REF_4218 · Garage Conversion · Kirkland, WA

Kirkland Garage Studio

A two-car detached garage converted into a high-end work-from-home studio with a 6'x6' fixed skylight — Kirkland's Norkirk neighborhood.

Type
Garage Conversion
Sqft
480
Beds / Baths
0 / 1
Completed
Mar 2024
Duration
18 wks
Budget
$172,500
Kirkland Garage Studio — Garage Conversion in Kirkland, WA

01 / BRIEF

What the owner asked for

A software architect wanted to stop renting a co-work desk in downtown Kirkland. Kirkland Zoning Code 115.07 allows garage conversions to office/studio use without triggering ADU review as long as no sleeping room, kitchen, or full bath is added — saving roughly $40K in code-required upgrades.

02 / CHALLENGE

What stood in the way

The 1958 garage had a 3.5" slab with no vapor barrier and a single 20A circuit feeding two outlets. The slab tested at 14 lbs/1000sf/24hr on a CaCl moisture test — too wet for any glue-down floor system.

03 / APPROACH

How we solved it

We floated a 1.5" mineral-wool subfloor with a 3/4" plywood deck over a polyethylene vapor break, bringing the floor R-value to R-7 and decoupling acoustically from the slab. The electrical was re-fed from the house with a 60A sub-panel. A single 6'x6' Velux fixed skylight was placed on the north slope for diffuse daylight without glare on screens.

04 / OUTCOME

What got delivered

Construction complete in 11 weeks after a 7-week permit. The studio is acoustically isolated to NIC-48 (measured) — comparable to a recording booth — and the owner reports a 30°F outdoor swing produces less than a 3°F interior swing on the heat pump.

SPEC_05 / FACTS

Project specification

Footprint
480 sqft (24' x 20')
Use
Home office (no kitchen, no sleeping)
Ceiling height
10'-0" peak
Skylight
Velux FS-606 6'x6' fixed, laminated

SCHEDULE_06 / PHASES

18-week delivery

  1. 01
    Feasibility & design
    4–6 wks

    Site survey, zoning memo, schematic plans, owner review.

  2. 02
    Construction docs
    3–4 wks

    Structural, MEP, energy compliance, permit-ready set.

  3. 03
    Permit review
    7 wks

    City corrections, utility sign-offs, building permit issued.

  4. 04
    Site work + foundation
    3–4 wks

    Erosion control, excavation, footings, slab or stem wall.

  5. 05
    Framing + dry-in
    5–6 wks

    Floor, walls, roof, windows, weather-resistive barrier.

  6. 06
    MEP rough-in + insulation
    4–5 wks

    Plumbing, electrical, HVAC, blower-door prep.

  7. 07
    Finish + cabinetry
    6–8 wks

    Drywall, paint, flooring, cabinets, tile, fixtures.

  8. 08
    Inspections + handover
    1–2 wks

    Final inspections, punch-list, 11-week build closeout.

MATERIAL_07

Materials

  • Cladding
    Re-clad: Hardie smooth panel, board-and-batten 16" o.c.
  • Roofing
    Existing 3-tab replaced with GAF Timberline HDZ
  • Floor
    Marmoleum Click 9.8mm over 3/4" plywood subfloor

SYSTEM_08

Systems

  • Heating / cooling
    Mitsubishi MSZ-FH09NA wall-mount, 9K BTU
  • Electrical
    60A sub-panel, 12 dedicated 20A circuits
  • Data
    Pulled CAT6A in conduit from main house

PERMIT_09 / RECORD

Permits & compliance

  • Permit number
    Kirkland BLD24-00188
  • Use classification
    Detached accessory structure — non-habitable

METRIC_10 / OUTCOME

By the numbers

NIC 48
Acoustic isolation
−$140,000
Cost vs. ADU
7 weeks
Permit review

LESSON_11 / FIELD NOTES

What we'd repeat

  • Confirming the use classification with Kirkland Planning before drawing CDs saved the owner from accidentally triggering full ADU code.
  • On 1950s slabs, always run a CaCl test before flooring selection — wet slabs eat through cheap moisture barriers in under 18 months.
FAQ

Frequently asked

  • Can I tour a project like "Kirkland Garage Studio"?

    Yes — we typically have 6–10 ADUs in framing or finish at any time across the Puget Sound, so we can usually arrange a site walk on a project at the same stage you're planning. For completed projects, tours depend on the current owner's availability and privacy preferences. Request a tour and we'll match you to the closest active or completed project that resembles "Kirkland Garage Studio" in size, configuration, and AHJ.

    Go deeper: Explore Garage Conversion

  • What did this project actually cost?

    Each project page includes the all-in cost range for the size and configuration shown, scaled to 2026 prices. Actual contract value at time of build is confidential to the client, but the range we publish is anchored in real numbers from our bid archive — not aspirational pricing. For a tailored estimate against your lot, run our feasibility study or use the cost calculator.

    Go deeper: Read the Five hidden ADU costs that wreck Puget Sound budgets guide

  • How long did this project take?

    Most projects of this size and configuration run 9–14 months from contract to certificate of occupancy: 6–8 weeks of design, 8–16 weeks of permit, 18–26 weeks of construction. Schedule variance is driven by AHJ workload, owner selection pace, and field-discovered conditions during demo or excavation. We publish a Gantt at contract and update it weekly.

    Go deeper: Read the Eastside deck cost & permits: cedar, IPE, composite (2026) guide

  • Could you build "Kirkland Garage Studio" again on my lot?

    Often yes — most of our projects are anchored on repeatable design DNA (envelope details, structural assemblies, MEP standard layouts) that adapt to different lot conditions with modest configuration changes. We'll review your lot's zoning, soils, and access to confirm fit. Where the original layout doesn't fit, we propose the closest workable adaptation that preserves the look you liked.

    Go deeper: Explore Garage Conversion

  • What inspections did "Kirkland Garage Studio" go through?

    Standard Puget Sound ADU inspection sequence applied: footing, underfloor MEP, framing, plumbing rough, electrical rough, mechanical rough, insulation, drywall nailing, shower pan, gas piping, final building, final plumbing, final electrical, final mechanical, and final energy verification (blower-door ≤3 ACH50). All passed with no notable callbacks — typical for our builds because we run internal QA checklists at each milestone.

    Go deeper: Kirkland ADU permit timeline

PROJECT_KIRKLAND GARAGE STUDIO

Want a build like "Kirkland Garage Studio" on your lot? Get a real number.

We can share the exact scope, finishes and budget from this project — and tell you what the same build would cost on your address.

  • Same crews, same subs, same standards as "Kirkland Garage Studio"
  • Free build-like-this feasibility on your address
  • Reply within one business day
Replies within 1 business day
WA Lic. GOLDESA747LZBuilding since 2012
Direct line · Golden State ADU(425) 642-4142

We reply within 1 business day. No spam, ever.

◇ No sales script · No spam · Your details stay with our team