SDCI

Also known as: Seattle Department of Construction and Inspections

Seattle's permitting agency — issues all building, land use, and electrical permits inside city limits.

DEFINITION

The Seattle Department of Construction and Inspections (SDCI) is the city agency that reviews and issues building permits, land use permits, electrical permits, and conducts inspections within Seattle city limits. ADU projects in Seattle route through SDCI's residential plan review queue, which currently averages 12–16 weeks for full custom plans and 6–8 weeks for projects using the Pre-Approved DADU library.

Source · SDCI Permit Dashboard

APPLIED / SEE IT IN CONTEXT

Where this comes up in our work

Cities
FAQ

Frequently asked

  • What does SDCI mean in the context of an ADU?

    SDCI is part of the regulatory and technical vocabulary you encounter when permitting and building an accessory dwelling unit in Washington. Knowing the term matters because reviewers, inspectors, and your lender will use it without explanation. We define SDCI in plain English and connect it to the specific code citation, fee, or construction detail that affects your project. Use the related-terms section to navigate adjacent concepts you'll need on the same plan set.

    Go deeper: Read the Seattle SDCI ADU permit process, step by step (2026) guide

  • Where does SDCI apply in the WA ADU process?

    SDCI typically shows up in either the design phase (when the architect or designer is laying out plans against zoning), the permit phase (when reviewers check the submittal against code), or the construction phase (when inspectors verify built conditions match the approved set). The same term can appear in your loan documents if it affects valuation or risk. Each glossary entry maps the term to the exact phase where it matters most.

    Go deeper: Read the Seattle SDCI ADU permit process, step by step (2026) guide

  • Why should I care about SDCI for my project?

    Misunderstanding SDCI is one of the most common reasons ADU projects hit avoidable cost overruns or permit delays. A clear shared vocabulary between you, your designer, and your builder shortens decision time and reduces change orders. Bookmark this glossary and refer back as you progress from feasibility through final inspection.

    Go deeper: Glossary: SDCI

  • How does SDCI affect my ADU budget?

    Most glossary terms map to either a cost line, a review timeline, or a permit fee. Where SDCI drives cost, the impact is itemized in our standard fee schedule and itemized at feasibility — so by contract time, SDCI is a known number, not a discovered surprise. Click through to the related cost or permit page for the current SDCI-specific dollar range and timeline.

    Go deeper: Read the Seattle SDCI ADU permit process, step by step (2026) guide

  • Is SDCI regulated under RCW 36.70A.681?

    WA statewide ADU preemption (RCW 36.70A.681 / HB 1337) covers many ADU-adjacent topics: size caps, setbacks, owner-occupancy, parking, height, lot-size minimums. Whether SDCI falls under preemption depends on its specific scope — design review, side-sewer permitting, drainage review, and tree-protection rules are generally NOT preempted, while size/setback/parking generally ARE. Each glossary entry flags the preemption status.

    Go deeper: Read the Seattle SDCI ADU permit process, step by step (2026) guide

TERM_SDCI

Need "Sdci" explained for YOUR lot? Get it in plain English.

Definitions help. Applying them to your specific property is what matters. Send the address and we'll explain how Sdci plays out on your build.

  • Plain-English read of "Sdci" on your lot
  • Personal reply from a licensed PM
  • One-business-day SLA
Replies within 1 business day
WA Lic. GOLDESA747LZBuilding since 2012
Direct line · Golden State ADU(425) 642-4142

We reply within 1 business day. No spam, ever.

◇ No sales script · No spam · Your details stay with our team