Redmond ADU Pre-Application & Intake
Intake is the moment Redmond accepts your ADU permit application as complete enough to assign to reviewers. You upload drawings and forms to the city's online portal, the city verifies the package against its intake checklist, and either accepts it for review or rejects it back for missing items.
Last verified 2026-05-15
| Typical timeline | 1–2 weeks |
|---|---|
| Direct city fees | $200–$450 |
| Reviewing department | Redmond Planning & Community Development |
| Submittal portal | https://www.redmond.gov/175/Planning-Community-Development |
Timeline and fee ranges are project-level averages aggregated from public data and Golden State ADU project history. Authoritative current numbers live in the Redmond published fee schedule and the city's permit portal — verify before budgeting.
What pre-application & intake actually means in Redmond
Permit intake is the administrative front door. Reviewers do not read your plans yet — an intake coordinator checks that the application form, owner authorization, site plan, floor plans, and required reports are present, named correctly, and use the file formats the city expects.
If the package is complete, Redmond routes it into the review queue and your "weeks in review" clock starts. If it is incomplete, the package bounces back. Bounce-backs do not just lose the day you submitted — they push you to the back of the intake queue.
For ADUs specifically, intake usually wants to see scope (AADU vs DADU vs garage conversion), site plan with setbacks and existing structures, dimensional floor plans, and basic project data (height, lot coverage, parking). Energy and structural details often arrive later, but the project description must already match what the zoning code allows.
REDMOND NOTE
Redmond uses a Plan Review Online (PRO) portal — applicants submit a permit request, then receive detailed upload instructions. Improperly named or formatted files may be rejected at intake; paper plans, incomplete applications, and applications delivered by courier are explicitly not accepted.
Why Redmond pre-application & intake hits the high end
- 01Whether the application form, owner authorization, and contractor information are filled in correctly the first time
- 02Whether plans use the city's required file naming and PDF page sizes
- 03Whether a pre-application or pre-submittal meeting is required for the project type
- 04Backlog at the intake desk in peak permit season
Where the dollars actually come from
- 01Most cities collect an application or intake fee at this step; the larger plan review fee usually invoices after intake
- 02Pre-application meetings, when required, may have their own fee
- 03Re-intake after a rejected submittal is generally free, but consultant time to fix the package is not
Exact dollar amounts vary by project. Use the Redmond fee schedule linked below for the current numbers.
Common homeowner mistakes
Cities update their submittal checklists. Pulling last year's checklist almost guarantees a rejection at intake.
Most intake desks reject submittals where plan sheets are not named per the city's standard or are uploaded as a single oversized PDF.
If setbacks, height, lot coverage, or unit count obviously violate the underlying code, intake will catch it before review and ask you to fix the application first.
Pre-Application & Intake checklist
These are typical artifacts for an ADU project at this phase in Washington cities. Exact requirements depend on the project and the current Redmond submittal checklist — verify with the city before submitting.
- Completed permit application form (with parcel ID and project address)
- Owner authorizationRequired when a contractor or designer applies on the owner's behalf.
- Site planExisting and proposed structures, setbacks, easements, lot lines, and dimensions.
- Floor plansDimensions, room labels, doors/windows, and stair locations.
- ElevationsAll sides, with overall height and grade.
- Project data sheetLot size, lot coverage, FAR, parking, height, and ADU type.
- Address verificationSome cities require a new address request for a DADU prior to intake.
When to call a pro
Bring in a designer or ADU-experienced contractor before intake — fixing intake bounce-backs in Redmond is almost always slower than getting the submittal right the first time.
Redmond Pre-Application & Intake questions
How long does Redmond ADU pre-application & intake take?
For an ADU project in Redmond, WA this phase typically runs 1–2 weeks. Complex sites, missing reports, first-time submittals, or busy permit seasons trend toward the upper end. Resubmittals reset the clock for that round. These ranges are project-level averages — verify the current published timeline with Redmond for your specific project.
What does pre-application & intake cost in Redmond?
Direct Redmond fees for this phase typically run $200–$450. That excludes designer/consultant time, impact fees, side-sewer / utility connection charges, and inspection fees that may apply separately. The authoritative current numbers live in the Redmond published fee schedule.
Which Redmond department handles pre-application & intake?
Redmond Planning & Community Development handles this phase; submittals and status live in https://www.redmond.gov/175/Planning-Community-Development. See City of Redmond — Planning & Community Development: https://www.redmond.gov/469/Residential-Permits.
Go deeper: Read the Eastside deck cost & permits: cedar, IPE, composite (2026) guide
What's the most common reason pre-application & intake stalls in Redmond?
Wrong file naming, missing owner authorization, and a site plan that disagrees with the underlying zoning are the usual stall causes in Redmond. We pre-screen every submittal against the current Redmond checklist before it goes to the city.
Go deeper: Read the Eastside deck cost & permits: cedar, IPE, composite (2026) guide
Do I need a contractor or designer for Redmond pre-application & intake?
Not legally required for owner-applicants, but in Redmond every ADU permit eventually touches building, land use, fire, and public works review tracks. A designer of record is effectively required because review comments are technical and time-bound.
Go deeper: Read the Eastside deck cost & permits: cedar, IPE, composite (2026) guide
How do I check Redmond permit status during pre-application & intake?
Redmond publishes live status inside https://www.redmond.gov/175/Planning-Community-Development. The same record carries application data, review comments, fee balances, and (after issuance) inspection results.
Go deeper: Read the Seattle SDCI ADU permit process, step by step (2026) guide
Redmond permit sources we used
Every claim on this page about Redmond permits, fees, portals, or departments traces to an official city or zoning-code source. Numbers in the at-a-glance table come from our project history and public data; verify current values with the city before budgeting.
- City of Redmond — Planning & Community Development · city pageResidential Permits
Redmond residential permits, including ADUs, are handled by Planning's Development Services.
Accessed 2026-06-03
- City of Redmond — Zoning Code · codeRZC 21.08.220 Accessory Dwelling Units (PDF)
Redmond's land-use code section governing ADU purpose, type, size, and siting standards.
Accessed 2026-06-03
- City of Redmond · help articleRedmond Plan Review Online (PRO) overview (PDF)
Redmond's electronic plan-submittal program (PRO) and the rejection rules for paper / mis-named files.
Accessed 2026-06-03
- MyBuildingPermit (E-PermitHub) · portalMyBuildingPermit — Redmond jurisdiction
Redmond uses the MyBuildingPermit portal for application, status, and inspection scheduling.
Accessed 2026-06-03