Redmond ADU Pre-Application & Intake

Intake is the moment Redmond accepts your ADU permit application as complete enough to assign to reviewers. You upload drawings and forms to the city's online portal, the city verifies the package against its intake checklist, and either accepts it for review or rejects it back for missing items.

Last verified 2026-05-15

Typical timeline1–2 weeks
Direct city fees$200–$450
Reviewing departmentRedmond Planning & Community Development
Submittal portalhttps://www.redmond.gov/175/Planning-Community-Development

Timeline and fee ranges are project-level averages aggregated from public data and Golden State ADU project history. Authoritative current numbers live in the Redmond published fee schedule and the city's permit portal — verify before budgeting.

SPEC_01 / WHAT THIS PHASE MEANS

What pre-application & intake actually means in Redmond

Permit intake is the administrative front door. Reviewers do not read your plans yet — an intake coordinator checks that the application form, owner authorization, site plan, floor plans, and required reports are present, named correctly, and use the file formats the city expects.

If the package is complete, Redmond routes it into the review queue and your "weeks in review" clock starts. If it is incomplete, the package bounces back. Bounce-backs do not just lose the day you submitted — they push you to the back of the intake queue.

For ADUs specifically, intake usually wants to see scope (AADU vs DADU vs garage conversion), site plan with setbacks and existing structures, dimensional floor plans, and basic project data (height, lot coverage, parking). Energy and structural details often arrive later, but the project description must already match what the zoning code allows.

REDMOND NOTE
Redmond uses a Plan Review Online (PRO) portal — applicants submit a permit request, then receive detailed upload instructions. Improperly named or formatted files may be rejected at intake; paper plans, incomplete applications, and applications delivered by courier are explicitly not accepted.

SPEC_02 / WHAT MOVES THE TIMELINE

Why Redmond pre-application & intake hits the high end

  • 01Whether the application form, owner authorization, and contractor information are filled in correctly the first time
  • 02Whether plans use the city's required file naming and PDF page sizes
  • 03Whether a pre-application or pre-submittal meeting is required for the project type
  • 04Backlog at the intake desk in peak permit season
SPEC_03 / WHAT MOVES THE FEES

Where the dollars actually come from

  • 01Most cities collect an application or intake fee at this step; the larger plan review fee usually invoices after intake
  • 02Pre-application meetings, when required, may have their own fee
  • 03Re-intake after a rejected submittal is generally free, but consultant time to fix the package is not

Exact dollar amounts vary by project. Use the Redmond fee schedule linked below for the current numbers.

SPEC_04 / WHERE PROJECTS GO SIDEWAYS

Common homeowner mistakes

Submitting without checking the current intake checklist

Cities update their submittal checklists. Pulling last year's checklist almost guarantees a rejection at intake.

Wrong file naming or oversized PDFs

Most intake desks reject submittals where plan sheets are not named per the city's standard or are uploaded as a single oversized PDF.

Site plan that disagrees with the zoning code

If setbacks, height, lot coverage, or unit count obviously violate the underlying code, intake will catch it before review and ask you to fix the application first.

SPEC_05 / WHAT TO PREPARE

Pre-Application & Intake checklist

These are typical artifacts for an ADU project at this phase in Washington cities. Exact requirements depend on the project and the current Redmond submittal checklist — verify with the city before submitting.

  • Completed permit application form (with parcel ID and project address)
  • Owner authorization
    Required when a contractor or designer applies on the owner's behalf.
  • Site plan
    Existing and proposed structures, setbacks, easements, lot lines, and dimensions.
  • Floor plans
    Dimensions, room labels, doors/windows, and stair locations.
  • Elevations
    All sides, with overall height and grade.
  • Project data sheet
    Lot size, lot coverage, FAR, parking, height, and ADU type.
  • Address verification
    Some cities require a new address request for a DADU prior to intake.

When to call a pro
Bring in a designer or ADU-experienced contractor before intake — fixing intake bounce-backs in Redmond is almost always slower than getting the submittal right the first time.

FAQ / REDMOND INTAKE

Redmond Pre-Application & Intake questions

  • How long does Redmond ADU pre-application & intake take?

    For an ADU project in Redmond, WA this phase typically runs 1–2 weeks. Complex sites, missing reports, first-time submittals, or busy permit seasons trend toward the upper end. Resubmittals reset the clock for that round. These ranges are project-level averages — verify the current published timeline with Redmond for your specific project.

    Go deeper: Redmond ADU overview

  • What does pre-application & intake cost in Redmond?

    Direct Redmond fees for this phase typically run $200–$450. That excludes designer/consultant time, impact fees, side-sewer / utility connection charges, and inspection fees that may apply separately. The authoritative current numbers live in the Redmond published fee schedule.

    Go deeper: Redmond ADU cost breakdown

  • Which Redmond department handles pre-application & intake?

    Redmond Planning & Community Development handles this phase; submittals and status live in https://www.redmond.gov/175/Planning-Community-Development. See City of Redmond — Planning & Community Development: https://www.redmond.gov/469/Residential-Permits.

    Go deeper: Read the Eastside deck cost & permits: cedar, IPE, composite (2026) guide

  • What's the most common reason pre-application & intake stalls in Redmond?

    Wrong file naming, missing owner authorization, and a site plan that disagrees with the underlying zoning are the usual stall causes in Redmond. We pre-screen every submittal against the current Redmond checklist before it goes to the city.

    Go deeper: Read the Eastside deck cost & permits: cedar, IPE, composite (2026) guide

  • Do I need a contractor or designer for Redmond pre-application & intake?

    Not legally required for owner-applicants, but in Redmond every ADU permit eventually touches building, land use, fire, and public works review tracks. A designer of record is effectively required because review comments are technical and time-bound.

    Go deeper: Read the Eastside deck cost & permits: cedar, IPE, composite (2026) guide

  • How do I check Redmond permit status during pre-application & intake?

    Redmond publishes live status inside https://www.redmond.gov/175/Planning-Community-Development. The same record carries application data, review comments, fee balances, and (after issuance) inspection results.

    Go deeper: Read the Seattle SDCI ADU permit process, step by step (2026) guide

SPEC_06 / OFFICIAL SOURCES

Redmond permit sources we used

Every claim on this page about Redmond permits, fees, portals, or departments traces to an official city or zoning-code source. Numbers in the at-a-glance table come from our project history and public data; verify current values with the city before budgeting.

  • City of Redmond — Planning & Community Development · city page
    Residential Permits

    Redmond residential permits, including ADUs, are handled by Planning's Development Services.

    Accessed 2026-06-03

  • City of Redmond — Zoning Code · code
    RZC 21.08.220 Accessory Dwelling Units (PDF)

    Redmond's land-use code section governing ADU purpose, type, size, and siting standards.

    Accessed 2026-06-03

  • City of Redmond · help article
    Redmond Plan Review Online (PRO) overview (PDF)

    Redmond's electronic plan-submittal program (PRO) and the rejection rules for paper / mis-named files.

    Accessed 2026-06-03

  • MyBuildingPermit (E-PermitHub) · portal
    MyBuildingPermit — Redmond jurisdiction

    Redmond uses the MyBuildingPermit portal for application, status, and inspection scheduling.

    Accessed 2026-06-03

CITY_DOSSIER / REDMOND· 47.6740°N 122.1215°W

Built in Redmond — what we know that the spec sheet won't tell you.

A live dossier from our field PMs: the permit counter, the soils, the bylaw that just changed, and the streets where ADUs are already cash-flowing.

Map · King CountyOpen ↗
Redmond
Drive-time from yard · ≈ 26 min via 520© OpenStreetMap contributors
Population78,213
Median lot7,800 sq ft
ADU permits / yr64 (2024)
Build cost band$330–380 / sq ft
Right now in Redmond
Air quality · US AQI
Source · Google Maps PlatformAffects pour windows + finish schedule
LIVE_INTEL / REDMOND · 6 SIGNALS
Pour-feasibility · todayLoading
/ 100 · Awaiting feed
  • Weather feed loading
Derived live · Redmond weather + AQI
Sun rhythm · RedmondNight
5:26 AM
9:04 PM
15h 39m daylight
Golden hour · 8:17 PM
98% of June peak
NOAA solar formulas · computed
Moon · cure-week planner
Loading

We track lunar weeks for slab pours — clear nights drop ambient temperature faster, which slows surface curing. Schedule wet slabs midweek under waxing light.

Conway approx · computed
Seismic · 24h within 60 miLoading
USGS earthquake.usgs.gov
On-site clock · Redmond
—:—
· Pacific

Loading. Our standard crew window is 7:00–17:00 weekdays — noise ordinances in most Puget Sound cities allow exterior power tools only inside that band.

America/Los_Angeles · live
Build-rules pulseWithin window
7:00–17:00
Power-tool window · Mon–Fri
ADU permits YTD pace

Sunday exterior work is restricted in most Puget Sound jurisdictions. We sequence interior trades around it.

Redmond municipal code · annualized
SPEC_02 / CITY_INTEL

Environmental & locational intelligence

03 / SOLAR_POTENTIAL

Rooftop solar at this address

04 / POLLEN_FORECAST

Tree · Grass · Weed (3-day)

05 / WALK_SCORE

0.5-mile amenity density

06 / NWS_ALERTS

Active NWS weather alerts

LOCATIONAL_INTEL / REDMOND
Drive times from RedmondLoading

Calculating live drive times to four metro anchors…

Real commute time matters for ADU rent comps — and for our crews. We keep installs within a 60-minute radius of our Puget Sound yard.

Data provenance

Drive times pulled live from the Google Routes API (traffic-aware matrix). Each request is timestamped so you can see exactly when the numbers were last refreshed — no stale brochure data.

Google Routes API · traffic-aware
Street view · RedmondLive imagery
Recent Google Street View imagery centered near Redmond

Lot context matters as much as zoning. We pre-screen access, slope, and tree canopy from imagery before scheduling the site visit.

Google Street View · proxied
Tidal window · RedmondLoading

Waterfront lots: shoreline excavation and barge access windows depend on these. We schedule pours away from extreme low tides when the soils dry unevenly.

NOAA · — mi away
Recent permits · RedmondLoading

Open-data signal of nearby construction velocity — useful for ADU comps and for anticipating examiner workload.

data.seattle.gov · ~3 mi radius
Permit counter · Redmond
Redmond Planning & Community Development
15670 NE 85th St, Redmond 98052
Mon–Fri 8a–5p · digital pre-app required
Local zoning quirk

Education Hill & Grass Lawn lots often hit tree-retention thresholds before FAR — plan crown protection early.

Sourced from Golden State ADU field PMs · WA Lic. GOLDESA747LZ
Best build window
May → October

Bar shows pour-friendly months · dot marks the current month.

  • Seismic
    SDC D · stable plateau geology
  • Soil
    Glacial till on plateau, peat pockets near Sammamish River
  • Climate
    Slightly drier than Seattle (≈34″/yr), east-of-lake sun bonus
  • Topography
    Mostly gentle slope
  • HOA prevalence
    ≈ 28% — Education Hill, Grass Lawn, Idylwood
Transit signal
2 Line Downtown Redmond + Marymoor Village stations (2024)

Station-area lots earn the largest rent premium in this market.

School signal
Lake Washington School District

Rental yield estimate: $2,900–3,700 / mo · Microsoft proximity drives demand

Local incentive

Tech-corridor zoning allows live/work ADU configurations near Overlake

Hidden gem

Tree-retained DADUs in Education Hill pre-lease in <14 days.

Build cost · Redmond vs Puget Sound
+$30 vs regional median
$250 / sqftRedmond$355$425 / sqft
Other cities we hold a permit history in
PERMIT_REDMOND / INTAKE

Stuck at the Intake phase in Redmond? Send the project — we read the queue.

We file dozens of Redmond permits a year and know exactly where the Intake step gets hung up. We'll tell you what's blocking yours.

  • Live read of the Redmond reviewer queue
  • Named contact at the relevant department
  • 1-page action plan emailed within 48h
Replies within 1 business day
WA Lic. GOLDESA747LZBuilding since 2012
Direct line · Golden State ADU(425) 642-4142

We reply within 1 business day. No spam, ever.

◇ No sales script · No spam · Your details stay with our team