Skip to main content

Redmond, WA · AADU

ATTACHED ADU Builder in Redmond, WA

An attached ADU shares a wall (and often a foundation) with your primary home. We specialize in carving these units out of basements, daylight floors, and underused side wings — all while preserving the existing home's character and avoiding common moisture, sound-isolation, and egress mistakes.

Build timeline

4–5 months

Typical sqft

300–800 sqft

Redmond cost

$99K – $333K

Permit window

10–14 wk

What attached adu looks like in Redmond

ATTACHED ADU projects in Redmond are shaped by local zoning (R-4 through R-8), a lot minimum of 5,000 sqft, and the kinds of sites we see day-to-day: Education Hill, Idylwood, Grass Lawn. Below is what every Redmond AADU project from Golden State includes — fixed-price, one contract, one warranty.

  • Existing-conditions survey
  • Egress + life-safety design
  • Acoustic + thermal envelope upgrades
  • Independent entry construction
  • Sub-metering of power & water
  • Final inspection + handover

Start your Redmond AADU feasibility

$1,500 buys lot analysis, Redmond zoning verification, and a fixed price you can build a budget on.

Request Redmond feasibility
FAQ

Frequently asked

  • How much does attached adu cost in Redmond, WA?

    ATTACHED ADU projects in Redmond typically run $300–$400/sqft all-in for 2026 contracts including design, permits, structural/MEP engineering, and finished construction. A typical mid-size attached adu project closes in the $180K–$340K range depending on size, finish tier, and lot conditions. Cost drivers specific to Redmond: SDC capacity charges ($4–14K spread), drainage review on lots over the impervious threshold ($8–22K), and electrical service upgrade if the existing panel can't carry the new load ($4.8–9.2K).

    Go deeper: Redmond ADU cost breakdown

  • How long does attached adu take in Redmond?

    End-to-end attached adu in Redmond: 9–14 months from contract to keys — 6–8 weeks design, 8–16 weeks Redmond permit review, 18–26 weeks construction. Catalog plans and pre-application meetings save 4–6 weeks of total elapsed time. Redmond's permit median for attached adu runs at the lower end of that band when the submittal is clean — first-cycle correction count matters more than the AHJ itself.

    Go deeper: Redmond ADU overview

  • What permits are required for attached adu in Redmond?

    Standard Redmond attached adu permit stack: building permit (combined review of structural, mechanical, plumbing), side-sewer permit, water meter capacity check, electrical permit, drainage review where impervious exceeds threshold, addressing application. Critical-areas review triggers on lots mapped for steep slope, wetland, or landslide hazard. ATTACHED ADU configurations near a 5-ft separation may add fire-rated assembly requirements per IRC R302.

    Go deeper: Redmond ADU permit timeline

  • What makes attached adu different in Redmond vs other Puget Sound cities?

    Three Redmond-specific variables: (1) reviewer preference — Redmond reviewers favor specific IECC R406 envelope paths and side-sewer detail conventions, and submittals that match those conventions clear faster; (2) SDC capacity charges — Redmond's fee schedule differs from surrounding jurisdictions by $4–14K typically; (3) inspection sequencing — Redmond's inspection portal and queue rhythm differ from neighbors. Our Redmond-specific submittal templates account for all three.

    Go deeper: Redmond ADU overview

  • Does attached adu in Redmond qualify for fast-track permitting?

    Often yes — under RCW 36.70A.681 / HB 1337, Redmond must permit qualifying ADU and middle-housing scopes ministerially. ATTACHED ADU on a residential lot meeting the standard envelope (height, setbacks, lot coverage, no critical areas) qualifies for the streamlined track in most cases. Configurations triggering design review, historic-overlay review, or critical-areas variance fall outside fast-track and add 4–10 weeks.

    Go deeper: Redmond ADU permit timeline

  • Can I finance attached adu in Redmond?

    Yes — HELOC, renovation loan (Fannie HomeStyle / Freddie CHOICERenovation), construction-to-perm, or cash-out refi all work for attached adu scopes in Redmond. WSHFC's ADU loan pilot (currently 3.5–4.25% for owner-occupants ≤120% AMI) covers ADU-scope attached adu projects. We pre-qualify with Redmond-area credit unions and banks before contract so financing isn't a surprise mid-build.

    Go deeper: Redmond ADU financing options

  • What's the warranty on attached adu in Redmond?

    One year workmanship, two years mechanical, 10 years structural per RCW 4.16.310. Manufacturer warranties pass through directly. Warranty applies statewide; Redmond inspections and certificate of occupancy do not change warranty terms. Written warranty packet delivered at closeout includes manufacturer paperwork, paint/finish specs for touch-up matching, and the contact protocol for service calls.

    Go deeper: Redmond ADU overview

  • Will attached adu raise my Redmond property taxes?

    Yes, but only on the marginal value of the new improvement. Under RCW 84.40.0301 the Redmond assessor adds 55–70% of construction cost to assessed value (not 100%). On a $210K attached adu project in Redmond, expect $1,900–$3,100/yr additional property tax depending on your levy code area. The primary residence assessment is not reopened — only the new improvement is added to the roll the year after final inspection.

    Go deeper: Redmond ADU cost breakdown

  • What's the rental income outlook for attached adu in Redmond?

    Redmond 1BR DADU and ADU rents in 2026 land $1,950–$3,200/mo long-term, with mid-term (30–90 day) 12–25% higher and short-term subject to Redmond-specific STR rules. Net operating income after vacancy, management, maintenance, and tax/insurance increment typically lands 62–70% of gross.

    Go deeper: Redmond ADU overview

  • Do you have Redmond attached adu project references?

    Yes — we provide 5+ Redmond attached adu references on request, including phone numbers, addresses, and one-paragraph project summaries. Redmond accounts for roughly 20–25% of our active pipeline at any time, so the reference list is current — no contacts from projects more than 24 months old. Site visits to completed Redmond projects available with current owner permission.

    Go deeper: Redmond ADU overview

  • Can you handle critical-areas review for attached adu in Redmond?

    Yes. Redmond's critical-areas code (steep slope, wetland, riparian, landslide hazard) is triggered by GIS-mapped overlays on your parcel. We pre-screen at feasibility and engage a WA-licensed geotech or wetland biologist when needed. Critical-areas variances add 8–16 weeks to permit timeline; in many cases the project can be redesigned to avoid the trigger entirely, saving time and cost.

    Go deeper: Redmond ADU permit timeline

  • What inspections will attached adu in Redmond require?

    Standard Redmond sequence: footing/foundation, underfloor MEP, wall framing, plumbing rough, electrical rough, mechanical rough, insulation, drywall nailing (some AHJs), shower pan, gas piping, final building, final plumbing, final electrical, final mechanical, and final energy verification (blower-door test for ADUs and major remodels per IECC R402.4.1.2). Each inspection scheduled 1–2 business days out via Redmond's online portal.

    Go deeper: Redmond ADU permit timeline

  • What is included in ATTACHED ADU in Redmond?

    Our ATTACHED ADU in Redmond scope includes design through completion: feasibility, schematic design, construction documents, permit submittal and review management, construction with one self-performed framing crew plus L&I-licensed MEP subcontractors, all required WA inspections, certificate of occupancy, and warranty. One contract, one license number, one warranty — not a coordination headache across five vendors.

    Go deeper: Redmond ADU overview

  • How is ATTACHED ADU in Redmond different from a generic remodel?

    ATTACHED ADU in Redmond carries code, permit, and construction details that a one-off remodeler hasn't repeated enough times to optimize. Examples: IECC R406 envelope path selection, fire separation when units are within 5 ft, side-sewer slope requirements, IRC Appendix AQ when permitted as a tiny house, separate utility metering rules. We do this scope every month — repetition is what makes our first-cycle approval rate and our schedule reliability stand out.

    Go deeper: Redmond ADU overview

  • What is the typical price range for ATTACHED ADU in Redmond?

    ATTACHED ADU in Redmond pricing in 2026 lands $330–$380/sqft all-in depending on size, lot conditions, finish tier, and AHJ. The wide range is real — small lots with difficult access, soils requiring pier-and-beam, or service upgrades push the upper end; flat lots with good access and a catalog plan land at the lower end. Our feasibility report gives you a ±15% number tailored to your specific lot in two weeks.

    Go deeper: Redmond ADU cost breakdown

  • What permits does ATTACHED ADU in Redmond require?

    Standard ATTACHED ADU in Redmond permit stack: building permit (covers structural, mechanical, plumbing under combined review), side-sewer permit, water meter capacity check, electrical permit, drainage review where applicable, addressing application. Critical-areas review triggers on lots mapped for steep slope, wetland, riparian, or landslide hazard. We pull all permits as a pass-through line in our contract — not marked up.

    Go deeper: Redmond ADU permit timeline

  • How long does ATTACHED ADU in Redmond take from contract to completion?

    9–14 months end-to-end is typical for ATTACHED ADU in Redmond: 6–8 weeks design, 8–16 weeks permit, 18–26 weeks construction. Faster on catalog plans with pre-app meetings. Schedule variance is driven by AHJ workload, owner selection pace, and any field-discovered conditions. We publish a Gantt at contract and update it weekly.

    Go deeper: Redmond ADU overview

  • What's the warranty on ATTACHED ADU in Redmond?

    One year workmanship, two years mechanical (HVAC, plumbing rough, electrical rough), 10 years structural per RCW 4.16.310. Manufacturer warranties pass through directly: LP SmartSide siding 50-year, GAF Timberline HDZ shingles, Marvin window 20-year, Bosch/GE appliances 1-year. Documented in a written warranty packet at closeout.

    Go deeper: Redmond ADU overview

  • Do you self-perform ATTACHED ADU in Redmond work or subcontract everything?

    We self-perform framing, exterior weather barrier, interior trim, and project supervision with W-2 carpenters. MEP trades (plumbing, electrical, HVAC) are subcontracted to L&I-licensed specialty contractors we've worked with 5+ years — WA requires separate PL, EL, HVAC/R licenses that a GC cannot legally self-perform without them.

    Go deeper: Redmond ADU overview

  • What's the change-order policy on ATTACHED ADU in Redmond?

    Every change order is written, priced, and signed before work proceeds. We never charge T&M without a not-to-exceed. Owner-initiated changes carry 15% OH&P; field-discovered conditions (rotted sheathing, undocumented buried oil tank, unmapped sewer) are priced at cost +10% with photo documentation. Average ATTACHED ADU in Redmond project sees 4–7 change orders totaling 3–6% of contract value.

    Go deeper: Redmond ADU overview

  • What financing works for ATTACHED ADU in Redmond?

    HELOC (fastest, 8.0–9.5% APR), renovation loan (Fannie HomeStyle / Freddie CHOICERenovation, 7.1–7.9%), construction-to-perm (best for ground-up), or cash-out refi (only if existing rate above market). WSHFC's ADU pilot at ~3.5–4.25% applies to ADU-scoped ATTACHED ADU in Redmond projects for income-qualified owners.

    Go deeper: Redmond ADU financing options

  • Do you provide references for ATTACHED ADU in Redmond work?

    Yes — we provide 5+ ATTACHED ADU in Redmond references on request: past clients in your target city, your target neighborhood when possible, and at your target scope. References include name, phone, project address, and a one-paragraph project summary. We refresh the reference list quarterly so the contacts are recent and reachable.

    Go deeper: Redmond ADU overview

CITY_DOSSIER / REDMOND· 47.6740°N 122.1215°W

Built in Redmond — what we know that the spec sheet won't tell you.

A live dossier from our field PMs: the permit counter, the soils, the bylaw that just changed, and the streets where ADUs are already cash-flowing.

Map · King CountyOpen ↗
Redmond
Drive-time from yard · ≈ 26 min via 520© OpenStreetMap contributors
Population78,213
Median lot7,800 sq ft
ADU permits / yr64 (2024)
Build cost band$330–380 / sq ft
Right now in Redmond
Air quality · US AQI
Source · Google Maps PlatformAffects pour windows + finish schedule
LIVE_INTEL / REDMOND · 6 SIGNALS
Pour-feasibility · todayLoading
/ 100 · Awaiting feed
  • Weather feed loading
Derived live · Redmond weather + AQI
Sun rhythm · RedmondDaylight
5:25 AM
9:05 PM
15h 40m daylight
Golden hour · 8:18 PM
98% of June peak
NOAA solar formulas · computed
Moon · cure-week planner
Loading

We track lunar weeks for slab pours — clear nights drop ambient temperature faster, which slows surface curing. Schedule wet slabs midweek under waxing light.

Conway approx · computed
Seismic · 24h within 60 miLoading
USGS earthquake.usgs.gov
On-site clock · Redmond
—:—
· Pacific

Loading. Our standard crew window is 7:00–17:00 weekdays — noise ordinances in most Puget Sound cities allow exterior power tools only inside that band.

America/Los_Angeles · live
Build-rules pulseWithin window
7:00–17:00
Power-tool window · Mon–Fri
ADU permits YTD pace

Sunday exterior work is restricted in most Puget Sound jurisdictions. We sequence interior trades around it.

Redmond municipal code · annualized
SPEC_02 / CITY_INTEL

Environmental & locational intelligence

03 / SOLAR_POTENTIAL

Rooftop solar at this address

04 / POLLEN_FORECAST

Tree · Grass · Weed (3-day)

05 / WALK_SCORE

0.5-mile amenity density

06 / NWS_ALERTS

Active NWS weather alerts

LOCATIONAL_INTEL / REDMOND
Drive times from RedmondLoading

Calculating live drive times to four metro anchors…

Real commute time matters for ADU rent comps — and for our crews. We keep installs within a 60-minute radius of our Puget Sound yard.

Data provenance

Drive times pulled live from the Google Routes API (traffic-aware matrix). Each request is timestamped so you can see exactly when the numbers were last refreshed — no stale brochure data.

Google Routes API · traffic-aware
Street view · RedmondLive imagery
Recent Google Street View imagery centered near Redmond

Lot context matters as much as zoning. We pre-screen access, slope, and tree canopy from imagery before scheduling the site visit.

Google Street View · proxied
Tidal window · RedmondLoading

Waterfront lots: shoreline excavation and barge access windows depend on these. We schedule pours away from extreme low tides when the soils dry unevenly.

NOAA · — mi away
Recent permits · RedmondLoading

Open-data signal of nearby construction velocity — useful for ADU comps and for anticipating examiner workload.

data.seattle.gov · ~3 mi radius
Permit counter · Redmond
Redmond Planning & Community Development
15670 NE 85th St, Redmond 98052
Mon–Fri 8a–5p · digital pre-app required
Local zoning quirk

Education Hill & Grass Lawn lots often hit tree-retention thresholds before FAR — plan crown protection early.

Sourced from Golden State ADU field PMs · WA Lic. GOLDESA747LZ
Best build window
May → October

Bar shows pour-friendly months · dot marks the current month.

  • Seismic
    SDC D · stable plateau geology
  • Soil
    Glacial till on plateau, peat pockets near Sammamish River
  • Climate
    Slightly drier than Seattle (≈34″/yr), east-of-lake sun bonus
  • Topography
    Mostly gentle slope
  • HOA prevalence
    ≈ 28% — Education Hill, Grass Lawn, Idylwood
Transit signal
2 Line Downtown Redmond + Marymoor Village stations (2024)

Station-area lots earn the largest rent premium in this market.

School signal
Lake Washington School District

Rental yield estimate: $2,900–3,700 / mo · Microsoft proximity drives demand

Local incentive

Tech-corridor zoning allows live/work ADU configurations near Overlake

Hidden gem

Tree-retained DADUs in Education Hill pre-lease in <14 days.

Build cost · Redmond vs Puget Sound
+$30 vs regional median
$250 / sqftRedmond$355$425 / sqft
Other cities we hold a permit history in
REDMOND / ATTACHED ADU

Attached Adu in Redmond: get a quote backed by real local builds.

We file dozens of Redmond Attached Adu projects a year. Send the address and we'll come back with a number plus 3 named Redmond comparables.

  • Redmond-specific Attached Adu comparables
  • Fixed-fee scope, no ranges
  • Reply within one business day
Replies within 1 business day
WA Lic. GOLDESA747LZBuilding since 2012
Direct line · Golden State ADU(425) 642-4142

We reply within 1 business day. No spam, ever.

◇ No sales script · No spam · Your details stay with our team