Cabinets contractor —
Seattle & Puget Sound.

We work with regional shops on custom and semi-custom cabinet runs. Frameless European builds, inset shaker, or rift-cut walnut — quoted to your kitchen, not a catalog SKU.

Group
Interior Remodeling
Timeline
8–14 weeks lead
Range
$25K – $120K
OVERVIEW

We work with regional shops on custom and semi-custom cabinet runs. Frameless European-style construction is the default — full-access interior, no face-frame to lose drawer width, and modern hardware that closes the same way at year 10 as year 1.

Cabinet shops in the Pacific Northwest have a real depth — solid-wood door fronts, lifetime hardware (Blum, Salice, Hettich), and the ability to ship within 8–14 weeks instead of the 16–22 weeks national semi-custom typically runs. We pass that lead time directly to project schedule.

What we build

SCOPE
  • 01Custom + semi-custom builds
  • 02Soft-close hardware
  • 03Integrated lighting
  • 04Built-in pantries + closets
  • 05Mudroom + entry millwork
  • 06Pull-out + organizer fitting

Phased process

PROCESS
  1. 01

    Design

    Measured field drawings, shop drawings approved by client, hardware and finish samples reviewed in-person.

  2. 02

    Order

    Cabinetry into shop production; 8–14 week lead. We coordinate site readiness to receive on schedule.

  3. 03

    Site prep

    Walls primed, flooring installed or protected, plumbing rough complete, electrical sub-circuits pulled.

  4. 04

    Install

    Boxes leveled and shimmed with laser, screwed through framing not drywall, scribe-fit to walls, fillers and panels finalized.

  5. 05

    Adjust & punch

    Door alignment, drawer slide tuning, soft-close calibration, hardware install.

Spec sheet

SPEC
  • +Frameless 3/4" plywood box, melamine or paint-grade interior
  • +Soft-close concealed hinges (Blum Clip Top BLUMOTION) and undermount drawer slides (Blum Tandem)
  • +Solid-wood door fronts (rift-cut oak, walnut, painted MDF, thermofoil)
  • +Integrated LED under-cabinet lighting with dimmer
  • +Pull-out trash, spice rack, blind-corner LeMans organizers
  • +Toe-kick panels and crown molding scribed to ceiling

Cost drivers

COST
  • Construction (stock → semi-custom → custom)$200/lf stock → $1,200+/lf custom-built kitchen
  • Door style and materialPainted MDF → solid walnut can double material cost
  • Storage organization (pull-outs, racks)+$2K–$8K for a fully fitted-out kitchen
  • Custom dimensions (deep, tall, narrow)+15–30% over standard 24/36/12 modules
  • Hardware level (basic → designer)$3 to $40+ per pull on a 30-pull kitchen

Codes & permits

COMPLIANCE
  • AWI 200 standards

    Custom-grade architectural woodwork standard. Our partner shops build to AWI Premium or Custom grade depending on scope.

  • CARB Phase 2 (formaldehyde)

    All plywood and MDF must meet CARB / TSCA Title VI for low-formaldehyde emissions. Standard on our shop orders.

WHEN_YOU_NEED

Is cabinets the right call?

  • Kitchen remodel — cabinet quality is the single biggest visual and functional variable
  • Bathroom vanities, especially primary suites
  • Built-in pantry, mudroom, laundry, or office storage
  • Closet systems and integrated bedroom millwork

Cabinets questions

FAQ
  • Q.01

    Custom vs semi-custom vs stock — which fits me?

    Stock is fine for rentals and tight budgets ($200–$400/lf). Semi-custom is the sweet spot for most kitchens ($500–$800/lf) — broad door/finish selection, sized in 3" increments. Custom is right when you want non-standard dimensions, exotic veneer, or specific hardware integration ($800–$1,500+/lf).
  • Q.02

    How long do cabinets take?

    Stock: 2–4 weeks. Semi-custom (local PNW shop): 8–14 weeks. Custom: 12–20 weeks. Lead time is usually the project critical path.
  • Q.03

    Can you reface my existing cabinets?

    Yes if the boxes are solid and the layout works. Refacing runs 40–60% of replacement cost and works best on plywood boxes. Particleboard boxes are not worth refacing — replace.
  • Q.04

    Inset vs overlay doors — what's the difference?

    Overlay (full-overlay frameless) is the modern default — clean lines, maximum interior access, lower cost. Inset doors sit flush inside the frame — traditional aesthetic, more handcraft, +20–35% cost.
NEXT_STEP

Ready to scope your cabinets project?

Send a paragraph and the address. A licensed PM replies within one business day with next steps.

START THIS PROJECT
SERVICE_CABINETS

Cabinets is what we do every week — want a quote on yours?

Send the address and we'll come back with a real number for Cabinets on your lot, plus 3 named comparables we've delivered.

  • Cabinets-specific quote with 3 named comparables
  • Fixed-fee scope, no ranges
  • Reply within one business day
Replies within 1 business day
WA Lic. GOLDESA747LZBuilding since 2012
Direct line · Golden State ADU(425) 642-4142

We reply within 1 business day. No spam, ever.

◇ No sales script · No spam · Your details stay with our team