Skip to main content
DATASET / BOTHELL ZONING

Bothell ADU Zoning Codes

Every residential zoning code in Bothell, WA that permits a detached (DADU) or attached (AADU) accessory dwelling unit. Setbacks, height limits, and size caps measured against the current municipal code.

Last updated 2026-05-15

We're verifying Bothell's zoning data this quarter. Contact us for the current code applied to your specific lot.

FAQ

Frequently asked

  • How much does an ADU cost in Bothell, WA in 2026?

    Turn-key ADUs in Bothell run $300–$400 per square foot all-in for 2026 contracts. A 600 sqft one-bedroom DADU typically closes between $180K and $240K including permits, side-sewer connection, and electrical service work. Cost swing factors in Bothell: soils (pier-and-beam adds $18–32K over a slab), required stormwater detention on lots over 2,000 sqft of impervious, and whether a panel upgrade to 200A is needed. Our Bothell feasibility report gives you a ±15% number in two weeks for $1,500, credited to the build contract.

    Go deeper: Bothell ADU overview

  • How long does the ADU permit take in Bothell?

    Median Bothell ADU permit issuance is currently 8–16 weeks from a clean submittal in 2026, faster on pre-engineered catalog plans. The bottlenecks are almost never zoning — they are side-sewer capacity letters, drainage review on lots with steep slopes, and addressing. We pull a pre-application meeting with Bothell planning before drawings start, which typically saves one full review cycle (4–6 weeks). RCW 36.70A.681 requires WA jurisdictions to permit ADUs ministerially when zoning is met, which has trimmed median timelines roughly 30% versus 2022.

    Go deeper: Bothell ADU permit timeline

  • What size DADU can I build on my Bothell lot?

    Under HB 1337 / RCW 36.70A.681, Bothell must allow at least one DADU up to 1,000 sqft on any residential lot zoned for single-family, with height to 24 ft and standard 5 ft side/rear setbacks unless local code is more permissive. Many Bothell zones allow a second ADU (stacked DADU or AADU + DADU). Your ceiling is usually lot coverage, not the 1,000 sqft cap — primary footprint + DADU + impervious drive often hits the coverage ratio first. Our zoning lookup checks both.

    Go deeper: Bothell ADU overview

  • Do I need to live on the property to build a Bothell ADU?

    No. Owner-occupancy requirements were preempted statewide by RCW 36.70A.681 — Bothell cannot impose an owner-occupancy condition on either unit. You can build a DADU and rent both units, build for a family member while living off-site, or build to sell. Short-term rentals (≤30 days) are still governed by local STR codes; long-term rentals (30+ days) face no special restriction beyond standard landlord-tenant law (RCW 59.18).

    Go deeper: Bothell ADU overview

  • Can I subdivide and sell the ADU separately in Bothell?

    Yes, in most Bothell zones, since the 2023 unit-lot subdivision and condominiumization changes paired with HB 1110. Two pathways: (1) unit-lot subdivision — carving a fee-simple lot around the DADU, requires a short plat (~4–6 months) and shared-driveway easements; (2) condominium declaration under RCW 64.34 — faster (~2 months) but lenders sometimes resist a 2-unit condo. We model both at feasibility because the right answer depends on hold-vs-sell horizon and current lender appetite.

    Go deeper: Bothell ADU overview

  • What rental income will a Bothell ADU generate?

    2026 Bothell comps for a 1-bedroom DADU built to current finish standards land $1,950–$3,200/mo long-term, with mid-term (30–90 day) 10–25% higher. Net operating income after vacancy (5%), management (8%), maintenance reserve (5%), and property tax/insurance increment typically hits 62–70% of gross. At today's construction cost and rent comps the unleveraged cap on a new Bothell DADU pencils 4.8–6.4%, with leveraged cash-on-cash 7–11% using a HELOC or renovation loan.

    Go deeper: Bothell ADU overview

  • Will an ADU raise my Bothell property taxes?

    Yes, but predictably. The county assessor adds the marginal improvement value (typically 55–70% of construction cost, not 100%) to your assessed value, and the levy rate applies to that increment under RCW 84.40.0301. For a $210K-cost DADU in Bothell, expect roughly $1,900–$3,100/yr of additional property tax depending on your levy code area. The primary residence assessment is not reopened — only the new improvement is added.

    Go deeper: Bothell ADU overview

  • What's the first step to build an ADU in Bothell?

    Start with a paid feasibility study — not a plan set. The 12–20 page report covers Bothell zoning analysis, setbacks and lot-coverage math, water meter sizing, side-sewer capacity, electrical service amperage, critical-areas screening, three layout options, and a ±15% budget. $1,500, credited to the build contract. This step eliminates the two most expensive surprises — undersized water service and an unmappable side sewer — before you spend $15K+ on full design.

    Go deeper: Bothell ADU overview

  • Can I build a basement ADU in Bothell?

    Yes when ceiling height, light/ventilation, and emergency egress meet IRC R310. Bothell basements that fall short on ceiling (need 7'-0" min, 6'-8" at beams) or egress window opening (5.7 sqft net clear, 24" high, 20" wide, sill ≤44" AFF) typically need underpinning or window-well excavation. Cost band on a clean Bothell basement conversion is $145–$220K including new full bath, kitchenette, separate exterior entry, fire separation, and dedicated panel feeder.

    Go deeper: Bothell ADU overview

  • What financing works for a Bothell ADU in 2026?

    Five common Bothell structures: (1) HELOC against the primary, fastest, 8.0–9.5% APR, no separate appraisal; (2) renovation loan (Fannie HomeStyle / Freddie CHOICERenovation), single-close, uses after-built value, 7.1–7.9%; (3) cash-out refi, only if existing mortgage is above market; (4) construction-to-perm, best for ground-up DADUs with 12-month draw; (5) WSHFC ADU pilot at ~3.5–4.25% for owner-occupants ≤120% AMI. We coordinate with five Bothell-area credit unions and three banks with ADU-experienced underwriters.

    Go deeper: Bothell ADU overview

  • Do I need a sprinkler system for my Bothell ADU?

    Usually no. Per IRC R313 and WA state amendments, single-family dwellings and ADUs under 5,000 sqft of fire-flow calculation area generally do not require residential sprinklers in Bothell. Triggers that flip the answer: total combined floor area of primary + ADU exceeding 5,000 sqft, structures over three stories above grade, lots beyond fire-flow distance, or specific local fire-marshal interpretations on shared-wall AADU configurations. Verified at feasibility against the Bothell fire marshal's current rule sheet.

    Go deeper: Bothell ADU overview

  • Can I use my Bothell ADU as a short-term rental?

    Sometimes. WA preemption under RCW 36.70A.681 forces Bothell to allow ADUs but does not preempt short-term-rental ordinances. Some Puget Sound jurisdictions require owner-occupancy on at least one unit for STR, cap STR nights per year, or require a separate STR permit and lodging-tax registration with WA DOR. Long-term (30+ day) rentals always work. Check our Bothell-specific STR rules before underwriting any STR-dependent pro forma.

    Go deeper: Bothell ADU overview

  • What permits do I need to build an ADU in Bothell?

    Standard Bothell ADU permit stack: building permit (covers structural, mechanical, plumbing under combined review), side-sewer permit (separate, issued by Bothell utilities), water meter capacity check (may trigger upsize fee), electrical permit (issued by L&I in most Bothell unincorporated areas, by the city in Bothell proper), and where applicable: drainage review, addressing, demolition, right-of-way for utility cut. We pull all permits on your behalf and itemize fees as a pass-through, not a markup.

    Go deeper: Bothell ADU overview

  • How tall can my Bothell DADU be?

    Most Bothell zones now allow 24 ft to midpoint of roof for DADUs under HB 1337, with some pre-existing zones permitting up to 30 ft on larger lots. Height is measured from existing grade or ABE (Average Building Elevation), and roof overhangs typically don't count. Two-story DADUs at 22–24 ft midpoint generally fit single-family neighborhoods without bulk objections, while clearing the head-height needed for a code stair and 8 ft upper-floor ceilings.

    Go deeper: Bothell ADU overview

  • Do I need parking for my Bothell ADU?

    No new parking is required under RCW 36.70A.681 for ADUs within ½ mile of a major transit stop or in lots ≤4,000 sqft, and Bothell's implementing code largely preserves that exemption citywide. For lots outside that band, Bothell may require one off-street stall per ADU. Tandem parking on the existing driveway typically qualifies, which means most Bothell lots add a DADU without adding new pavement.

    Go deeper: Bothell ADU overview

  • Can I build an ADU in a Bothell HOA?

    Sometimes. RCW 64.38.034 (effective 2024) prohibits Bothell HOAs from banning ADUs outright on lots zoned for single-family, but HOAs may impose design covenants — siding material, roof pitch, façade articulation. We've built in Bothell HOAs by submitting design concepts to the architectural review board in parallel with permit submittal, which keeps the schedule intact. Add 4–8 weeks for ARB review on top of city permit time.

    Go deeper: Bothell ADU overview

  • What's the cheapest way to add an ADU in Bothell?

    Garage conversion on an existing slab, kitchen on the existing plumbing wall, no electrical service upgrade, no critical-areas review. Real-world floor for a clean Bothell conversion is $185–$235K in 2026 dollars. Below that price point you are usually looking at an unpermitted job that will not refinance, insure, or transfer at sale. The price assumes IRC R310 egress is achievable without major exterior wall surgery.

    Go deeper: Bothell ADU overview

  • Do I need a drainage report for my Bothell ADU?

    Triggered when new + replaced impervious surface exceeds the Bothell threshold (commonly 2,000 sqft in King County / 5,000 sqft of land disturbance). Most 600 sqft DADUs with a permeable walkway stay under. Lots over the threshold need a drainage report by a WA-licensed civil engineer and may need detention — vault or rain garden — adding $8–22K. Site planning around impervious is the cheapest fix; we model it during feasibility.

    Go deeper: Bothell ADU overview

  • Will my Bothell ADU need an energy code upgrade?

    Yes — every new ADU in Bothell is permitted to the current 2021 WSEC residential energy code (IECC R406 path 1, 2, or 3 with WA amendments). Typical compliance package: R-21 walls (R-23 effective with continuous), R-49 attic, U-0.28 windows, sealed combustion or heat-pump HVAC, ERV/HRV for IAQ, and blower-door test ≤3 ACH50. The energy package adds roughly $8–14K versus 2018 code; required regardless of finish tier.

    Go deeper: Bothell ADU overview

  • Can I add a second ADU on my Bothell lot?

    Often yes. HB 1337 requires Bothell to allow two ADUs on lots zoned for single-family in jurisdictions over 25,000 population, configured as DADU + AADU, two AADUs, or a stacked two-unit DADU. Some Bothell zones restrict to one ADU + JADU. Combined floor area cap is typically 2,000 sqft for both ADUs combined. We map your specific zone's ADU count at feasibility — answer depends on the parcel's zone designation, not citywide rules.

    Go deeper: Bothell ADU overview

  • What's the difference between a DADU and AADU in Bothell?

    A DADU (detached) is a freestanding structure separated from the primary house by at least 5 ft. An AADU (attached) shares at least one wall with the primary, typically as an addition or interior conversion with a separate entrance. Bothell treats both under the same RCW 36.70A.681 preemption — same size cap (up to 1,000 sqft), same setback relief, same parking exemption. Cost differs: DADUs cost ~12–18% more per sqft because they need a complete envelope; AADUs share existing walls and roof.

    Go deeper: Bothell ADU overview

  • Do I need a survey for my Bothell ADU?

    Recommended in nearly every case. Bothell reviewers require precise setback measurements from property lines, not from the curb or fence. A recent boundary survey (BLA-compliant, sealed by a WA-licensed surveyor) costs $1,200–$2,800 and locks the setback math. The exception: lots with a recent (≤5 year) recorded survey that has not been disturbed by fence or grading work. We include survey coordination in feasibility deliverables.

    Go deeper: Bothell ADU overview

  • How do utility hookups work for a Bothell ADU?

    Three utility paths in Bothell: (1) water — extend from the existing meter if size supports flow demand; otherwise upsize meter ($3,500–$11,000 capacity fee); (2) sewer — separate side-sewer tap from main, or shared connection with cleanout, requires Bothell utilities permit ($1,800–$4,400); (3) electrical — sub-feeder from primary panel if capacity allows, otherwise 200A service upgrade ($4,800–$9,200). Gas is optional and depends on cooktop/water-heater choice. We submit all utility paperwork in parallel with the building permit.

    Go deeper: Bothell ADU overview

  • Will my Bothell ADU need fire separation from the primary house?

    When wall-to-wall separation is less than 5 ft, IRC R302 requires 1-hour fire-rated assemblies on both exterior walls facing each other (5/8" Type X gypsum, no openings), and at separation less than 3 ft a 1-hour fire-rated assembly with sprinklers may be required by Bothell fire marshal. Detached DADUs at 5 ft+ separation typically need no special fire rating — standard envelope assemblies satisfy code.

    Go deeper: Bothell ADU overview

  • Can I sell my Bothell ADU as a condo unit?

    Yes via condominium declaration under RCW 64.34, typically faster than unit-lot subdivision (~2 months vs 4–6) but with lender constraints — many residential lenders require a minimum 3-unit condo for conventional financing, so a 2-unit condo can limit buyer pool. Portfolio lenders and non-QM lenders work with 2-unit condos. We refer clients to a WA real-estate attorney to draft the declaration and CC&Rs; budget $4,800–$8,500 for legal.

    Go deeper: Bothell ADU overview

CITY_DOSSIER / BOTHELL· 47.7623°N 122.2054°W

Built in Bothell — what we know that the spec sheet won't tell you.

A live dossier from our field PMs: the permit counter, the soils, the bylaw that just changed, and the streets where ADUs are already cash-flowing.

Map · King & Snohomish CountiesOpen ↗
Bothell
Drive-time from yard · ≈ 24 min via I-405© OpenStreetMap contributors
Population48,915
Median lot7,900 sq ft
ADU permits / yr47 (2024)
Build cost band$330–370 / sq ft
Right now in Bothell
Air quality · US AQI
Source · Google Maps PlatformAffects pour windows + finish schedule
LIVE_INTEL / BOTHELL · 6 SIGNALS
Pour-feasibility · todayLoading
/ 100 · Awaiting feed
  • Weather feed loading
Derived live · Bothell weather + AQI
Sun rhythm · BothellDaylight
5:25 AM
9:06 PM
15h 41m daylight
Golden hour · 8:19 PM
98% of June peak
NOAA solar formulas · computed
Moon · cure-week planner
Loading

We track lunar weeks for slab pours — clear nights drop ambient temperature faster, which slows surface curing. Schedule wet slabs midweek under waxing light.

Conway approx · computed
Seismic · 24h within 60 miLoading
USGS earthquake.usgs.gov
On-site clock · Bothell
—:—
· Pacific

Loading. Our standard crew window is 7:00–17:00 weekdays — noise ordinances in most Puget Sound cities allow exterior power tools only inside that band.

America/Los_Angeles · live
Build-rules pulseWithin window
7:00–17:00
Power-tool window · Mon–Fri
ADU permits YTD pace

Sunday exterior work is restricted in most Puget Sound jurisdictions. We sequence interior trades around it.

Bothell municipal code · annualized
SPEC_02 / CITY_INTEL

Environmental & locational intelligence

03 / SOLAR_POTENTIAL

Rooftop solar at this address

04 / POLLEN_FORECAST

Tree · Grass · Weed (3-day)

05 / WALK_SCORE

0.5-mile amenity density

06 / NWS_ALERTS

Active NWS weather alerts

LOCATIONAL_INTEL / BOTHELL
Drive times from BothellLoading

Calculating live drive times to four metro anchors…

Real commute time matters for ADU rent comps — and for our crews. We keep installs within a 60-minute radius of our Puget Sound yard.

Data provenance

Drive times pulled live from the Google Routes API (traffic-aware matrix). Each request is timestamped so you can see exactly when the numbers were last refreshed — no stale brochure data.

Google Routes API · traffic-aware
Street view · BothellLive imagery
Recent Google Street View imagery centered near Bothell

Lot context matters as much as zoning. We pre-screen access, slope, and tree canopy from imagery before scheduling the site visit.

Google Street View · proxied
Tidal window · BothellLoading

Waterfront lots: shoreline excavation and barge access windows depend on these. We schedule pours away from extreme low tides when the soils dry unevenly.

NOAA · — mi away
Recent permits · BothellLoading

Open-data signal of nearby construction velocity — useful for ADU comps and for anticipating examiner workload.

data.seattle.gov · ~3 mi radius
Permit counter · Bothell
Bothell Community Development
9654 NE 182nd St, Bothell 98011
Mon–Fri 8a–5p · in-person intake limited
Local zoning quirk

Lots straddle King & Snohomish lines — fees and tree code differ across the county line on the same street.

Sourced from Golden State ADU field PMs · WA Lic. GOLDESA747LZ
Best build window
Late April → October

Bar shows pour-friendly months · dot marks the current month.

  • Seismic
    SDC D · north of Seattle Fault, lower direct exposure
  • Soil
    Till uplands; peat near the Sammamish River
  • Climate
    ≈39″ rain · convergence zone catches stacked showers
  • Topography
    Plateau flat; canyon edges near North Creek steep
  • HOA prevalence
    ≈ 22%
Transit signal
ST Express 522 + planned Stride S3 BRT (2028)

Station-area lots earn the largest rent premium in this market.

School signal
Northshore School District

Rental yield estimate: $2,500–3,200 / mo · UW Bothell demand drives small DADUs

Local incentive

Northshore housing-stability ADU rental incentive (10-yr lease commit)

Hidden gem

UW Bothell-adjacent DADUs lease faster than any other student-housing alt nearby.

Build cost · Bothell vs Puget Sound
+$25 vs regional median
$250 / sqftBothell$350$425 / sqft
Other cities we hold a permit history in
ZONE_BOTHELL / READ

Bothell zoning is layered. Get yours read by a licensed PM.

Zoning code is one layer. ECA overlays, tree protection, design review and side-sewer are the others. Send the address — we read all five.

  • Bothell-specific 5-layer read
  • Includes setback diagram for your lot
  • Free, returned within 24h on most addresses
Replies within 1 business day
WA Lic. GOLDESA747LZBuilding since 2012
Direct line · Golden State ADU(425) 642-4142

We reply within 1 business day. No spam, ever.

◇ No sales script · No spam · Your details stay with our team