Skip to main content
April 15, 2025 · 6 min

Kirkland Zoning Code 115 and ADU heights

The specific Kirkland code that drives DADU massing decisions, and how to design around the upper-floor cutbacks.

Kirkland Zoning Code 115 and ADU heights

The height rule

Kirkland Zoning Code Chapter 115 establishes the dimensional standards for accessory dwelling units. The relevant numbers: 25 feet to the highest point on a flat or shed roof, 30 feet to the ridge on a pitched roof of 4:12 or greater, and 1,000 sqft maximum gross floor area.

These limits apply uniformly across Kirkland's single-family zones (RS 5.0 through RS 35) and are consistent with the HB 1337 floor.

Sources:City of Kirkland

The upper-floor cutback that catches owners off-guard

Kirkland adds a setback-plane rule for any portion of a DADU above 16 feet from grade. That upper portion must step back one foot for every additional foot of height on side and rear elevations that face an adjacent residential property.

Practical consequence: a two-story DADU at the 25-foot height limit needs an additional 9 feet of setback on those elevations beyond the standard 5-foot minimum — effectively 14 feet of clear side yard. On a typical 50-foot-wide Kirkland lot with an existing primary residence, this is the single most common reason a two-story design has to drop to one-and-a-half stories.

Designing within the rule

Three patterns we use to keep ADUs at full 1,000 sqft inside the cutback: (1) shed roof with the high side facing the alley or street, low side toward the neighbor, (2) gambrel or shed-dormer second floor with the dormers oriented toward the primary house rather than the neighbor, (3) two-bay garage at grade with the dwelling unit stacked above set back from one side.

All three preserve livable second-floor square footage while complying with the upper-floor setback plane. None of them require a variance.

FAQ

Frequently asked

  • Why does this insight matter for WA ADU owners?

    Each insight on the Golden State journal targets a specific decision point in the ADU lifecycle — financing structure, design tradeoffs, code changes, market data, or operating decisions for a rental unit. We publish only when we have new primary data from our own bid archive, permit logs, or comp pulls related to "Kirkland Zoning Code 115 and ADU heights". The goal is decision-grade information, not generic marketing copy.

    Go deeper: Glossary: ADU (Accessory Dwelling Unit)

  • How current is the data in this article?

    Insights are dated and the underlying datasets refresh on a rolling basis: cost-per-sqft benchmarks update quarterly from our active Puget Sound bid book, permit timelines update monthly from AHJ logs, rent comps update quarterly from on-market and recently-leased pulls in King/Pierce/Snohomish. Each chart or table notes its as-of date. If you need a custom analysis against your specific submarket, request a feasibility study.

    Go deeper: Glossary: RRIO (Rental Registration & Inspection Ordinance)

  • Can I reuse this analysis for my own planning?

    Yes — every insight is written to be actionable. The math is shown, the assumptions are named, and the conclusion is tied to a specific decision (which loan, which finish tier, which AHJ, which size). Feel free to share with your CPA, lender, or family decision-makers. If you'd like a 30-minute walkthrough of how the article's framework applies to your specific lot, book a free scoping call.

    Go deeper: Glossary: ECA (Environmentally Critical Area)

  • Does "Kirkland Zoning Code 115 and ADU heights" apply to my Puget Sound city?

    Most insights are written to apply across the Puget Sound region with the city-specific variables (fees, permit medians, rent comps) called out in tables. When the analysis is city-specific (e.g., Seattle SDCI process), it's labeled in the headline. Use the city pages linked from the article to map the framework to your specific AHJ.

    Go deeper: Read: Kirkland Zoning Code 115 and ADU heights

  • Where do I go from here?

    Three good next stops: (1) the ROI calculator if you're evaluating whether the math works on your lot; (2) the permit timeline page for current AHJ medians in your city; (3) the contact form to book a free 20-minute scoping call. Every insight cross-links the most relevant next pages at the bottom.

    Go deeper: Glossary: ECA (Environmentally Critical Area)

INSIGHT / APPLY

Liked "Kirkland Zoning 115 Adu Heights"? Get it applied to YOUR lot — free 1-pager.

Every insight here comes from a real build. Send your address and we'll show you what this article means for your specific project.

  • 1-page brief tied to "Kirkland Zoning 115 Adu Heights" + your lot
  • Returned within 1 business day
  • Free for the first 50 owners each quarter
Replies within 1 business day
WA Lic. GOLDESA747LZBuilding since 2012
Direct line · Golden State ADU(425) 642-4142

We reply within 1 business day. No spam, ever.

◇ No sales script · No spam · Your details stay with our team