the main house, separate entry. | Higher — counts as living area in the main house. | Existing house has unused basement or side wing. |
| Basement ADU | Slightly higher — AADU often touches more of the main envelope. | Similar. | Comparable. | Comparable. | You want a side or upper-level unit, not just a basement. |
SPEC_C.06 / FIT — Is a aadu right for your Bothell lot?
Best-fit profile for a Bothell aadu
Pick an AADU when the existing house has the structural capacity, separate-entry potential, and ceiling height to absorb a second unit. Avoid it when reusing the existing envelope would compromise fire separation, egress, or sound transmission below code.
- Rental income
- Strong for long-term rental, especially when the primary unit will be owner-occupied — shared envelope keeps operating costs low.
- Aging parents / multigen
- Excellent — proximity inside the same building, no weather exposure between units, easier caregiving access.
- Tight lot
- Best of the four on a tight lot — no new footprint, no new setbacks to fight.
- Alley access
- Less relevant — AADU entries usually face the street or side yard, not the alley.
- Lower budget
- Lower baseline than DADU — reused envelope, reused roof, reused foundation.
- Privacy
- Lower than DADU — shared wall, sometimes shared mechanical chase or service entry.
- Speed to occupancy
- Faster than DADU — less weather exposure, less framing, no roofing scope.
- Utilities already nearby
- Strong fit — typically extends existing service rather than running new lines.
SPEC_C.07 / SOURCES — verified .gov / city / state references
Official sources for Bothell ADU rules
- Bothell Community DevelopmentPermit authority for Bothell ADUs.
- Bothell ADU infoCity landing page — confirm current ADU path on visit.
- MyBuildingPermit.comPermit intake for Bothell.
- RCW 36.70A.681 — Accessory Dwelling UnitsState law setting the floor for ADU regulations cities must meet.
- HB 1337 (2023) — Bill textAuthoritative text of the 2023 ADU reform: two ADUs per lot, 1,000 sf min, no owner-occupancy, parking limits near transit.
- WA Department of Commerce — ADU resourcesState guidance and model code for cities implementing HB 1337.
- WA State Energy Code (Residential)ADUs must meet WSEC; the residential provisions drive insulation, glazing, and HVAC requirements.
Bothell AADU FAQ
Does Bothell allow two ADUs per lot?
Yes — under HB 1337 alignment in both King and Snohomish portions of the city.
Is owner-occupancy required in Bothell?
No. The requirement was removed to align with state law.
Which county handles my Bothell ADU permit?
Bothell handles the permit citywide regardless of county; some downstream tax and utility rules differ by county.
How long does Bothell ADU permit review take?
Standard ADU reviews run 8–20 weeks.
Do I need a separate electrical meter for an AADU?
Not in most Puget Sound cities. A single meter is acceptable as long as the panel has capacity, the AADU has dedicated branch circuits, and any required sub-panel is sized correctly. Separate meters are usually only required if you plan to bill the AADU tenant for utilities directly.
How thick does the demising wall have to be?
Most plan reviewers require a 1-hour fire-rated separation between dwelling units, with STC 50 sound transmission. The exact assembly depends on the existing wall — UL-listed assemblies and city-approved alternatives are both accepted, but the listing must be on the drawings.
Go deeper: Read the Eastside deck cost & permits: cedar, IPE, composite (2026) guide
Can the AADU share an entry with the main house?
Most cities require a separate, independent entry for the AADU at grade. A shared vestibule with two interior doors is sometimes acceptable, but a shared interior hallway usually is not.
Go deeper: Read the DADU vs AADU in Puget Sound: which to build (2026) guide
Does an AADU need its own HVAC?
Each dwelling unit must have an independent temperature-control source. A dedicated mini-split or fan-coil for the AADU is the common solution — central forced-air shared across both units is generally not allowed under the current Washington Energy Code.
Other ADU types in Bothell
SPEC_C.08 / NEXT
Plan your Bothell aadu the right way
A 45-minute feasibility call confirms zoning, utility, and budget reality before you spend on design. Golden State ADU has been licensed in Washington since 2012 (LIC SEATTI*752N6).