Feasibility Study

Also known as: Site feasibility · ADU feasibility report

A pre-design report confirming what's actually buildable on your lot before architecture spend.

DEFINITION

An ADU feasibility study is a short-form report (typically 10–20 pages) that confirms a specific lot can support a specific ADU strategy before you spend on architecture. A complete study covers: zoning + overlay verification, buildable envelope after setbacks/FAR/lot coverage, ECA flags, side-sewer condition, utility capacity, impervious-surface budget, indicative cost range, and an estimated permit timeline. Done well, feasibility costs $1,500–$3,500 and saves $30K–$80K of mid-design surprises.

APPLIED / SEE IT IN CONTEXT

Where this comes up in our work

FAQ

Frequently asked

  • What does Feasibility Study mean in the context of an ADU?

    Feasibility Study is part of the regulatory and technical vocabulary you encounter when permitting and building an accessory dwelling unit in Washington. Knowing the term matters because reviewers, inspectors, and your lender will use it without explanation. We define Feasibility Study in plain English and connect it to the specific code citation, fee, or construction detail that affects your project. Use the related-terms section to navigate adjacent concepts you'll need on the same plan set.

    Go deeper: Read the Puget Sound ADU timeline guide: kickoff to keys guide

  • Where does Feasibility Study apply in the WA ADU process?

    Feasibility Study typically shows up in either the design phase (when the architect or designer is laying out plans against zoning), the permit phase (when reviewers check the submittal against code), or the construction phase (when inspectors verify built conditions match the approved set). The same term can appear in your loan documents if it affects valuation or risk. Each glossary entry maps the term to the exact phase where it matters most.

    Go deeper: Read the Puget Sound ADU timeline guide: kickoff to keys guide

  • Why should I care about Feasibility Study for my project?

    Misunderstanding Feasibility Study is one of the most common reasons ADU projects hit avoidable cost overruns or permit delays. A clear shared vocabulary between you, your designer, and your builder shortens decision time and reduces change orders. Bookmark this glossary and refer back as you progress from feasibility through final inspection.

    Go deeper: Glossary: Feasibility Study

  • How does Feasibility Study affect my ADU budget?

    Most glossary terms map to either a cost line, a review timeline, or a permit fee. Where Feasibility Study drives cost, the impact is itemized in our standard fee schedule and itemized at feasibility — so by contract time, Feasibility Study is a known number, not a discovered surprise. Click through to the related cost or permit page for the current Feasibility Study-specific dollar range and timeline.

    Go deeper: Read the Five hidden ADU costs that wreck Puget Sound budgets guide

  • Is Feasibility Study regulated under RCW 36.70A.681?

    WA statewide ADU preemption (RCW 36.70A.681 / HB 1337) covers many ADU-adjacent topics: size caps, setbacks, owner-occupancy, parking, height, lot-size minimums. Whether Feasibility Study falls under preemption depends on its specific scope — design review, side-sewer permitting, drainage review, and tree-protection rules are generally NOT preempted, while size/setback/parking generally ARE. Each glossary entry flags the preemption status.

    Go deeper: Read: Bellevue ADU rules — what changed under HB 1337

TERM_FEASIBILITY STUDY

Need "Feasibility Study" explained for YOUR lot? Get it in plain English.

Definitions help. Applying them to your specific property is what matters. Send the address and we'll explain how Feasibility Study plays out on your build.

  • Plain-English read of "Feasibility Study" on your lot
  • Personal reply from a licensed PM
  • One-business-day SLA
Replies within 1 business day
WA Lic. GOLDESA747LZBuilding since 2012
Direct line · Golden State ADU(425) 642-4142

We reply within 1 business day. No spam, ever.

◇ No sales script · No spam · Your details stay with our team