Skip to main content

SPEC_C / BOTHELL · DADU · Verified 2026-01-15

Bothell DADU Builders — Detached ADU Cost, Permits & Timeline

Bothell straddles King and Snohomish counties and has aligned with HB 1337 in both. A DADU is a standalone backyard cottage on the same lot as the main house — separate roof, separate entry, full kitchen and bath. Bothell permits detached adu (dadu) on most single-family lots under its current code. DADUs on flatter plateau lots, basement conversions in modern subdivisions, and AADUs above garages.

SPEC_C.01 / ZONING — Bothell, King/Snohomish County

Is a dadu allowed in Bothell?

Bothell allows detached ADU (DADU) on single-family lots (up to 1,000 sf), no owner-occupancy requirement, and no off-street parking required near transit.

Max ADU size
1,000 sf (verify against city code)
Parking
No off-street parking required within ½-mile of major transit per HB 1337; otherwise city standard parking rules apply.
Owner-occupancy
Not required
Height
DADU heights per BMC 12; commonly 24 ft.
Setbacks
5 ft side/rear typical for DADUs.
Lot coverage
Coverage per BMC zone.
Minimum lot size
No explicit ADU minimum lot size under current BMC.
Tree retention
Tree-retention per BMC applies above thresholds.
Critical areas
North Creek riparian buffers and canyon slope.
Alley access
Limited alleys; most lots front-load.

Feasibility blockers to map early

  • North Creek stream buffers
  • hillside lots above the canyon
  • split county jurisdiction
  • North Creek riparian buffers and canyon slope.
  • Tree-retention per BMC applies above thresholds.

SPEC_C.02 / PERMIT — Bothell Community Development

Bothell dadu permit timeline

Plan review (typical)

8–20 weeks

Bothell Community Development standard ADU intake (via MyBuildingPermit).

With one correction cycle

10–28 weeks

Includes one typical correction cycle.

Permit difficulty

5/10

Higher = more plan-check + design-review friction.

Documents you'll submit

  • Site plan with parcel dimensions, structures, setbacks, and tree retention
  • Architectural plans (floor plans, elevations, sections)
  • Structural plans stamped by a WA-licensed engineer where required
  • WSEC energy compliance worksheet
  • Stormwater / drainage review per city threshold
  • Utility plan (sewer / water / electric)
  • DADU site plan showing separation from primary structure and any easements
  • Independent utility connections (sewer, water, electric) or shared-service detail

Common plan-check corrections

  • Setback or lot-coverage encroachment on site plan
  • Energy-code U-value / glazing percentage mismatch
  • Missing structural calcs for shear walls or beams
  • Stormwater BMP not selected or sized for the impervious area
  • Tree retention plan missing or critical-root-zone fencing not shown
  • Setback or coverage error on detached structure
  • Stormwater BMP missing for added impervious

Inspection sequence

  1. 01Foundation / footing
  2. 02Underfloor framing & insulation
  3. 03Rough-in: framing, mechanical, plumbing, electrical
  4. 04Insulation & vapor barrier
  5. 05Drywall / wallboard
  6. 06Final building, plumbing, mechanical, electrical
  7. 07Certificate of occupancy / final approval

Why Bothell reviews can slow

  • North Creek buffers
  • hillside geotech
  • King vs Snohomish coordination on jurisdiction-split projects

SPEC_C.03 / COST — Bothell cost tier 4/5

Bothell dadu cost range

$272k–$504k · typical $369k

Drivers: site access, foundation, utility upgrades, and finish level.

What moves your number

  • Foundation type (slab vs stepped)
  • Crane / site access
  • Sewer routing length
  • Finish level

Utility & site notes for this city

  • PSE coordination standard; modern Bothell subdivisions usually have panel capacity.
  • Panel upgrades typically $5–8k when needed.
  • Northshore Utility District; side-sewer review required.
  • Canyon-edge geotech and crane access add $15–50k on affected parcels.

Ranges reflect typical 2026 project budgets and exclude land. Your exact cost depends on site access, foundation, utility upgrades, finish level, and city review depth — confirm with a feasibility study before committing.

SPEC_C.04 / TIMELINE — typical end-to-end ~60 weeks

Bothell dadu schedule, phase by phase

  1. 01FeasibilityParcel + zoning + utility verification.14 weeks
  2. 02DesignSchematic → permit-ready set.412 weeks
  3. 03EngineeringStructural runs in parallel with design.26 weeks
  4. 04Permit reviewBothell Community Development standard ADU intake (via MyBuildingPermit).820 weeks
  5. 05Corrections & resubmittalCycle depends on correction depth.28 weeks
  6. 06ConstructionDetached scope; conversions sit at the lower end.1838 weeks
  7. 07Final sign-offFinal inspections and certificate of occupancy.14 weeks

Bothell-specific delay risks · North Creek buffers · hillside geotech · King vs Snohomish coordination on jurisdiction-split projects

Weather note · Excavation, foundations, and exterior weatherization sequence best Apr–Oct; framing and finishes continue year-round under temporary weather protection.

SPEC_C.05 / COMPARE — DADU vs the other ADU types in Bothell

Why pick a dadu over the alternatives in Bothell?

vs.CostSpeedPrivacyResaleBest when
AADUHigher — full new foundation + envelope.Slower — ground-up build.Better — no shared walls.Strongest resale separation.Backyard space + alley/side access available.
Garage ConversionHigher — no reused shell.Slower — full new structure.Better — siting flexibility.Higher — true second dwelling.Lot can absorb a new footprint.
Basement ADUHigher — no reused shell.Slower — full new structure.Much better — separate building.Higher — visible second unit.You want a true backyard cottage, not a downstairs unit.

SPEC_C.06 / FIT — Is a dadu right for your Bothell lot?

Best-fit profile for a Bothell dadu

Pick a DADU when privacy, long-term rentability, and resale value matter more than speed or lowest cost. Avoid it on very tight lots, lots with deep critical-area buffers, or sites with no alley access and a long sewer run.

Rental income
Strongest of the four for long-term rental income — full privacy, full appliance set, dedicated yard space and parking when allowed.
Aging parents / multigen
Excellent for aging parents who want independence with proximity — single-level layouts with no shared walls or stairs.
Tight lot
Hardest of the four on a tight lot — DADU footprint plus required setbacks and tree retention can consume most rear-yard space.
Alley access
Ideal when alley access exists — separate guest entry, easier construction staging, and cleaner utility tie-ins.
Lower budget
Highest baseline budget of the four — foundation, framing, roof, siding, and full MEP are all new.
Privacy
Best privacy of all four — no shared walls, no shared entry, no shared mechanical chase.
Speed to occupancy
Slowest of the four — full ground-up build, full inspection sequence, full weather exposure during framing.
Utilities already nearby
Sewer routing length and side-sewer condition drive a meaningful share of the budget.
FAQ

Bothell DADU FAQ

  • Are North Creek buffers a problem for ADUs?

    Parcels within the mapped buffer require setback compliance and may need water-quality stormwater treatment.

    Go deeper: Read the Puget Sound ADU timeline guide: kickoff to keys guide

  • How big can my Bothell DADU be?

    Up to 1,000 sf of gross floor area.

    Go deeper: Bothell ADU overview

  • Do I need a separate sewer line for a DADU?

    Not always. Most Puget Sound cities allow a shared side-sewer with a cleanout and an as-built that proves capacity. A separate line is required only when the existing line is undersized, in failing condition, or the city explicitly demands one.

  • Can I rent the DADU short-term?

    Short-term rental rules are city-specific and change. Seattle, Bellevue, Tacoma and most Tier-1 cities allow long-term rentals; short-term (STR) usually requires a separate license, an owner-occupancy attestation, or both. Confirm with the city before underwriting an STR pro forma.

    Go deeper: Glossary: STR (Short-Term Rental)

  • How big can a DADU be in Washington?

    HB 1337 sets a statewide floor of at least 1,000 sq ft of allowed gross floor area for an ADU. Individual cities may allow more (Seattle and Bellevue both go above 1,000 sf on many lots), but the city's specific max controls — always verify against the linked municipal code.

    Go deeper: Read the DADU vs AADU in Puget Sound: which to build (2026) guide

  • What kind of foundation does a DADU need?

    A stem-wall foundation on continuous footings is most common in the Puget Sound, with stepped foundations on sloped sites. Pin or pier foundations are sometimes used on tree-protection lots to limit critical-root-zone disturbance, but they require engineering.

    Go deeper: Read the Foundation inspection checklist for Puget Sound homes guide

SPEC_C.08 / NEXT

Plan your Bothell dadu the right way

A 45-minute feasibility call confirms zoning, utility, and budget reality before you spend on design. Golden State ADU has been licensed in Washington since 2012 (LIC SEATTI*752N6).

CITY_DOSSIER / BOTHELL· 47.7623°N 122.2054°W

Built in Bothell — what we know that the spec sheet won't tell you.

A live dossier from our field PMs: the permit counter, the soils, the bylaw that just changed, and the streets where ADUs are already cash-flowing.

Map · King & Snohomish CountiesOpen ↗
Bothell
Drive-time from yard · ≈ 24 min via I-405© OpenStreetMap contributors
Population48,915
Median lot7,900 sq ft
ADU permits / yr47 (2024)
Build cost band$330–370 / sq ft
Right now in Bothell
Air quality · US AQI
Source · Google Maps PlatformAffects pour windows + finish schedule
LIVE_INTEL / BOTHELL · 6 SIGNALS
Pour-feasibility · todayLoading
/ 100 · Awaiting feed
  • Weather feed loading
Derived live · Bothell weather + AQI
Sun rhythm · BothellDaylight
5:12 AM
9:06 PM
15h 55m daylight
Golden hour · 8:18 PM
99% of June peak
NOAA solar formulas · computed
Moon · cure-week planner
Loading

We track lunar weeks for slab pours — clear nights drop ambient temperature faster, which slows surface curing. Schedule wet slabs midweek under waxing light.

Conway approx · computed
Seismic · 24h within 60 miLoading
USGS earthquake.usgs.gov
On-site clock · Bothell
—:—
· Pacific

Loading. Our standard crew window is 7:00–17:00 weekdays — noise ordinances in most Puget Sound cities allow exterior power tools only inside that band.

America/Los_Angeles · live
Build-rules pulseWithin window
7:00–17:00
Power-tool window · Mon–Fri
ADU permits YTD pace

Sunday exterior work is restricted in most Puget Sound jurisdictions. We sequence interior trades around it.

Bothell municipal code · annualized
SPEC_02 / CITY_INTEL

Environmental & locational intelligence

03 / SOLAR_POTENTIAL

Rooftop solar at this address

04 / POLLEN_FORECAST

Tree · Grass · Weed (3-day)

05 / WALK_SCORE

0.5-mile amenity density

06 / NWS_ALERTS

Active NWS weather alerts

LOCATIONAL_INTEL / BOTHELL
Drive times from BothellLoading

Calculating live drive times to four metro anchors…

Real commute time matters for ADU rent comps — and for our crews. We keep installs within a 60-minute radius of our Puget Sound yard.

Data provenance

Drive times pulled live from the Google Routes API (traffic-aware matrix). Each request is timestamped so you can see exactly when the numbers were last refreshed — no stale brochure data.

Google Routes API · traffic-aware
Street view · BothellLive imagery
Recent Google Street View imagery centered near Bothell

Lot context matters as much as zoning. We pre-screen access, slope, and tree canopy from imagery before scheduling the site visit.

Google Street View · proxied
Tidal window · BothellLoading

Waterfront lots: shoreline excavation and barge access windows depend on these. We schedule pours away from extreme low tides when the soils dry unevenly.

NOAA · — mi away
Recent permits · BothellLoading

Open-data signal of nearby construction velocity — useful for ADU comps and for anticipating examiner workload.

data.seattle.gov · ~3 mi radius
Permit counter · Bothell
Bothell Community Development
9654 NE 182nd St, Bothell 98011
Mon–Fri 8a–5p · in-person intake limited
Local zoning quirk

Lots straddle King & Snohomish lines — fees and tree code differ across the county line on the same street.

Sourced from Golden State ADU field PMs · WA Lic. SEATTI*752N6
Best build window
Late April → October

Bar shows pour-friendly months · dot marks the current month.

  • Seismic
    SDC D · north of Seattle Fault, lower direct exposure
  • Soil
    Till uplands; peat near the Sammamish River
  • Climate
    ≈39″ rain · convergence zone catches stacked showers
  • Topography
    Plateau flat; canyon edges near North Creek steep
  • HOA prevalence
    ≈ 22%
Transit signal
ST Express 522 + planned Stride S3 BRT (2028)

Station-area lots earn the largest rent premium in this market.

School signal
Northshore School District

Rental yield estimate: $2,500–3,200 / mo · UW Bothell demand drives small DADUs

Local incentive

Northshore housing-stability ADU rental incentive (10-yr lease commit)

Hidden gem

UW Bothell-adjacent DADUs lease faster than any other student-housing alt nearby.

Build cost · Bothell vs Puget Sound
+$25 vs regional median
$250 / sqftBothell$350$425 / sqft
Other cities we hold a permit history in
BOTHELL / BUILD

Building an ADU in Bothell? Get a real number on your lot — free.

Bothell is one of our top markets. We'll send a Bothell-specific feasibility brief (zoning, fees, soils, timeline) for your address within 48h.

  • Bothell permit + fee schedule for 2026
  • Lot-specific zoning + setback diagram
  • Free 2-page PDF within 48h
Replies within 1 business day
WA Lic. SEATTI*752N6Building since 2012

Bothell owners are 1 of every 3 ADUs we delivered in 2026.

Direct line · Golden State ADU(425) 642-4142

We reply within 1 business day. No spam, ever.

◇ No sales script · No spam · Your details stay with Leo