LEDGER_A / PROPERTY TAX
What the assessor does after CofO
- New construction reassessment. RCW 84.40.0301 requires the assessor to add the value of the ADU at the next assessment date after CofO. In Tumwater, that lift is typically ~$275k on an $$353k build.
- Levy math. Assessed value × levy rate ÷ 1,000. $$275k × $10.62 = $2,921/yr (~$243/mo).
- 1% cap on regular levies (RCW 84.55). Regular district levies can only grow 1%/yr on the existing base, but new construction value is added on top — that's why your bill jumps the first year.
- Voted levies + bonds. School bonds, EMS levies, and capital bonds sit outside the 1% cap. Tumwater bond cycles can move your effective rate ±$0.30/$1k year-over-year.